1 |
Sall, J., Creighton, L., and Lehman, A. (2005). JMP start statistics, Third edition. Toronto, Canada: SAS Institute/Thomson.
|
2 |
Molenaar, K. R. (2005). "Programmatic cost risk analysis for highway megaprojects." J. Constr. Eng. Manage., 131(3), 343-353.
DOI
ScienceOn
|
3 |
Moselhi, O., Hegazy, T., and Fazio, P. (1993). "DBID: Analogy-based DSS for bidding in construction." J. Constr. Eng. Manage., 119(3), 466-479.
DOI
ScienceOn
|
4 |
Popescu, C. M., Phaobunjong, K., and Ovararin, N. (2003). Estimating building costs, Marcel Dekker, New York.
|
5 |
Smith, G. R. and Bohn, C. M. (1999). "Small to medium contractor contingency and assumption of risk." J. Constr. Eng. Manage., 125(2), 101-108.
DOI
ScienceOn
|
6 |
Thal, A. E., Cook, J. J., and White, E. D. (2010). " Estimation of cost contingency for Air Force construction projects." J. Constr. Eng. Manage., 136(11), 1181-1188.
DOI
ScienceOn
|
7 |
Thompson, P. A. and Perry, J. G. (1992). Engineering construction risks: A guide to project risk analysis and risk management, Thomas Telford, London. U.K.
|
8 |
Touran, A. (2003). "Calculation of contingency in construction projects." IEEE Trans. Eng. Manage., 50(2), 135-140.
DOI
ScienceOn
|
9 |
U.S. Department of Agriculture (USDA) Economic Research Services (2000), Rural Definitions: State-Level Map (Florida), Washington, DC.
|
10 |
Weistein, F. (2007). Wolfram math world, the web's most extensive mathematics resources
|
11 |
Flood, I and Issa, R. R. A (2010). "Empirical modeling methodologies for construction." J. Constr. Eng. Manage., 136(1), 36-48.
DOI
ScienceOn
|
12 |
Baccarini, D. (2004). "Accuracy in estimating project cost construction contingency: A statistical analysis." The Int. Constr. Research Conf. of the Royal Institution of Chartered Surveyors, Headingley Cricket Club, Leeds. Australia.
|
13 |
Chen. D. and Hartman, F. T. (2000). "A neural network approach to risk assessment and contingency allocation." AACE International Transactions, RISK.07.01-RISK.07.06.
|
14 |
Florida Department of Transportation (FDOT) (2007). Design-Build guidelines, Tallahassee, FL.
|
15 |
Flyvberg, B., Holm, M. S., and Buhl, S. (2002). "Underestimating costs in public works projects: Error or lie?" J. Amer. Plan. Assoc., 68(3), 279-295.
DOI
ScienceOn
|
16 |
Lhee, S. C., Issa, R. R., and Flood, I. (2009). "Predicting owner's contingency for transportation construction projects using intelligent computing techniques." Proc., ASCE Int. Workshop on Comput. in Civ. Eng., Austin, TX, 442-451.
|
17 |
Gunhan, S. and Arditi, D. (2007). "Budgeting owner's construction contingency." J. Constr. Eng. Manage., 133(7), 491-497.
|
18 |
Hale, D. R., Shrestha, P. P., Gibson, G. E., and Migliaccio, G. C. (2009). "Empirical comparison of design/build and design/bid/build project delivery methods." J. Constr. Eng. Manage., 135(7), 579-587.
DOI
ScienceOn
|
19 |
Hollmann, J. K. (2007). "The monte-carlo challenge: A better approach." AACE International Transactions, RISK.03.01-RISK.03.07.
|
20 |
Lhee, S. C. (2009). "Artificial neural network model to predict financial contingency for transportation construction projects" Ph.D. dissertation, University of Florida.
|
21 |
Lhee, S. C., Issa, R. R., and Flood, I. (2012). "Predicting of financial contingency for asphalt resurfacing projects using artificial neural networks." J. Constr. Eng. Manage., 138(1), 22-30.
DOI
ScienceOn
|
22 |
Mak, S. and Picken, D. (2000). "Using risk analysis to determine construction project contingencies." J. Constr. Eng. Manage., 126(2), 130-136.
DOI
ScienceOn
|
23 |
American Association of Cost Engineers (AACE)'s Risk Management Committee (2000). "AACE International's risk management dictionary." Cost Eng., 42(4), 28-31.
|
24 |
Federal Highway Administration (FHWA) (2007). Major project program cost estimating guidance, Washington, DC
|