• Title/Summary/Keyword: Project Manager

Search Result 377, Processing Time 0.025 seconds

A Case Study on the Effectiveness of the Cooperative Management by Leading of Forest Owners and Its Extension System - A demonstrational cooperative management in the private forest guided by the Korean German Forest Management Project - (산주주도형(山主主導型) 협업경영사업(協業經營事業)과 그 지도체계(指導體系)의 효과(效果)에 대한 사례연구(事例硏究) -한독기구(韓獨機構) 사유림협업경영(私有林協業經營) 시범사업(示範事業)을 중심(中心)으로-)

  • Kim, Jong Kwan
    • Journal of Korean Society of Forest Science
    • /
    • v.67 no.1
    • /
    • pp.17-27
    • /
    • 1984
  • The Yangsan Forest Management Station (YFMS) of Korean German Forest Management Project (KGFMP), working with the 6 legal villages of Uljugun, Kyongnam, led the forest owners in the area to organize the Forest Management Cooperative (FMC) voluntairily for improvement of private forest management and fostered it as a model from May 1975 to Apr. 1984. YFMS sent out FMC a forest manager as a forestry expert carrying out the leading extension program at the equal position with forest owners and gave FMC financial, administrative and technical assitances. During the 6 years from 1977 to 1982, 4 FMC were founded and are being operated democratically. 228 forest owners have taken the membership of their own free will and the forestland of the members covers 2,567 ha equivalent to 57% of the total private forest in the area. During the period the total area of the planting and tending is 4,185 ha, this means that a member executed 3.1 ha of forest operations per year in average, showing the high willingness on forest operations. In addition the joint works have resulted in the joint properties equivalent to 27 million Won and it will be an important foundation for operation of FMC which is a forest owners's cooperative organization for improvement of private forest management in this area. The total expenditure spent for the fostering of FMC amounted to 497,587 thousand Won and 58% of them were charged from KGFMP funds, 27% from the forest owners and 15% from public funds. The expenditure for investment was 273,104 thousand Won and 59% of the sum were appropriated as subsidies at the national level. The forest owners charged 43% of that and this means that each member invested approximately 100 thousand Won to his forestland per year in average. For the extension program 169,503 thousand Won were spent and it can be explained that 5,885 Won were spent per ha a year. The organization of FMC operated autonomously in a democratic way and the horizontal and leading extension system, which aspects the human rights, were very much effective in fostering the cooperative organization of forest owners for improvement of private forest management.

  • PDF

Development of Design Process Management Model using Dependency Structure Matrix for Constructability (시공성을 위한 Dependency Structure Matrix 기반의 설계 프로세스 관리 모델 개발)

  • Park, Moon-Seo;Ham, Young-Jib;Lee, Hyun-Soo;Kim, Woo-Young
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.5
    • /
    • pp.65-74
    • /
    • 2010
  • The design with construction knowledge and experience can eliminate inefficiency in the process of construction and improve productivity in all phase of construction project. To utilize constructability knowledge most effectively in design phase, the information must be made available to the design team at the proper point in time. Current methods for effective utilization of constructability knowledge have focused on the structuralization of constructability knowledge such as checklist, which lack the consideration of the proper point in time. However, constructability knowledge which is used at the inapposite point in time consequently leads to unnecessary rework. To minimize this inefficiency and improve productivity, project manager needs to consider the design process and know what constructability knowledge is required for specific design activities. This paper therefore presents a design process management using Dependency Structure Matrix (DSM) that focus on information flows between design activities and constructability knowledge. We expect that the results of this paper will support that design process management become comprehensive management related to every phase of construction project beyond design review or inspection in design phase, and be used as a basis of the integration of design and construction.

A Study of BIM-based Construction Management Work Process Development in Design Phase (설계단계의 BIM기반 CM 업무 프로세스 개발에 관한 연구 - 설계관리 업무를 중심으로 -)

  • Lee, Seoyun;Ham, Namhyuk;Kim, Juhyung;Kim, Jaejun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.6
    • /
    • pp.90-101
    • /
    • 2013
  • A typical construction project involves participation of various parties including clients, contractors, architects, and engineers for its successful completion, and yet has intrinsic differences of interests among the participants during the project execution period. A construction management (CM) services's role is then to resolve these differences of interests among the participants during the project execution, and lead the projects to its successful completion while representing the clients' demands and interests. The use of building information modeling (BIM) is increasing recently among construction projects, and those CM service companies are experiencing difficulties applying BIM. This is because the use of BIM in construction projects suggests a quite new set of operational paradigm. The purpose of this paper is then to review the recent cases of projects which used BIM; to analyze the these projects' processes; to reengineer the design phase process based on the lessons learned from recent BIM application; and to suggest a modified design phase process model that could improve the use of BIM and related coordination operations.

Marketing Organization's Regulatory Focus and NPD Creativity: The Moderating Role of Creativity Enhancement Tools (마케팅 부서의 조절초점과 신제품 개발 창의성: 창의성 증진수단의 조절효과)

  • Kang, Seong-Ho;Son, Jung-Min
    • Journal of Distribution Science
    • /
    • v.14 no.7
    • /
    • pp.71-81
    • /
    • 2016
  • Purpose - Because creativity, which is an intangible resource embedded within the company, can offer a competitive advantage, most companies have an interest in promoting creativity among their employees and division(e.g., marketing organization). Creativity renders a sustainable competitive advantage to a firm because it is a strategic resource that is valuable, flexible, rare, and imperfectly imitable or substitutable. Although most companies broadly recognize the importance of creativity, the methods for developing creativity remain elusive. Therefore, the present study investigates how to structure incentives to motivate employees to be more creative and how to develop tools to facilitate creativity. In detail, the present study aimed to examine the relationship between the regulatory focus of marketing organizations(e.g., promotion focus vs prevention focus) and creativity of marketing organizations. In addition, the present study set out to examine the moderating role of interaction of financial reward and creative training in addition to investigating the direct relationship between creativity and regulatory focus in New Product Development(NPD) context. Research design, data, and methodology - The data used to test the hypotheses are drawn from a survey of full time NPD project members(including project manager, designer, engineer, and marketer). The present study utilized data obtained mainly from a database compiled by the Korea Investors Service-Financial Analysis System which provides comprehensive corporate and financial information on firms listed on the Korea Stock Exchange. A study population comprising 1,000 South Korean firms was obtained from this database. We selected 864 firms from the database, and the firms have experiences of new product development project. We collected a total of 162 responses, for a 18.8% response rate. After we excluded 14 questionnaire because of incomplete responses, a total of 148 questionnaire remained(final response rate: 17.1%). Working with a sample of 148 responses in South Korea, hierarchical moderated regression is employed to test research hypotheses(

    The relationship between promotion focus and creativity of marketing organization,

    The relationship between prevention focus and creativity of marketing organization,

    The moderating effect of joint influences(interaction between financial rewards and creativity training) on the relationship between promotion focus creativity of marketing organization,

    The moderating effect of joint influences(interaction between financial rewards and creativity training) on the relationship between prevention focus creativity of marketing organization). SPSS 18.0 and AMOS software were used in the data analysis. Results - The empirical study confirmed that promotion focus of marketing organization is positively related to creativity of marketing organization. Also, prevention focus of marketing organization is positively affected to creativity of marketing organization. In addition, the interaction between financial rewards and creativity training moderated the relationship between regularity focus(e.g.), promotion focus vs prevention focus) and creativity of marketing organization. These results suggest that managers can improve the performances of their creative efforts by providing the use of financial rewards and creativity training in combination. Conclusion - Based on results of this study that examine the effects of regulatory focused creative efforts on creativity of marketing organization, promotion focus is helpful with marketing organizations to enhance their service innovation and performance. Prevention focused organization should allow monetary rewards and creativity training to increase their creativity for innovation of new products.

Education Needs Assessment of Managers for Learning Organization in Small and Mum Enterprises (중소기업 학습조직 담당자의 교육 요구조사)

  • Lim, Se-Yung;Yeom, Myeong-Guk
    • 대한공업교육학회지
    • /
    • v.37 no.2
    • /
    • pp.1-19
    • /
    • 2012
  • In this study, to figure out the demands for learning, a survey was conducted on learning organization agents participating in learning organization project supported by public fund, through measuring their awareness level of the role and tasks drawn from the precedent study. This questionnaire was developed with four roles and twenty competencies drawn from the precedent study. After conducting the survey on over 200 small and medium corporations participated in learning organization project, the data was analyzed about the role and competency from 123 answer sheets collected. The results were as following First, the awareness of role importance was higher(4.36) than present level(3.73), and was important in order of innovator, operator, spreader, promoter. Second, in competitive importance of learning organization agents, the role of spreader was high, that of promoter was low. Third, in awareness level of learning organization agents, the demand level was generally high(4.1), but acquired level was generally low, so there was a wide gap between the demand level and acquired level. Forth, From the analysis result of those data about work competency of learning organization agents, learning organization promoter and learning leader, KMS operator ability and outcome were come out to be necessary, and next administrative ability about organization changes were come out to be necessary.

A Case Study on Conflict Types and Management for Technology Valuation Project (기술가치평가 과제관리의 갈등관리에 관한 사례연구)

  • LEE, Yun Hee;Sohn, Young Hwan;Yoo, Myoung Kwan
    • Journal of Korea Technology Innovation Society
    • /
    • v.21 no.1
    • /
    • pp.130-150
    • /
    • 2018
  • Technology valuation refers to the act, procedures, or techniques in evaluating certain technology and its value for commercialization. For this purpose, deadlines and process plans are established based on valuation goals such as technology transfer, investment and financing, investment in kind, and strategy establishment. The technology valuation process involves analyzing and evaluating technology performance, rights, marketability, and business value technology, as well as calculating the monetary value of technology modules based on the results. Analysis and evaluation of each module is performed by a team of experts having knowledge of specific technology. Valuation of technologies is conducted as independent projects by project managers (PM) who integrate and manage modules; they must have expertise in systematic performance of task support and management to ensure objectivity and reliability. Furthermore, the valuation team comprises expert stakeholders having knowledge about each module due to the nature of technology valuation. For smooth knowledge sharing in technology and valuation procedures, communication skills and roles of PMs supporting and managing the valuation are important. Primarily, PMs must resolve conflicts between evaluators participating in different tasks, evaluators and evaluatees, and technology holders and receivers. This study examines technology valuation for four conflicts occurring frequently among stakeholders providing valuation support to PMs, and seeks resolutions. The conflicts and resolutions discussed in this study may lead to more specialized roles of PMs in technology valuation and project management, as well as systemized valuation support and management plans.

The Effect of Organizational Social Network Characteristics on Absorptive Capacity and Innovation Performances (조직의 사회네트워크 특성이 흡수역량과 혁신성과에 미치는 영향)

  • Kang, So-Ra;Moon, Yun-Ji
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.11 no.10
    • /
    • pp.3761-3771
    • /
    • 2010
  • This study, based on social capital theory, aims to explore how social network characteristics among organization members affect the absorptive capacity which is the ability to recognize the value of new information, assimilate it, and apply it to commercial ends. This paper also empirically investigates how the absorptive capacity will have an effect on organizational innovation performances toward achieving competitive advantages in the knowledge society. According to the degree of relationship intensity, social network shows two different characteristics: strong tied network and weak tied network. As strong tied network and weak tied network have relatively different network characteristics, this study assumes that each network affects the absorptive capacity with different aspects. Furthermore, we consider the moderation effect of a social network manager's ability in the relationship between social network and absorptive capacity. We surveyed innovative project performers who are engaged in the knowledge based industries. The empirical analysis results show that both strong tied and weak tied network positively affect the absorptive capacity. Successively, the absorptive capacity also has a positive impact on innovation performances.

Development of a Business Support System by Phase for Delivering Construction Management Contract in the Government Civil Project (공공토목사업 CM 발주를 위한 단계별 업무지원 시스템 구축)

  • Chae, Yeong-Seok;Park, Seo-Young;Moon, Hyoun-Seok;Kim, Seon-Yeong;Kang, Leen-Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.5
    • /
    • pp.81-92
    • /
    • 2011
  • Recently, the MLTM (Ministry of Land, Transport and Maritime Affairs) has announced CM business guidelines, because it is expected that the CM deliveries are going to be increased for a civil engineering industry with enforcement of the CM at Risk. In this trend, The CM business guideline, which is currently announced, is for the steps after the CM contract. However, the practical business guideline from a planning phase for the CM delivery to a selection phase of a CMr (Construction Manager) is essential for public construction projects including the civil engineering projects that the frequency of the CM deliveries is not sufficient. Therefore, this study established a standardized process model from the planning phase for the CM delivery to the selection phase of the CMr. study configured a business breakdown structure for CM delivery. A prototype system for supporting the CM delivery was also developed, and a practical operability was verified by a case evaluation based on the developed system. Hence, it is expected that this study will be utilized as a supporting system of the CM delivery business for public clients, which have not sufficient cases of the CM delivery.

Analysis of the commercial diving national qualification system for the introduction of a diving supervisor (잠수기능장 제도 신설을 위한 산업 잠수 국가자격체계 분석)

  • Sim, Kyoung-Bo;Cha, Joo-Hong;Kang, Sin-Young
    • Journal of Advanced Marine Engineering and Technology
    • /
    • v.40 no.7
    • /
    • pp.655-662
    • /
    • 2016
  • This study proposes that a diving supervisor, who can perform the role of both a field manager and a supervisor, be introduced in the national qualification system. The goal was achieved by surveying the general status of the commercial diving sector, including the statistics of an underwater construction company, commercial diving equipment operation condition, diver working hours, diver supply and demand status, and underwater construction market size. The national qualification and national competency standard (NCS) systems were also analyzed to deduce the role definition and work scope of the diving supervisor. Consequently, the following proposition is made: the diving supervisor should be an "on-site manager with the highest job skill in the commercial diving field, who can perform the on-site process management as well as guide, supervise, and educate project participants and serve as an intermediary between the contractor and the workers." The responsibilities of the diving supervisor are proposed to include "diving planning and operation of the diving team," "diving with surface-supplied air and mixed-gas diving system," "chamber operation," "underwater construction," and "ship salvage." The persistent issues in commercial diving sectors, such as diver career development, management, and worker supervision, are expected to be largely resolved with the introduction of this qualification.

A Reservation based Network Resource Provisioning Testbed Using the Integrated Resource Management System (통합자원관리시스템을 이용한 예약 기반의 네트워크 자원 할당 테스트베드 망)

  • Lim, Huhn-Kuk;Moon, Jeong-Hoon;Kong, Jong-Uk;Han, Jang-Soo;Cha, Young-Wook
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.36 no.12B
    • /
    • pp.1450-1458
    • /
    • 2011
  • The HPcN (Hybrid & high Performance Convergence Network) in research networks means environment which can provide both computing resource such as supercomputer, cluster and network resource to application researchers in the field of medical, bio, aerospace and e-science. The most representative research network in Korea, KREONET has been developing following technologies through the HERO (Hybrid Networking project for research oriented infrastructure) from 200S. First, we have constructed and deployed a control plane technology which can provide a connection oriented network dynamically. Second, the integrated resource management system technology has been developing for reservation and allocation of both computing and network resources, whenever users want to utilize them. In this paper, a testbed network is presented, which is possible to reserve and allocate network resource using the integrated resource management system. We reserve network resource through GNSI (Grid Network Service Interface) messages between GRS (Global Resource Scheduler) and NRM (Network Resource Manager) and allocate network resource through GUNI (Grid User Network Interface) messages between the NRM (network resource manager) and routers, based on reservation information provided from a user on the web portal. It is confirmed that GUNI interface messages are delivered from the NRM to each router at the starting of reservation time and traffic is transmitted through LSP allocated by the NRM.