1 |
British Standard Institution (BSI), "The International Organization for Standardization, BS ISO 31000: Risk Management-Principles and Guidelines", BSI, London, UK, 2009.
|
2 |
W.H. Ting, T.A Ooi, B.K Tan, "Tunnelling Activities in Malaysia: 1995-2005", Proceedings of International Conference on Tunnelling and Trenchless Technology, Kuala Lumpur, Malaysia, 2006.
|
3 |
F. Amberg, M. Bettelini, N. Seifert, "Design and Full scale testing for safety of Tunnels and Underground Structures", Proceedings of International Conference on Tunnelling and Trenchless Technology, Kuala Lumpur, Malaysia, 2011.
|
4 |
H.K.J Adnan, K.S Mohd, "The Malaysian Construction Industry‟s Risk Management in Design and Build", Journal of Applied Science, vol. 2, no. 5, pp. 27-33, 2008.
|
5 |
C. Boothroyd, J. Emmett, "Risk Management: A Practical Guide for Construction Professionals", Witherby & Co Ltd., London, UK, 1996.
|
6 |
Z. He, "Risk management for overseas construction projects", International Journal of Project Management, vol. 13, no. 4, pp. 231-237, 1995.
DOI
ScienceOn
|
7 |
N.J Smith, "Managing Risk in Construction Projects", Blackwell Science Ltd., 1999.
|
8 |
M.Y Norazian, H. Adnan, F.O Ahmad, "Clients‟ Perspectives of Risk Management Practice in Malaysian Construction Industry", Journal of Politics and Law, vol. 1, no. 3. pp. 121-130, 2008.
|
9 |
H. Adnan, M.N. Rahmat, F.N.M Nur, "Risk Management Assessment for Partnering Projects in the Malaysian Construction Industry", Journal of Politics and Law, vol. 1, no.1, pp. 76-81, 2008.
|
10 |
D.K Chimwaso, "An evaluation of cost performance of public projects: Case of Botswana", Proceedings of the 2nd International Conference of the CIB, 2000. (Retrieved in June 2011: http: //buildnet.csir.co.za/cdcproc/docs/2nd /chimwaso_dk.pdf)
|
11 |
H.P. Wannick, "A Code of Practice for Risk Management of Tunnel Works: Future Tunnelling Insurance from the Insurers‟ Point of View", Proceedings of International Tunnelling and underground space Association (ITA) Conference, Seoul, Republic of Korea, 2006.
|
12 |
A. Akintoye, E. Fitzgerald, C. Hardcastle, "Risk Management for Local Authorities‟ Private Finance Initiative Projects", RICS, Proceedings of COBRA Conference 1999, vol. 2, pp.81-91, 1999.
|
13 |
P. Reina, W.J Angelo, "Megaprojects need more study up front to avoid cost overruns", McGraw Hill Construction, 2002. (Retrieved in May 2012: http: //flyvbjerg.plan.aau.dk/News%20in%20English/ENR%20Costlies%20150702.pdf)
|
14 |
B. Flyvbjerg, M.S Holm, S. Buhl, "Underestimating costs in public works projects: Error or Lie?", Journal of the American Planning Association, APA, vol. 68, no. 3, pp. 279-295, 2002.
DOI
ScienceOn
|
15 |
F. Nega, "Causes and effects of cost overrun on public building construction projects in Ethiopia", PhD Thesis, Addis Ababa University, Ethiopia
|
16 |
M.I Al-Khalil, M.A Al-Ghafly, "Delay in public utility projects in Saudi Arabia", International Journal of Project Management, vol.17, no. 2, pp. 101-106, 1999.
DOI
ScienceOn
|
17 |
H. Liu, "The Analysis of Project Risk Management Based on AHP", Proceedings of 2nd IEEE International Conference on Information and Financial Engineering, pp. 576-579, 2010. (Retrieved in February 2011: http: //ieeexplore.ieee.org/xpls/abs_all.jsp?arnumber=5609426&tag=1)
|
18 |
D.W Bordoli, A.N Baldwi, "A methodology for assessing construction projects delays", Journal of Construction Management and Economics, vol. 16, no. 3, pp. 327-337, 1998.
DOI
|
19 |
P.F Kaming, P.O Olomolaiye, G.D Holt, F.C Harris, "Factors influencing construction time and cost overruns on high-rise projects in Indonesia", Journal of Construction Management and Economics, vol. 15, no. 1, pp. 83-94, 1997.
DOI
|