• Title/Summary/Keyword: PERT method

Search Result 44, Processing Time 0.03 seconds

An Investigation of Project Completion Time Estimation Method in PERT Network for Planning and Management in Large-Scale Systems (대규모 시스템의 모사와 관리를 위한 PERT네트워크 완료일자 추정기법에 관한 고찰)

  • Lee, Jae-Myung;Yi, Ho-Jae;Park, Mee-Jeong;Lee, Jeong-Jae
    • Proceedings of the Korean Society of Agricultural Engineers Conference
    • /
    • 2005.10a
    • /
    • pp.695-699
    • /
    • 2005
  • Propriety of PERT network for planning and management in large-scale systems was investigated. We also review the example of small and middle size system to compare the appropriateness of PERT analysis method. For comparing the appropriateness of PERT analysis method the calculation time, and the variances were estimated. Eventualy, we proposed the criteria of PERT analysis method for planning and management large-scale systems.

  • PDF

Sensitivity Analysis of Expected Project Completion Time in a PERT Network with Discrete Distributions (이산형 활동시간 분포를 갖는 PERT 네트워크에서 평균사업완성시간과의 민감도 분석)

  • Cho, Jae-Gyeun;Park, Chul-Jae
    • Journal of Korea Society of Industrial Information Systems
    • /
    • v.12 no.1
    • /
    • pp.108-117
    • /
    • 2007
  • For a PERT network the sensitivity analyses are valuable tools for effective management and control of a project. In a previous article, a method was developed for the sensitivity analysis of the expected project completion time (${\mu}_{T}$) with respect to the expected duration of an activity (${\mu}_{i}$) under the assumption that the durations of activities are independent and normally distributed. In the present article, a method is presented for the sensitivity analysis of ${\mu}_{T}$ with respect to ${\mu}_{i}$ when the durations of activities are independent and follow discrete distributions, which utilizes the previous sensitivity analysis method with modifications. The accuracy of the proposed method is assessed using various example PERT networks, and the computational results indicate that the accuracy is comparable to that of direct Monte Carlo simulation.

  • PDF

Probabilistic Project Duration Estimation by Combination of PERT and PLET in High-Risk Project (고위험 사업에서 PERT와 PLET기법 결합에 의한 확률적 사업공기 추정)

  • Kim, Seon-Gyoo;Kim, Junyoung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.3
    • /
    • pp.71-80
    • /
    • 2016
  • PERT(Project Evaluation and Review Technique) is typical method in order to probabilistically establish the schedule plan for large scale complex project or mega project. PERT technique is impossible to estimate relationship of each activity probabilistically when there are overlapping relationships because it is limited to Finish-to-Start(FS) relationship. In order to overcome this kind of limitation of PERT technique, PLET(Probabilistic Linkage Evaluation Technique) has been suggested to probabilistically estimate project duration for various overlapping relationships for each activity. However, estimating project duration by PLET technique only considers uncertainty of relationship between activities and not activity time, thus it is not the perfect duration estimating method. The main objective of this research is to propose the integration model of PERT and PLET and verify its probabilistic validity. By verifying application of time calculation method of integration model in practical case, this research will suggest probabilistic project duration estimating method in schedule plan of high-risk construction industry.

Probability-based Critical Path Estimation for PERT Networks of Repetitive Activities (반복작업 PERT 네트워크의 확률기반 주공정 산정기법)

  • Yi, Kyoo-Jin
    • Journal of the Korea Institute of Building Construction
    • /
    • v.18 no.6
    • /
    • pp.595-602
    • /
    • 2018
  • Network-based scheduling methods can be classified into CPM method and PERT method. In the network scheduling chart, critical path can be estimated by performing the forward calculation and the backward calculation though the paths in the network chart. In PERT method, however, it is unreasonable to simply estimate the critical path by adding the sum of the activity durations in a specific path, since it does not incorporate probabilistic concept of PERT. The critical path of a PERT network can change according to the target period and deviation, and in some cases, the expected time of the critical path may not be the path with longest expected time. Based on this concept, this study proposes a technique to derive the most-likely critical path by comparing the sum of estimated time with the target time. It also proposes a method of systematically deriving all alternate paths for a network of repetitive activities. Case studies demonstrated that the most-likely critical path is not a fixed path and may vary according to the target period and standard deviation. It is expected that the proposed method of project duration forecasting will be useful in construction environment with varying target date situations.

신관리기법으로서의 PERT.CPM

  • 이승영
    • Cement
    • /
    • s.37
    • /
    • pp.4-11
    • /
    • 1970
  • 최근 급속히 팽창된 산업 구조와 이에 따른 업무량의 증가는 종래의 관리기술로서는 이를 성공적으로 처리할 수 없게 되었으며 아울러 인간의 미래조작능력의 증대와 기업구상력의 개발, 사회변동에 대비한 예측적인 계획의 수립 등 관리기능의 신장은 새로운 관리기법을 요구하게 되었으므로 PERT/CPM 수법이 신관리기법의 하나로 등장하게 되었다. PERT/CPM 이란 Program Evaluation Review and Technique, Critical Path Method 의 약자로서 우리말로는 계획수립 집행 및 평가로 번역되는데 이의 직역은 종속 및 총합 $\ulcorner$시스템$\lrcorner$ 과업의 동시진행 및 집중관리라 할 수 있는 것으로 시간과 비용을 절감하려는 기법인 것이다. 또한 PERT 기법은 복잡한 작업형태를 상호관련성있는 Network로 구성하고 제종속작업을 하나의 통일된 목표로 진행시키는 것을 의미한다. 이와 같은 PERT/CPM 기법은 제한된 자원의 효율적인 투자 및 관리와 불필요한 시간과 비용을 제거하여 준다. 현재 정부(경제기획원)는 PERT/CPM 제도를 도입하여 건설공사에 대한 예산관리제도를 설정중에 있으며 민간 및 정부투자기관으로서 현대건설주식회사와 한국전력주식회사와 이미 PERT/CPM 제도화방책을 연구기관에 위촉하여 제2단계적용을 시도하고 있는 것은 시대적 당위성에 따른 타당한 전망이라 하겠다. 거금 한국양회공업협회가 본제도의 도입 적용을 추진하기 위한 일련의 조사활동을 시작한 것은 시멘트 공업계의 새로운 경영관리체제를 모색하고 업계를 선도하는 중요한 전환점이 되리라 믿는다.

  • PDF

Application of PERT/CPM in dental practice (PERT/CPM의 치과임상에의 적용)

  • Kim, Bo-Kuk;Kim, Jae-Hyun;Dong, Jin-Keun
    • The Journal of Korean Academy of Prosthodontics
    • /
    • v.52 no.3
    • /
    • pp.186-194
    • /
    • 2014
  • Purpose: Process management is the activity which manages all procedure of construction by representing visually interrelation of operation or sequence setting. The purpose of this study was for reducing treatment period and higher efficiency of treatment through application of PERT/CPM (Program Evaluation & Review Technique/Critical Path Method) in dental clinic. Materials and methods: The patients were selected for study who needed more than 2 departments' cooperation for prosthodontic treatment in Wonkwang Dental University Hospital. Control group is composed of the patient's whole treatment plan, treatment period, numbers of hospital visit, treatment costs, treatment results. On the other hand, experiment group contains the patient's virtual treatment data based on PERT/CPM technique. We applied PERT/CPM in operation analysis. Results: Treatment period, numbers of hospital visit was decreased as 18.1% and 15.3% when we applied operation analysis based on charts. Also treatment cost in experiment group was 0.9% economized compared with control group's treatment cost. Conclusion: Application of PERT/CPM in dental clinic can achieve reliable treatment and reduced treatment period and establish plan of minimum treatment cost.

Theoretical Basis of PERT Formula and a New Estimation Method (PERT 공식의 이론적 근거와 새로운 추정방법)

  • Kim, Se-Hun;Won, Y.K.;Chae, Kyung-C.
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.15 no.2
    • /
    • pp.103-108
    • /
    • 1989
  • PERT formulae for the mean and variance of activity time are near exact only over a short interval of the concentration parameter which is defined as the sum of the two shape parameters of the beta distribution. Aiming a better estimation of the mean and variance of activity time, we propose a method of subjectively estimating this concentration parameter via estimating the probability of completing the activity within a specified time interval.

  • PDF

Application of a PERT-Type System on Work Management in Home-Delivered Meals Service Program for Elderly (가정배달 노인급식서비스 작업공정관리 모형개발을 위한 PERT-Type System의 적용)

  • 양일선;채인숙;유일근
    • Journal of Nutrition and Health
    • /
    • v.34 no.6
    • /
    • pp.701-714
    • /
    • 2001
  • The purpose of this study was to apply a PERT-type system, a combination of the project evaluation and review technique(PERT) and critical path method(CPM) on the employees' work time management of flood preparation, assembly, transportation and cleaning in home-delivered meals program for elderly The resources allotment heuristic program was developed by considering the number of employees and cooking utilities, being limited resources of home- delivered meals program. This program could assign the employees to perform the works included in flood preparation, assembly, transportation ind cleaning. Critical path and activities ware identified by PERT-type system on the basic of work time investigation in five senior centers. Work sheets were invented to perform the work by the shortest path with flexible employees'maximum flow As a result of the work time investigation, the most prevalent activities were ones of preparation in center C and E. Besides, the preparation(over fifty percent) was the most proportion among flood preparation, assembly, transportation and cleaning in center C and E. Critical path and activities of 'C'center were cucumber in sauce preparation path and assembly, wrapping in assembly path and case delivery in transportation path. Critical path and activities of 'E'center were Pan-fried Potato Preparation Path and assembly, case covering, wrapping in assembly Path. The work sheet invented by the heuristic program and PERT-type system reduced the work completion time and man hours in both centers.

  • PDF

Control Variates for Percentile Estimation of Project Completion Time in PERT Network (통제변수를 이용한 PERT 네트워크에서 프로젝트 완료확률의 추정)

  • 권치명
    • Journal of the Korea Society for Simulation
    • /
    • v.9 no.4
    • /
    • pp.67-75
    • /
    • 2000
  • Often system analysts are interested in the estimation of percentile for system performance. For instance, in PERT network system, the percentile that the project. Typically the control variate method is used to reduce the variability of mean response using the correlation between the response and the control variates with a little additional cost during the course of simulation. In the same spirit, we apply this method to estimate the percentile of project completion time in PERT system, and evaluate the efficiency of the controlled estimator for its percentile.1 Simulation results indicate that the controlled estimators are more effective in reducing the variances of estimators than the simple estimators, however those tend to a little underestimate the percentiles for some critical values. We need more simulation experiments to examine such a kind of bias problem. We expect this research presents a step forward in the area of variance reduction techniques of stochastic simulation.

  • PDF

A Study on Schedule Management in Construction Projects by CCPM (CCPM을 이용한 건설사업 일정관리에 관한 연구)

  • Park Young-Min;Kim Soo-Yong;Kim Ki-Young
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.5 s.21
    • /
    • pp.84-92
    • /
    • 2004
  • Construction work varies with the project types. However, the success of all project types depends upon three conditions i.e. schedule, quality and cost. If these three conditions are fulfilled, then project said to be successful. In this paper, scheduling of a construction Project has been dealt with the application of CCPM method. CCPM has been introduced as a new theory in construction industry in 1997 at the United States, but its application is still insufficient in domestic field due to the absence of systematic study, A simulation has been conducted in a Bridge construction project to validate the possibility of CCPM in order to complement PERT/CPM in construction field. The result of study shows that the CCPM could be effective to reduce the project time duration than existing PERT/CPM technique.