BIM based Construction Progress Monitoring System Integrated with IOT (사물인터넷을 활용한 BIM기반 건설 진도율 모니터링 시스템)

  • Son, Sang-Hyuk;Lee, Dong-Eun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.05a
    • /
    • pp.130-131
    • /
    • 2015
  • Accurate construction progress measurement is an important issue for successful project delivery. This paper presents a method that keeps track of the progress measurement involved in construction operations and facilities visualization of the data using BIM and IOT. To verify the method, a residential house project was used for the case study. Test case verifies the usability and validity of the method implemented in the system.

  • PDF

Customized Safety Information Delivery System for Unskilled Construction Worker Training

  • Jo, Junhyeon;Baik, Sangeun;Pedro, Akeem;Lee, Doyeop;Park, Chansik
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.525-532
    • /
    • 2022
  • Accidents at construction sites in Korea account for more than half of all industrial accidents. To solve this problem, a policy to strengthen safety education was implemented to ensure the safety of workers. However, it was analyzed that there is a high possibility of accidents because workers did not receive proper safety information for each risk factor due to general lecture-style education. In addition, statistics show that the accident status of workers with fewer years of period is high, indicating that a customized information delivery method needs to be proposed for unskilled workers with fewer years of period. Research on the importance of education has been conducted, but no information delivery method has been identified. For unskilled workers to effectively receive safety information, appropriate delivery formats (text, photos, illustrations, 4D-BIM, 360-based panorama, video, animation) were analyzed, and a new method of education was proposed. If customized safety information is provided according to this proposal, effective information delivery to unskilled workers will be possible, and it is expected to be verified in various ways.

  • PDF

AA Study on the Selection Criteria for Delivery Systems of Public Construction Projects in Local Governments (지자체 공공건설사업의 발주방식 선정기준에 관한 연구)

  • Choi, Eun-A;Kim, Byung-Ok;Lee, Sang-Beom
    • Journal of the Korea Institute of Building Construction
    • /
    • v.9 no.5
    • /
    • pp.111-117
    • /
    • 2009
  • With the current trend in the industry toward increasingly complex, diversified and large construction projects, advanced countries in the construction field have already introduced and applied a variety of methods for placing orders in order to cope with such changes in construction circumstances. In Korea, there have been efforts to continuously improve approaches to placing an order. With the aim of diversifying the methods of Delivery Systems, the "Technical Proposal Type Bid," and the "Design Competition and Technical Proposal Type Bid" were introduced through a revision of Korea's contract law enforcement ordinance. In line with the government's efforts, criteria for a method of placing an order that is suitable for a public construction project should be presented. This study enumerates the current issues using a survey for construction projects already placed and an analysis of the current status, and presents the selection criteria for Delivery Systems by business type as an improvement for the problem.

Defining Business Process Improvement(BPI) Projects with Analysis Results Based on the Cause-and-Effect Chain (인과관계체인 기반의 분석 결과를 활용한 비즈니스 프로세스 개선 과제 정의)

  • Kang, Jun-Gyu;Lim, Seung-Kil
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.38 no.1
    • /
    • pp.101-109
    • /
    • 2015
  • This paper suggests a procedure to define business process improvement (BPI) projects with analysis results based on the cause-and-effect chain. The procedure developed in this paper focuses on eliminating root causes of business problems resulted from abnormal events occurred in business process executions. First, we develop three criteria used to make clusters of the root causes where a cluster of root causes will be eliminated together by a BPI project defined based on the cluster. Second, we develop a method to formulate desired expectations from the BPI project. Also, we suggest a method to calculate the relative importance of the BPI projects that help a BPI organization determine priorities of them. We illustrate the procedure and the methods with some examples for the domestic mail delivery process in the postal service industry.

Risk Ranking for Tunnelling Construction Projects in Malaysia

  • Ghazali, F.E. Mohamed;Wong, H.C.
    • Journal of Construction Engineering and Project Management
    • /
    • v.4 no.1
    • /
    • pp.29-36
    • /
    • 2014
  • Tunnelling has become a preferred method of construction for road and highway projects in countries with a lot of hilly slope geological conditions such as found in Malaysia. However the construction works of a tunnelling project are usually complicated and costly, which consequently impose great risks to the parties involved. This paper identifies the key significant risks and sub-risks for tunnelling construction projects in Malaysia through a case study. Interview has been used as the solitary means to determine the significant risks from contractor's eleven key project personnel who were directly involved in the tunnelling construction such as consultant, construction manager and tunnel engineers. The importance of the risks identified is then prioritised and ranked via the Analytic Hierarchy Process (AHP)'s pairwise comparison approach to determine their criticality towards a successful delivery of project. As a result, three key risks have been identified as significant for the tunnelling case study project, namely health and safety, cost overrun in construction and time overrun in construction. Two sub-risks each of the latter categories, which are cost underestimation and unforeseen events (cost overrun in construction) as well as plant and machinery failure and delay in material delivery (time overrun in construction), have occupied the top five overall risk ranking.

Quantifying Risk Factors on Cost Performance By Characterizing Capital Facility Projects

  • Jang, Myung-Hoon;Cha, Hee-Sung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.4 s.32
    • /
    • pp.177-183
    • /
    • 2006
  • Risk-based estimation has been successfully introduced into the construction industry. By incorporating historical data associated with probability analysis, risk-based estimate is an effective decision support aid in considering whether to launch a particular project. The industry challenges, however, especially related with management issues, such as labor shortage, wage growth, and supply chain complexity, have often resulted in poor cost performance. The insufficient assessing the project characteristics (i.e., resource availability, project complexity, and project delivery method) can be the main reasons in the poor cost performance. Because the accuracy level of cost performance prediction can be enhanced by extensive evaluation of the subject project characteristics, a new approach for predicting cost performance in an earlier stage of a project can improve the Industry substantiality, in other words, value maximization. The purpose of this paper is to develop a new methodology in developing a risk-based estimate tool by incorporating extensive project characteristics. To do this, an extensive industry survey was conducted from both private and public sectors in building industry in Korea. In addition, significant project characteristics were identified in terms of cost performance indicator. Although the data collection is limited to Korean industry the suggested approach provides the industry with a straightforward methodology in risk management. As many researchers maintained that front-end planning efforts are crucial in achieving the successful outcome in building projects, the new method for risk-based estimation can Improve the cost performance as well as enhance the fulfillment in terms of business sustainability.

Finding Significant Factors to Affect Cost Contingency on Construction Projects Using ANOVA Statistical Method -Focused on Transportation Construction Projects in the US-

  • Lhee, Sang Choon
    • Architectural research
    • /
    • v.16 no.2
    • /
    • pp.75-80
    • /
    • 2014
  • Risks, uncertainties, and associated cost overruns are critical problems for construction projects. Cost contingency is an important funding source for these unforeseen events and is included in the base estimate to help perform financially successful projects. In order to predict more accurate contingency, many empirical models using regression analysis and artificial neural network method have been proposed and showed its viability to minimize prediction errors. However, categorical factors on contingency cannot have been treated and thus considered in these empirical models since those models are able to treat only numerical factors. This paper identified potential factors on contingency in transportation construction projects and evaluated categorical factors using the one-way ANOVA statistical method. Among factors including project work type, delivery method type, contract agreement type, bid award type, letting type, and geographical location, two factors of project work type and contract agreement type were found to be statistically important on allocating cost contingency.

An Analysis on the Perception of Domestic Construction Engineer to Introduce IPD (IPD 도입을 위한 국내 건설기술자의 인식 분석)

  • Song, Sul-Min;Kim, Yea-Sang;Chin, Sang-Yoon;Kwon, Soon-Wook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.2
    • /
    • pp.72-80
    • /
    • 2011
  • Recently, significance of efficiency in construction projects have been increased. So effective new delivery systems are required to improve project quality and value. Those systems could also reduce period, cost, risk and waste of the construction. Also, as current government aims 'Low carbon and Green growth', it is important to manage integrated supervision from the pre-design stage to the operation stage. In USA, AIA suggested IPD which encourages mutual cooperation among stakehklder to improve the productivity. Therefore, this study analyzes the characteristics of the IPD and deduct Present condition and Perception of Domestic Construction Environment to Introduce IPD.

Integrated Project Delivery in the Pre-construction Phase : Case Study of IPD for Lean Construction (사례 연구를 통한 Pre-con 단계의 린 건설 기반 IPD 프로젝트 적용 방안 도출)

  • Jang, Hanbyeol;Lee, Joosung;Ahn, Yonghan
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.6
    • /
    • pp.11-22
    • /
    • 2019
  • Current construction project processes pose difficulties for construction management as inefficient communication between project participants seldom accurately reflects the needs of the owner. To solve this problem, lean construction-based Integrated Project Delivery (IPD), which facilitates cooperation and builds trust through the formation of horizontal relationships among participants, is becoming increasingly popular. However, although lean construction-based IPD improves productivity in the construction industry, few studies have focused specifically on developing effective methods that maximize the benefits gained from lean construction-based IPD. This study therefore analyzed success factors for lean construction-based IPD projects by analyzing prior studies to identify factors that support IPD success. Application methods were analyzed and an example of how they are actually used in the field was examined through an in-depth single case analysis. The findings of this research can be applied to support lean construction-based IPD projects in Korea, improving their efficiency and boosting owner satisfaction.

Basic Study on the Assembly Process Design of Curtain-wall System for Minimization of Carbon Emission

  • Yi, June-Seong
    • Journal of the Korea Institute of Building Construction
    • /
    • v.12 no.6
    • /
    • pp.648-663
    • /
    • 2012
  • With recent attempts to improve quality and productivity, the prefabrication manufacturing system has been occupying an increasing share of the construction area. To minimize site work, material is more frequently being produced and partially assembled at a plant, and then installed at a site. For this reason, the production process is being divided and the materials are being delivered to the site after passing through multiple plants. With these changes in the production process, the materials delivery plan is becoming an important management point. In particular, as road transportation using trucks has a 71 percent share of the domestic transportation market, selecting the proper transportation path is important when delivering materials and equipment to a site. But the management system at the project design phase to calculate the delivery cost by considering the production process of the pre-fab material and the $CO_2$ emission at the material delivery phase is currently lacking. This study suggests a process design model for assembly production of the pre-fab material and transportation logistics based on carbon emission. The suggested model can be helpful to optimize the location of the intermediate plant. It is expected to be utilized as a basic model at the project plan and design phase when subcontractors make decisions on items such as materials procurement, selecting the production method, and choosing the location of the assembly plant.