• Title/Summary/Keyword: Project Management Remodeling

Search Result 98, Processing Time 0.026 seconds

The Economic Comparision through LCC Analysis on each Graded Alternatives for Green Remodeling of Public Building (공공건축물의 그린리모델링 수준별 LCC (Life Cycle Cost) 분석을 통한 경제성 비교)

  • Kim, Jaemoon;Lee, Junghyuk;Lee, Duhwan
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.2
    • /
    • pp.38-49
    • /
    • 2018
  • Since the ratification of the Paris Agreement (COP21), the government is continuously strengthening policies for the reduction of greenhouse gas of the construction industry in accordance with the growing importance of reducing greenhouse gas and obligation of the government. Especially, the government emphasizes the need to improve the energy performance of old public buildings. Since 2014, the government is running a pilot project in which the government supports the construction cost of the green remodeling project of old public buildings and it is intended to develop the best practice of green remodeling and activate the green remodeling in the private sector. In this study, we analyzed the economical efficiency of the old public buildings by each level through green remodeling and conducted building related investigation and equipment measurement to plan the alternatives of the corresponding buildings. The improvement plan is a green remodeling plan that integrates alternatives. Five improvement plans were developed for each level to analyze the economic feasibility of each plan. As for the analysis method, the first energy demand amount calculation and the LCC analysis were performed through ECO2. In the LCC aspect, the improved 3/4 plan (middle level plan) was the most excellent and results were obtained in the order of the highest cost plan followed by the lowest cost plan. As a result, it is expected that it can be utilized as a basic data for future green remodeling performance plan and economic feasibility analysis in the future.

A study of Application to the Marketing positioning and Construction Management in Apartment remodeling (공동주택 리모델링에 관한 포지셔닝 및 건설사업관리 적용 방안)

  • Lee, Jeong-Bok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.6 s.28
    • /
    • pp.124-132
    • /
    • 2005
  • The efficient preservation and improvement of stock buildings including houses have become a significant national issue coming into the 21st century. The increase rate of new house demands have lessened and the efficient management and usage of old buildings have become more important. However, lacking research on the effects obtained through remodelling and the perception that it is less profitable than reconstruction have interfered with the vitalization of the market. Also, the excessive profit rate contractors insist have caused conflict between the residents and contractor and weakened market stability. This research examines the related codes, the strengths and weaknesses of marketing positioning in apartment remodelling a rational method for analyzing each project and the working process. A survey was performed to investigate preferences and priorities between the business methods in order to obtain advices that can smoothly progress each project and improve overall building quality. Through this study, the flow of remodeling market is elevated reaching the level in advanced nation.

An Evaluation of the Importance of Risk Factors for the General Hospital Remodeling Approached by Analytic Hierarchy Process (AHP) (AHP 분석을 통한 종합병원 리모델링 공사의 리스크 요인 우선순위 평가)

  • Moon, Seong Joo ;Go, Seong Seok
    • Journal of The Korea Institute of Healthcare Architecture
    • /
    • v.30 no.3
    • /
    • pp.45-56
    • /
    • 2024
  • Purpose: It is important to note that the relative importance of risk factors should be identified to successfully complete the remodeling project of general hospital. Approached by analytic hierarchy process (AHP), the present study aimed to systematically evaluate the risk factors for remodeling of general hospital. Methods: The present work classified the risk factors of general hospital remodeling into four major categories including the requirements survey stage, planning and design stage, dismantling and construction stage, and maintenance stage. In addition, four sub-categories were derived from each major category factor. Furthermore, five major categories and four subcategories were selected to be considered from the perspectives of two stakeholders of contractor and constructor. The relative importance of the major and sub-categories factors was calculated using the AHP technique on the survey data collected from 49 respondents who participated in the survey study. Results: The results indicate that, the risk factor of requirements survey stage was found to be the most important risk factor to consider among the four major categories of factors. Also, insufficient preliminary investigation, design inconsistencies in architecture/mechanics/electricity, occurrence of safety accidents, and insufficient review of various equipment capacities and performances were found to have the highest priorities of each subcategory factor group included in the four major categories. From the perspective of contractor, the error in predicting the construction period was found to be the most important risk factor. The occurrence of safety accidents during construction was found to be the most important risk factor to be considered by constructor. Implications: The result of the current work should provide important insights and guidelines for the risk management activity that contributes to controlling the project time, cost, and scope required for general hospital remodeling.

A Study of Planning and Application of Fire Protection Facilities in Remodeling (리모델링시 소방시설의 계획 및 적용에 관한 연구)

  • Jung, Jin-Ho;Yun, Myung-O;Je, Jin-Ju
    • Fire Science and Engineering
    • /
    • v.22 no.5
    • /
    • pp.90-98
    • /
    • 2008
  • There are diverse barriers such as limits to space, time, economy, technology, institution, and etc. in remodeling construction compared to new construction and it needs to overcome such limits. Consequently, for effective performance of construction, planning and application fit for remodeling characteristics shall be made available in time and various studies into remodeling for each construction category are necessary to achieve this. Taking these into account this study conducted research of the followings to draw out necessary steps for planning and application of fire protection facilities in remodeling, to overcome various barriers that may arise during any project operations, and to provide useful materials for construction of reasonable and effective fire protection system.

Decision Criterion in Military Apartment Remodeling Project (군인아파트 리모델링에 있어서 항목별 우선순위 결정에 관한 연구)

  • Ryu Kuk-Mu;Kim Gil-Su;Shin Chang-Hyun;Jung Yong- Sik;Chun Jae-You
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.277-280
    • /
    • 2004
  • Since the beginning of our military history, we are continuously interested in supplying apartment for military officers. So we possessed 72,361 households and used in 2002 however, $18\%$ of those are over 20years and need to be remodeled Department of Military has taken this fact seriously To solve the problems, they built more new buildings, rent public buildings and remodeled the old one But, The procedure of present military apartment remodeling has many problems at the stage of evaluating the priorities in various remodeling projects which have been caused from lots of corps. I've reviewed the study of military apartment business and applied the AHP(Analytic Hierarchy Process) method which is effective to evaluate the priority in various groups' decision.

  • PDF

A Study on Normal Project Period for Parking Lot of Aged Apartment Housing (노후 공동주택 주차장 리모델링 공사 표준공기 설정에 관한 연구)

  • Bang, Seongbae;Jang, JunYoung;Koo, Choongwan;Kim, Taewan;Lee, Chansik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.6
    • /
    • pp.107-119
    • /
    • 2021
  • Recently, interest in remodeling apartment houses has been increasing due to problems such as a lack of parking spaces for old apartment houses. However, no method was suggested to predict the construction period of the apartment remodeling project. Unlike general apartment new construction, apartment remodeling construction involves demolition or reinforcement work, so a realistic remodeling construction period calculation plan differentiated from the existing construction period should be proposed. Therefore, this study intends to present a model for deriving the construction period of the underground parking lot of the apartment remodeling construction. Each construction period was calculated based on 19 activities of underground parking lot remodeling work through review of previous studies and expert advice. Activity's workload data and productivity data were derived to calculate the construction period, and the number of inputs and equipment inputs by Activity were determined to correct the productivity data. The construction period of Activity was calculated using the derived data, and the criteria for calculating the overlapping period for each Activity were presented to enable realistic construction period and scheduled schedule. As a result of predicting the accuracy of the construction period through the verification of the case complex, it is expected that it will be possible to predict the approximate construction period of the underground parking lot of the apartment remodeling construction in the future.

The Analysis of the Importance of Influencing Factors in the Planning Stage of the Long-Term Public Rental Housing of Remodeling Project (장기공공임대주택 리모델링 사업의 기획단계 영향요인 중요도 분석)

  • Jung, Yong-Chan;Jin, Zheng-Xun;Hyun, Chang-Taek;Lee, Sanghoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.25 no.3
    • /
    • pp.3-16
    • /
    • 2024
  • The government announced the Housing Welfare Roadmap (November 2017), to expand the supply of public rental housing by reconstructing aged long-term public rental complexes. Also, remodeling projects for complexes with low business feasibility of reconstruction projects are recognized as an alternative to supplying public rental housing in urban area. This study analyzed influence factors by dividing them into project feasibility, architectural plan, urban & residential environment plan, and legal system groups in order to establish a plan for long-term public rental housing remodeling project. Futhermore, this work conducted the principal component analysis to get the principal component factors among the influence factors of each group, and the weight analysis to calculate weighting of them. In addition, major influence factors were derived by calculating the relative importance score (RIS) of each factor. Lastly this paper validated the major influence factors and applicability of the procedure to select 3 complexes that can be reviewed for remolding project among 33 long-term public rental housing complexes located in Seoul. The results of this study are expected to be useful when establishing a remodeling project plan for long-term public rental housing.

A Study on Determinants for Apartment Remodeling in Seoul Metropolitan Area (아파트 리모델링을 위한 의사결정 요인에 관한 연구 - 서울 및 경기 수도권을 중심으로 -)

  • Cho, Yongkyung;Lee, Jaewon;Lee, Sangyoub
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.6
    • /
    • pp.57-65
    • /
    • 2019
  • If aging apartments are left unimproved through remodeling, the city will be eventually slum. As the government recognizes remodeling as an alternative to reconstruction, the law has been revised mainly to increase the housing area, increase the number of house and allow the vertical extension for making remodeling costs. However, the remodeling is still not activated yet in the market. Therefore, this study analyzes the decision factors of apartment remodeling in Seoul metropolitan area based on Heckman two-stage analysis considering sampling error. Research findings indicate that the decision for remodeling is determined by the characteristics of the household, housing, and time-lapse variables. And also the number of household members, net assets, housing satisfaction, the 11-20, 21-30, and more than 30 years of building are identified as the significant variables as a result of remodeling choice probability analysis. It is noteworthy that the significant variables from then remodeling cost analysis are net assets, area, more than 30 years of building, and unit housing price. It is also notable that the policy, which extend the housing area to cover remodeling cost, are not actually effective to activate the remodeling, and the age in the case of elderly people in Seoul and Gyeonggi-do who are expected to have high net assets and income is not significant variables. This study is expected to provide more objective and reliable implication to the policy makers, the home owner and the investors on the decision making process related to the remodeling project.

A Scheduling Method Of Dismantling Work Considering Specific Condition Of Remodeling Project - Focused on Old Aged Apartment House with Wall-Slab Structure - (리모델링의 특성을 반영한 철거공사의 공정계획 수립방안 - 벽식구조 노후 공동주택을 대상으로 -)

  • Kang, Sa-Yil;Hwang, Young-Kyu;Kim, Kyung-Rai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.5
    • /
    • pp.104-115
    • /
    • 2008
  • Currently, reconstruction and remodeling are conducted to improve the performance of aged housing. Recently reconstruction has caused many problems such as wastes generation, wasting resources and real estate speculation, remodeling is drawing attention. Accordingly, remodeling business for aged housings gradually increasing, but the use of scheduling method not considering characteristics of remodeling deters construction in some construction types. Especially, in case of dismantling construction, the dismantling is delayed since the scheduling method not considering characteristics of remodeling is used. In case of remodeling, dismantling construction is ahead of other processes, if the dismantling construction is delayed, whole construction will be delayed and if speedy construction is conducted, the costs for remodeling will increase. Furthermore, existing remodeling for aged housing has been for rahmen(crossbeam and pillar) structure apartments, but since most apartments to be remodeled are wall-slab structure where dismantling takes a lot of weight, it is highly possible the dismantling construction is delayed. Thus, this paper is to establish scheduling method for the dismantling construction reflecting characteristic of remodeling to prevent delay of dismantling construction for remodeling of aged housing with wall-slab structure.

A study on the effectiveness of Senior living environmental improvement through remodeling of old apartment complex (노후 임대아파트단지 리모델링을 통한 노인거주환경개선효과에 관한 연구)

  • Kwon, Soonjung;Kang, Hyojin;Oh, Ga Young;Kim, Seok Jun
    • Journal of The Korea Institute of Healthcare Architecture
    • /
    • v.23 no.4
    • /
    • pp.93-104
    • /
    • 2017
  • Purpose: Korean society has already entered an aged society but there aren't many evidence-based studies on the elderly-friendly design elements in the apartment environment, which is the main residential type in Korea. The main purpose of this study is to verify the necessity and expandability of the outdoor environment design in the public rental apartment complex through the evaluation of the effectiveness and satisfaction of SMG(Seoul Metropolitan Government) Cognitive Health Design Project in GR 1 apartment complex. Methods: The research subjects were GR 1-complex as experimental group and the nearby Wolgye Deer 1-complex as control group, both public rental apartment and located in Seoul. As a research method, the survey was conducted before and after the implementation of SMG project for residents of the apartment. A total of 200 preliminary surveys and 203 post surveys were conducted. Results: As a result of this study, residents' accidents related safety have decreased, and both the frequency of use and satisfaction of most facilities have increased. It is noteworthy that the increase in cognitive items in the post-survey. Also, 74.5% of the residents evaluated that the complex was better to live after the project was implement. Implications: The fact that the preliminary surveys were not conducted for the same person is considered as the limitation of the study, but it is meaningful in that it systematically assesses the effectiveness of the project on the cognitive health of the outdoor residential environment towards age-friendly city.