A Study on Simplified Payment Method by Progress Measurement for Specified Activity - Focusing on Construction of Eco-River  

Lee, Jeong-Yoon (인하대학교 대학원 토목공학과)
Woo, Sung-Kwon (인하대학교 토목공학과)
Publication Information
Korean Journal of Construction Engineering and Management / v.11, no.1, 2010 , pp. 160-169 More about this Journal
Abstract
In domestic public works, there are several problems in the measurement of payments based on the bill of quantity, which doesn't match with the activity progress rate, heavy paper works and complicated procedures. It can be classified formal and simplified method. By using the simplified method, it can be solved many problems by summarizing the procedure, but is not generally used. This paper proposes a payment method by progress measurement for specified activity based on WBS(Work Breakdown Structure) verifying efficiency which reduced cost account and advanced work on payment compare to method of domestic public works using the data about construction of eco-river. This method will be an important contribution on being a base for cost-schedule integrated management which were verified and also improving efficiency on measuring payment.
Keywords
Payment Measurement; Public Works; Simplified Measurement of Payment; Eco-River; Major Activity; Measurement of Progress Rate;
Citations & Related Records
연도 인용수 순위
  • Reference
1 국토해양부, 한국건설기술연구원 (2009), 2009 건설공사 표준품셈, 반월문화인쇄사, 경기도, pp.49-435.
2 국토해양부, 건설기술연구원 (2009), "건설공사 실적공사비 적용 공종 및 단가", 2009년 하반기
3 법제처 (2008), "국가를 당사자로 하는 계약에 관한 법률"
4 이성락 (2004), "국내 기성관리 실태조사에 의한 정부계약제도의 기성지급 개선방안 연구", 중앙대학교 석사학위논문, pp.42-44.
5 국토해양부 (2008), "책임감리 업무수행 지침서", 국토해양부 고시 제 2008-872호
6 이영환, 최석인 (2009), "공공건설 현장 기성 처리 방법 및 절차의 개선방안"건설이슈포커스, 2009.6.1, 건설산업연구원, pp.7-16.
7 한국건설기술연구원 (2009), "건설공사비지수 동향", 2009. 10
8 이복남 (1997), "건설공사 진도 및 기성고 산정 방법 개선", 건설산업연구원, pp.15-30.