• Title/Summary/Keyword: Progress measurement

Search Result 712, Processing Time 0.02 seconds

Construction Progress Measurement System by tracking the Work-done Performance (내역물량 측정에 의한 건설공사진도율 산정시스템)

  • Choi Yoon-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.3 s.15
    • /
    • pp.137-145
    • /
    • 2003
  • The project control system based on the actual values of three objects shall be operated continuously in a timely manner. For collecting/tracking accurate actual performance data, a reasonable basis of measuring work performance and its related measuring methods are needed. Therefore, this research proposes a method of developing and operating the construction progress measurement system. The problem of the conventional method is the difficulty to construct control accounts and to define the basis of measuring the performance of each control account. Therefore, this research proposes the preferable, formal methodology that produces the progress value of the smallest work unit by surveying the installed quantities and estimates percent complete of groups of works or entire project by earned value concept. This research in connection with the hereafter research of the weight value of control accounts will contribute to apply in practice and to develop the scientific construction management technique in the construction industry. Further researches how to trend and forecast the project using the measured progress value are recommended for putting the prosed system of this research to practical use.

A Study on Simplified Payment Method by Progress Measurement for Specified Activity - Focusing on Construction of Eco-River (대표공종의 선정을 통한 약식 기성 산정 방법에 관한 연구 - 자연형 하천공사를 중심으로)

  • Lee, Jeong-Yoon;Woo, Sung-Kwon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.1
    • /
    • pp.160-169
    • /
    • 2010
  • In domestic public works, there are several problems in the measurement of payments based on the bill of quantity, which doesn't match with the activity progress rate, heavy paper works and complicated procedures. It can be classified formal and simplified method. By using the simplified method, it can be solved many problems by summarizing the procedure, but is not generally used. This paper proposes a payment method by progress measurement for specified activity based on WBS(Work Breakdown Structure) verifying efficiency which reduced cost account and advanced work on payment compare to method of domestic public works using the data about construction of eco-river. This method will be an important contribution on being a base for cost-schedule integrated management which were verified and also improving efficiency on measuring payment.

A Method to Build Daily Progress Management Model based on BIM Estimate Data in Construction Phase (BIM 기반의 시공단계 견적데이터를 활용한 일일 진도관리모델 구축 방안)

  • Jung, Jun-Ho;Chin, Sang-Yoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.5
    • /
    • pp.23-34
    • /
    • 2011
  • Reliable progress management at construction requires integrated information of cost and schedule, and information is used as a basis for project performance measurement. However, separate handling of cost and schedule information at construction projects makes objective measurement more difficult and decreases management productivity due to additional works for breaking down bill of quantities into corresponding activities. Recently, research related to BIM addresses issues on effective progress management based on BIM with incorporation of daily progress management. Therefore, the objective of this paper is to propose information model for daily progress rate and budgeted cost of work performed by utilizing BTM-based quantity and location information.

Methods of Establishing the Optimal Performance Measurement Baseline and Evaluating the Progress for Implementing EVMS (EVMS 적용을 위한 최적 성과측정기준선 설정 및 진도율 산정 방법)

  • Won Dong-Soo;Kim WooYoung;Lee Hyun-Soo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.395-400
    • /
    • 2001
  • In construction projects, it is very important to evaluate the performance of works in comparison with the cost and schedule plans. So, on the first of July, 2000, the Ministry of Construction and Transportation announced the EVMS will be applied in public sector soon. However there are still many arguments about how to establish the Performance Measurement Baseline(PMB) and how to evaluate the progress with accuracy. And many people confuse the meaning of EVMS with that of cost and schedule management. So, the purpose of this research is to propose the new useful methods to set up the PMB and to assess the exact progress in consideration of cost, schedule, and float time for successful implementation of EVMS.

  • PDF

A Study on Measurement of SERVQUAL and SERVPERF Measurement - A Sightsee- ing quality of Service to the centers - (SERVQUAL 측정과 SERVPERF 측정 이론 연구 -관광 서비스 품질을 중심으로-)

  • Kim, Chul-Jung
    • The Journal of Information Technology
    • /
    • v.9 no.3
    • /
    • pp.33-47
    • /
    • 2006
  • We will can do quality of measurement of service that thing is quite abstract concept. Generally, we speak Service of quality that property of a product, usability of use, social quality requirement to a quality of service by wide meaning. A purpose of this study was comparison regarding a way to measure of service quality, and in the insufficient section there was anything, and progress of model study of service left no matter how much focus to it. There is comparative study a few progress of literature of a PZB, SERVQUAL, SERVPERF, model. Desarbo, Huff, Rolandelli, & Choi, (1994: 125-131) proposed that to solve the above model contradiction point, and Presentation called a plan based on to Conjoint analysis. There is Critical point to decide on priority order of proposed model of service measurement. This study has a lot of the pieces which are short by absence of empirical study, but will make a supplementation in next term study.

  • PDF

Improvement of Cost-Schedule integration based Progress Management through PMIS (비용-일정통합기반 진도관리 개선방안)

  • Yoon, You-Sang;Suh, Sang-Wook;Jang, Gyu-Seong;Choi, Jang-Shik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.5
    • /
    • pp.144-152
    • /
    • 2013
  • Recently construction projects become more bigger. So construction companies have being performed cost and schedule management task by using PMIS. In engineering and construction phase, progress management which occur the most frequent information I/O(input and output) should be managed effectively by PMIS. Although most information by PMIS manage efficiently, cost-schedule information for progress management is difficult to be managed due to recurrent information input. thus when changed by price fluctuation and change order, progress management could not connnect cost information with schedule information. So it caused inaccuracy of progress measurement and data increase in PMIS. To solve this problem, This study suggests improved module for progress management through integration of cost-schedule using quantity take-offs as progress measurement method.

The Characteristics of Frequency Spectrum of Radiated Electromagnetic Waves with AC Discharge Progress in Liquid Nitrogen (액체 질소중 교류방전 진전에 따른 방사전자파의 주파수 스펙트럼 특성)

  • 박광서;윤대희;이상훈;이현동;김충년;최병주;김기채;이광식
    • The Transactions of the Korean Institute of Electrical Engineers C
    • /
    • v.52 no.3
    • /
    • pp.123-129
    • /
    • 2003
  • In this paper, a relationship between AC discharge progress and the radiated electromagnetic waves was investigated by measuring electromagnetic waves using a biconical antenna and a spectrum analyzer. The frequency spectrum of the radiated electromagnetic waves were measured at the atmospheric pressure in liquid nitrogen($LN_2$) during partial discharges progressed by AC high voltage in nonuniform electric field. Front the results of this study, a new method was introduced for measurement and analysis of the radiated electromagnetic waves with discharge progress in $LN_2$ Besides. according to the consideration of the mutual relation between frequency spectrum of the radiated electromagnetic waves and discharge progress, it was confirmed that detecting partial discharge and estimating discharge progress could be possible. It is considered that these results obtained from this investigation may be used as fundamental data for diagnosis and prediction of electric insulations about superconducting and cryogenic power equipments.

Magnetocardiogram Measurement of Laboratory Rat (백서를 이용한 심자도 신호 측정)

  • Kim, I.S.;Ahn, San;Kwon, H.C.;Song, J.H.
    • Progress in Superconductivity
    • /
    • v.11 no.2
    • /
    • pp.147-151
    • /
    • 2010
  • We have developed a high-$T_c$ SQUID magnetocardiogram (MCG) system for small laboratory animals. White noise of the measurement system was about 30 fT/$Hz^{1/2}$ when measured in a magnetically shielded room. We optimized the measurement position to obtain clear MCG wave from rat's small heart by using grid measurements. With the optimization, the MCG signal was successfully detected with the peak amplitude of about 30 pT. We could observe well defined P-, QRS-, and T-waves from the rat MCG. The results suggest that the developed system has a strong potential to monitor the progress of the heart disease model by using a laboratory rat.

A Study on the Improvement of Construction Progress Measurement Based on Earned Value Concept (EV기반 RC 공사 진도율산정 개선방안)

  • Choi Tae-Young;Jung Hye-Won;Koo Kyo-Jin;Hyun Chang-Taek
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.307-310
    • /
    • 2003
  • Construction projects include risks due to uncertain factors, so it's important to repeatedly evaluate the performance of on-going work in all aspects of the projects. But construction projects are usually managed focusing on the results of projects. Moreover, cost and schedule are managed separately even though the efficiency of integrated management is very high. Recently many researches about cost and schedule integration methods are in progress according to the increasing of interest and EVMS (Earned Value Management System). Though researchers comment and propose many methods, it's hard to find example to apply it to the real project. So, the purpose of this study is to improve a method of construction Progress measurement Based on Earned value Concept by integration of cost and schedule management. It investigates the previous studies, interviews and performs a case study.

  • PDF

A Study on Technical Measures and their Application (기술척도 적용 연구)

  • Choi, Seok
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.3 no.2
    • /
    • pp.3-8
    • /
    • 2007
  • Technical Measures includes Measures of Effectiveness(MOEs), Key Performance Parameters(KPPs), Measures of Performance(MOPs) and/or Technical Performance Measures(TPMs). Technical measurement is the set of measurement activities used to provide supplier and/ or acquirer insight into progress in the definition and development of the technical solution, ongoing assessment of the associated risks and issues. This paper describes how technical measures can be applied, using the measurement process described in the previous study and shows the relationship between the various types of technical measures.

  • PDF