Abstract
There are diverse barriers such as limits to space, time, economy, technology, institution, and etc. in remodeling construction compared to new construction and it needs to overcome such limits. Consequently, for effective performance of construction, planning and application fit for remodeling characteristics shall be made available in time and various studies into remodeling for each construction category are necessary to achieve this. Taking these into account this study conducted research of the followings to draw out necessary steps for planning and application of fire protection facilities in remodeling, to overcome various barriers that may arise during any project operations, and to provide useful materials for construction of reasonable and effective fire protection system.
리모델링공사는 공간적한계성, 시간적한계성, 경제적한계성, 기술적한계성, 제도적한계성 등과 같이 신축공사에 비해 다양한 공사제약이 존재하며 이러한 한계성을 극복하고 진행되어야 하는 사업이므로 효율적인 건설사업 수행을 위해서는 리모델링의 특색에 맞는 계획 및 적용이 적시에 이루어져야 하고, 건설 각 부문별로 리모델링에 관한 다양한 연구가 진행되어야 할 것이다. 이에 본 연구에서는 리모델링시 소방시설의 계획 및 적용에 필요한 과정들을 도출하고, 사업진행시 발생될 수 있는 다양한 제약을 검토하여 합리적이고 효율적인 소방 시스템을 구성하는데 도움이 될 수 있는 자료를 제공하고자 한다.