Browse > Article
http://dx.doi.org/10.6106/KJCEM.2010.11.5.65

Development of Design Process Management Model using Dependency Structure Matrix for Constructability  

Park, Moon-Seo (서울대학교 건축학과)
Ham, Young-Jib (서울대학교 건축학과 대학원)
Lee, Hyun-Soo (서울대학교 건축학과)
Kim, Woo-Young (한국건설산업연구원)
Publication Information
Korean Journal of Construction Engineering and Management / v.11, no.5, 2010 , pp. 65-74 More about this Journal
Abstract
The design with construction knowledge and experience can eliminate inefficiency in the process of construction and improve productivity in all phase of construction project. To utilize constructability knowledge most effectively in design phase, the information must be made available to the design team at the proper point in time. Current methods for effective utilization of constructability knowledge have focused on the structuralization of constructability knowledge such as checklist, which lack the consideration of the proper point in time. However, constructability knowledge which is used at the inapposite point in time consequently leads to unnecessary rework. To minimize this inefficiency and improve productivity, project manager needs to consider the design process and know what constructability knowledge is required for specific design activities. This paper therefore presents a design process management using Dependency Structure Matrix (DSM) that focus on information flows between design activities and constructability knowledge. We expect that the results of this paper will support that design process management become comprehensive management related to every phase of construction project beyond design review or inspection in design phase, and be used as a basis of the integration of design and construction.
Keywords
Design process; Constructability; Dependency Structure Matrix(DSM);
Citations & Related Records
Times Cited By KSCI : 4  (Citation Analysis)
연도 인용수 순위
1 Browning T. R. (2001), "Applying the design structure matrix to system decomposition and integration problems: a review and new directions", IEEE Transactions on Engineering Management, 48(3), pp.292-306.   DOI   ScienceOn
2 Yassine, A. Falkenburg, D, and Chelst, K. (1999). "Engineering design management: An information structure approach." Int. J. Prod, Res. 3713, pp. 2957-2975.
3 Griffith, A and Sidwell, A. C. (1995), Constructability in Building and Engineering Projects. pp.85-105
4 Huovila, P., Koskela, L., Lautanala, M., Pietilainen, K., and Tanhuanpaa, V. (1995). "Use of the design structure matrix in construction." Proc., 3rd Int. Workshop on Lean Construction, VTT Building Technology, Finland.
5 Koskela, L., Huovila, P. and Leinonen, J. (2002). "Design management in building construction: from theory to practice". Journal of construction research. 3(1), pp.1-16   DOI
6 Oloufa, A. A., Hosni, Y. A., Fayez, M and Axelsson, P. (2004). "Using DSM for modeling information flow in construction design projects", Civil Engineering and Environmental Systems, 21(2), pp, 105-125   DOI   ScienceOn
7 Maheswari, J. U. Vargehese, K. and Sridharan, T. (2006) "Application of dependency structure matrix for activity sequencing in concurrent engineering projects", ASCE Journal of Construction Engineering and Management 132 (5), pp, 482-490.   DOI   ScienceOn
8 McCord, K. R. and Eppinger. S. D, (1993) "Managing the Integration Problem in Concurrent Engineering," Massachusetts Institute of Technology Sloan School of Management Working Paper, 3594-93-MSA.
9 O'Connor, J.T and Miller, S.J. (1995), "Overcoming Barriers to Successful Constructability Implementation Efforts", Journal of Performance of Constructed Facilities. 9(2), pp. 117-128.   DOI
10 Pulaski, M. H. & Horman, M. J. (2005). "Organizing Constructability Knowledge for Design,", Journal of Construction Engineering and Management. 131(8), pp. 911-919   DOI   ScienceOn
11 Steward, D. (1965). "Partitioning and tearing systems of equations." Journal on Numerical Analysis, 2(2), pp. 345-365.
12 Steward, D. (1981). Analysis and Management: Structure, Strategy and Design, Petrocelli Books
13 Uhlik, F. T., and Lores, G. V. (1998). "Assessment of constructability practices among general contractors." J. Archit. Eng., 4(3), pp,113-123.   DOI   ScienceOn
14 권동혁 외 1명 (2003). "고층사무소 프로젝트 시공성 분석 연구", 대한건축학회 논문집, 19(3), pp.155-162
15 김문한 (2006), 건축생산관리학, 기문당, pp.189-213
16 배정익 외 2명 (2006). "설계관리 모델 개발을 위한 설계업무 프로세스 개선 방향 제시", 한국건설관리학회 논문집, 7(6). pp.90-98   과학기술학회마을
17 김한수 (2002), "건설산업의 효율성 및 생산성 향상 전략: 영국건설산업 혁신운동의 벤치마킹 결과를 중심으로", 세종대학교
18 박장수 외 4명 (2009). "강구조물 공사의 시공성 향상을 위한 체크리스트 개발", 대한건축학회 논문집, 25(12), pp.197-206
19 박찬식 (2000) "Value engineering vs. Constructability", 한국건설관리학회 학회지, 1(3), pp.13-16
20 장세훈 (2007), "DSM을 이용한 건설사업 공정관리에 관한 연구", 한국건설관리학회 학술발표대회 논문집, pp.682-686
21 전재열 (2003). "건축설계단계에서 협력설계 의사결정을 통한 적정 부위 대안 선정 알고리즘에 관한 연구", 대한건축학회 논문집, 19(11). pp.199-206
22 Arditi, D. El, hassan, A. and Toklu, C. (2002). "Constructability analysis in the design firm.", Journal of Construction Engineering and Management, 128(2), pp.117-126.   DOI   ScienceOn
23 Construction Industry Institute(CII). (1986), Constructability: A Primer, Publication.
24 DSMweb.org, (2005). The Design Structure Matrix Web Site. Retrieved 2005-03-15, from http://www.dsmweb.org/
25 Fisher, M. and Tatum, C. B. (1997), "Characteristics of Design-Relevant Constructability Knowledge", Journal of Construction Engineering and Management. 123(3), pp. 253-260   DOI   ScienceOn
26 Gebala, D. A and Eppinger S. D. (1991). "Methods for Analyzing Design Procedures", ASME Conference on Design Theory and Methodology, Miami, pp. 227-233
27 Glavinich, T. E. (1995), "Improving Constructability During Design Phase", Journal of Architectural Engineering, 1(2), pp. 73-76   DOI