Application Method of Phase Division of Fast Track for Construction Project with Complex Structures  

Kim, Hyun Soo (SangAh Management)
Hwang, Jae Yoeng (Gyeongsang National University)
Kang, Hyo Jeong (Gyeongsang National University)
Park, Sang Mi (KICT)
Lee, Jae Hee (Gyeongsang National University)
Kang, Leen Seok (Gyeongsang National University)
Publication Information
KSCE Journal of Civil and Environmental Engineering Research / v.42, no.1, 2022 , pp. 95-105 More about this Journal
Abstract
Recently, as the scale of a construction project has become larger and more complicated, there are many cases where construction projects with complex structures are carried out in a fast track method to save construction duration. In the fast track method, the proper division of construction phases is an important issue in determining the overall project period. This study presents a rational phase division method that can be applied when a construction project with complex structures is carried out as a fast track. For this study, a subdivided work breakdown structure (WBS) is developed using the construction of 4 soccer stadiums as application examples, and the schedule is analyzed by dividing the construction process of major phases. To this end, five proposals are applied to analyze the adequacy of the fast track phase division. For the draft with the minimum construction period, the fast track phase division and the schedule model of by each phase were presented. This methodology can have an application in the appropriate phase division and schedule model by construction phase when fast track is applied in large construction project of a similar size.
Keywords
Fast track; Standard schedule; Work breakdown structure; Football stadium;
Citations & Related Records
Times Cited By KSCI : 1  (Citation Analysis)
연도 인용수 순위
1 Correa, J., Hille, G., Ellison, D., Camp, C., Raines, G. and Prentice, C. (2004). "Fast-track design and installation of a 30-inch casing pipe crossing of the ventura river" Pipeline Engineering and Construction, pp. 1-16.
2 Daehan News Article (2018). [Incheon Airport Passenger Terminal 2] How did the design and construction proceed?, Available at: http://m.cnews.co.kr/mobile/read.jsp?idxno=201801120956162300719&where=main (Accessed: Sep 2021).
3 Gruber, A., Williams, B. and Wu, R. (2020). "Beating the clock: Leveraging the flexibility of design-build to fast track pipe delivery." Pipelines, ASCE, 2020.
4 Haddad, S. and Smith, D. R. (1993). "Fast-track stadium." Civil Engineering, ASCE, Vol. 63, No. 2, pp. 52-54.
5 Park, H. K. (2004). "A case study on system implementation of the design management for fast track method in S.O.C project." Journal of the Korean Society of Civil Engineers, KSCE, Vol. 24, No. 1, pp. 439-446.
6 Polk, J. M. and Mitchell, G. L. (2003). "Fast track reconstruction of runway 18R-36L at memphis international airport: A case study" Airfield Pavements Specialty Conference, pp. 507-524.
7 van der Veen, N. (2019). Fast-Track Construction: What Is It, and How to Do It Right?, RMJM Dubai principal, Available at: https://rmjm.com/fast-track-construction (Accessed: Sep 2021).
8 Kim, H. S. (2008). A study for construction of the standard time schedule table of soccer stadium by using fast track method, Master Thesis, Gyeongsang National University (in Korean).
9 Housing Research Institute (2000). A study on the application of fast-track to the turn-key based contract, Report, Korea Housing Corporation, pp. 1-19.
10 Kalach, M., Abdul-Mala, M. and Srour, I. (2021)."BIM-enabled streaming of changes and potential claims induced by fast-tracking design-build projects" Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, ASCE, Vol. 13, No. 1.
11 Lee, B. N. (1997). "The economics of the fast track method and construction business." Journal of Construction Industry Trends, No. 12, pp. 1-9.
12 Cho, K. M., Hyu n, C. T. and Koo, K. J. (2004). "A model for selecting effective fast-track projects in design-build delivery method." Journal of the Architectural Institute of Korea, Vol. 24, No. 1, pp. 459-462.
13 Blakemore, F. and Desai, B. (2006). "Fast-Track Bridge Redecking: Route 64 over Pomme de Terre Lake." Conference of Structures Congress 2006, Civil Engineering, ASCE, pp. 1-7.
14 Byun, E. J., Lim, C. J., Oh, M. J., Heo, N. H. Cho, K. M., Hyun, C. T. and Koo, K. J. (2005). "Application of Fast Track Method to Remodeling Project." Journal of the Architectural Institute of Korea, Vol. 25, No. 1, pp. 321-324.