A Scheduling Method Of Dismantling Work Considering Specific Condition Of Remodeling Project - Focused on Old Aged Apartment House with Wall-Slab Structure -  

Kang, Sa-Yil (아주대학교 건축학과 대학원)
Hwang, Young-Kyu (아주대학교 건축학과 대학원)
Kim, Kyung-Rai (아주대학교 건축학과)
Publication Information
Korean Journal of Construction Engineering and Management / v.9, no.5, 2008 , pp. 104-115 More about this Journal
Abstract
Currently, reconstruction and remodeling are conducted to improve the performance of aged housing. Recently reconstruction has caused many problems such as wastes generation, wasting resources and real estate speculation, remodeling is drawing attention. Accordingly, remodeling business for aged housings gradually increasing, but the use of scheduling method not considering characteristics of remodeling deters construction in some construction types. Especially, in case of dismantling construction, the dismantling is delayed since the scheduling method not considering characteristics of remodeling is used. In case of remodeling, dismantling construction is ahead of other processes, if the dismantling construction is delayed, whole construction will be delayed and if speedy construction is conducted, the costs for remodeling will increase. Furthermore, existing remodeling for aged housing has been for rahmen(crossbeam and pillar) structure apartments, but since most apartments to be remodeled are wall-slab structure where dismantling takes a lot of weight, it is highly possible the dismantling construction is delayed. Thus, this paper is to establish scheduling method for the dismantling construction reflecting characteristic of remodeling to prevent delay of dismantling construction for remodeling of aged housing with wall-slab structure.
Keywords
Wall-slabstructure housing; remodeling; dismantling construction; scheduling method;
Citations & Related Records
Times Cited By KSCI : 2  (Citation Analysis)
연도 인용수 순위
1 대한주택공사 도시개발사업단 리모델링부, '마포용강 시범 아파트 리모델링 사업지', 대한주택공사, 2003
2 서현 업무시설 리모델링 현장팀, '서현266 업무시설 리모 델링', 대림산업, 2007, pp. 27-44
3 홍성욱 외 1인, '건축리모델링 공사의 전략적 리스크 대응 방안에 관한 연구', 대한건축학회논문집, 대한건축학회, 제 20권 11호, 2004, pp.153-160
4 최재필 외 3인,' 노후 공동주택 리모델링의 평면확장 유형 과 특성에 관한 연구', 대한건축학회논문집, 대한건축학회, 제22권 10호, 2006, pp. 93-102
5 최재필 외 3인,' 노후 공동주택의 구조 및 설비성능개선 기 술개발(1)', 건설핵심기술연구개발사업 제2차년도 연차보 고서, 한국건설교통기술평가원, 2007
6 여운용 외 3인,' 건축물 리모델링 프로젝트 사례적용에 의 한 시공관리 개선방안', 한국건설관리학회논문집, 한국건 설관리학회, 제5권 4호, 2004, pp.122-129
7 이은희 외 1인,' 공동주택 리모델링 프로세스에 관한 연구', 대한건축학회 학술발표대회논문집, 대한건축학회, 제23권 1호, 2003, pp.27-30