• Title/Summary/Keyword: PC부재

Search Result 119, Processing Time 0.024 seconds

Importance and Performance Analysis on Factors of PC Component Allocation and Loading Planning (IPA를 통한 PC부재 할당 및 적재 계획 시 고려사항 분석)

  • Jang, JunYoung;Cho, Kyeong Woon;Koo, Choongwan;Lee, Chansik;Kim, Taewan
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.2
    • /
    • pp.53-62
    • /
    • 2021
  • PC component allocation and loading plan can contribute to reductions in carbon dioxide emission and energy use of vehicles and total project costs with increased utilization of vehicle loading space. The study derived 18 considerations that PC construction plant managers and site managers take into account when they plan allocation and loading of PC components. Then, IPA (Importance and Performance Analysis) was performed to assess importance and performance of the 18 considerations. Results show that in the PC component allocation planning, considerations regarding the number of vehicles and existence of yard for storing PC components have not been taken into account well by the managers. In the PC component loading planning, PC component loading direction has not been reflected well by the managers although it is considered important by them. Recently, ill-planning issues of PC component transportation, such as inefficient use of vehicle space and loading with low stability, are frequent due to various types of PC components produced. In this context, if the results of this study are reflected in the development of component allocation and loading planning, vehicle management of PC projects would be more efficient, thereby leading to economic project management.

Suitability Analysis of Non-contact Sensing Methods for Precast Concrete Element Flatness Inspection (프리캐스트 콘크리트 부재의 평탄도 검사를 위한 센싱 기반 측정방법 적합도 비교)

  • Kwon, Soon-Ho;Kim, Jeong Seop;Sim, Sung-Han;Kim, Minkoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.24 no.4
    • /
    • pp.52-59
    • /
    • 2023
  • Flatness inspection of PC elements is normally conducted manually by inspectors at manufacturing sites. However, the manual inspection is error-prone and subjective, so it is necessary to develop a robust and efficient flatness measurement method. Recently, a few studies of laser scanner-based flatness inspection have been conducted. However, little attention on field applicability in terms of accuracy, time and cost has been paid. To tackle the limitation, this study aims to compare three sensing method including floor profiler, terrestrial laser scanner and total station for flatness inspection of PC elements. A series of experiments on two full-scale PC slabs were conducted and the results show that the laser scanning method is the most suitable for the PC elements flatness inspection in the aspects of accuracy, time and cost.

An Experimental Research on the Shear Friction Behavior of Beam-Column Joints of Partial Precast Concrete Structures (부분PC 보-기둥 접합부의 전단 마찰 거동에 관한 실험 연구)

  • Kim, Sang-Yeon
    • Land and Housing Review
    • /
    • v.5 no.2
    • /
    • pp.91-97
    • /
    • 2014
  • An experimental program was initiated to investigate the structural capacity of PC (Precast Concrete) beam-column joints used for the underground parking structure. Static testing of 4 typical PC beam-column joints specimens was conducted. Specimens were designed to span a range of parameters typically encountered for such members, based on findings from the survey of existing PC joint details used in the construction fields in Korea. The specimens were four by their joint types and testing parameters. The specific structural behavior germane to each specimen, and general observations on overall member behavior as a function of the considered parameters, are reported. From the results of tests on four PC joints specimens, the beam-column joints of PC structure used for the underground parking building was found to have similar structural capacities when comparing to the cast-in-place concrete system.

A Study on the Generating Piece and Arrangement Method Using the Parametric Macro (파라메트릭 매크로기법에 의한 부재생성 및 부재배치방법에 관한 연구)

  • 한창봉;박제웅
    • Journal of the Korean Society of Propulsion Engineers
    • /
    • v.3 no.1
    • /
    • pp.55-64
    • /
    • 1999
  • Large size shipyards have peformed the generating of piece and the nesting using shipbuilding-oriented CAD program, which requires higher skilled operators and lots of costs. So, medium and small size shipyards have pursued different types of piece generation and nesting (arrangement method). This research is to develop a program for the generating of pieces with parametric macro method and a STRIP program for the nesting of pieces by PC, which can be applied in such shipyards.

  • PDF

Reviews on the Application of Dry Coupler PC Member Joining Technology (건식커플러를 활용한 PC부재 접합기술의 적용현장에 대한 고찰)

  • Park, Je-Young;Moon, Hyung-Jae
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.233-234
    • /
    • 2023
  • This paper confirms the application sites of dry coupler technology, which is a direct connection method using screw threads, and Unlike wet couplers, this method can stand on its own without proof support and continuous work on the upper part. Furthermore, concludes with personal considerations to improve constructability.

  • PDF

A Study on the Development of Construction Production Rates System for Estimating Proper Construction Expenses of Off-Site Construction (OSC) Based PC Structure Factory-Built Assembly (OSC기반 PC구조 공장제작 적정 공사비 산정을 위한 품셈체계 개발 연구)

  • Lee, Jeongwook;Lee, Hansoo;Lee, Chiho;Noh, Hyunseok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.6
    • /
    • pp.89-100
    • /
    • 2022
  • The development of the Construction Production Rates System for appropriate construction cost calculation has recently come to the fore as a means of invigorating OSC based PC structure which currently needs institutional frameworks. PC structure based construction expenses consist of the factory-built assembly, transportation and on-site installation. Recently, in the field of transportation and site installation, research on product structure development is being conducted, such as presenting the standard product calculation system reflecting the results of field survey for each subsidiary materials (Lee et al., 2021). On the other hand, there is no ongoing research on estimating construction expenses of Factory-built assembly. This study suggests Construction Production Rates System which can be used for PC subsidiary materials based Factory-built assembly cost estimations. For the research, work types for the construction procedures have been categorized, and the standard input manpower suitable for the corresponding work characteristics has been derived from analyzing the associated Construction Standard Production Rates for each work type. Also, as the research referred PC subsidiary materials (such as columns, beams, walls, and slab, as well as on-site installation) and the standard number of workforce based on work types, one can calculate direct labor cost, using what the research shows. In addition, it suggests that the size of individual subsidiary materials be the extra cost factor, by using the characteristics that productivity changes depending on the size(m3) of subsidiary materials. It is expected that the research can contribute to objectively verifying factory-built assembly cost through of PC structure, which currently relies on estimates.

A study on the Composition of the Production Rates System to Prepare Standards for Calculating the Construction Cost of PC Structure Apartments Based on Off-Site Construction (OSC) (OSC 기반 PC구조 공동주택 공사비 산정기준 마련을 위한 품셈 체계 구성에 관한 연구)

  • Lee, Hansoo;Lee, Chiho;Lee, Jeongwook;Noh, Hyunseok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.6
    • /
    • pp.96-106
    • /
    • 2021
  • The PC structure based on the OSC (Off-Site Construction) is mentioned as a representative method of innovation in the construction industry that converts the existing construction environment from site-centered to factory production-transportation-site assembly. However, recent research on PC method has focused on improving the functions of subsidiary materials and improving the production system to increase productivity and institutional / policy R&D that can be universally applied to the life-cycle stage of ordering / design /construction is insufficient. In particular, the absence of standardized cost calculation standards makes it difficult to calculate and verify of objectified appropriate construction cost. So which is an obstacle to the activation of the PC method. In this study, the standards for construction costs of domestic and foreign PC method were surveyed and similar Construction Standard Production Rates were analyzed to confirm the product structure suitable for PC method. Subsequently, the construction procedures and input resources for each PC subsidiary materials were identified through on-site surveys to derive component for subsidiary materials, and the factors of change in the product according to the construction characteristics(height, weight of subsidiary material) were verified. As a result the standard product calculation system suitable for the site installation of the PC method for apartment was presented.

A Basic Study of Crane Trajectory Distance Calculation for Sustainable PC Members Erection of Large Logistic Building (대형물류센터 PC부재 양중을 위한 크레인 궤적거리 산정 기초 연구)

  • Lim, Jeeyoung;Oh, Jinhyuk;Kim, Sunkuk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.77-78
    • /
    • 2023
  • As large logistics buildings have high floor heights and long spans, these buildings are designed as PC structures, and large cranes are used to lift PC members. PC erection planning can generally cause errors depending on the field engineer's experience. To solve this problem, a basic analysis method is needed to establish a systematic PC member erection plan. Crane work can be minimized if the trajectory is easily and quickly calculated according to the location of the crane and applied to the site. Therefore, the objective of this study is a basic study of crane trajectory distance calculation for sustainable PC members erection of large logistic building. In this study, a crawler crane commonly used for lifting PC members is limited. The trajectory distance for the PC erection plan was automatically calculated using the algorithm.

  • PDF

Mathematical Algorithm for Members Erection Period of Beam-Column System PC Apartment Building (보-기둥구조 PC공동주택의 부재 조립기간에 대한 수학적 알고리즘)

  • Kim, Ki-Ho;Lee, Bum-Sik;Kim, Jin-Won;Lee, Dong-Gun;Kim, MIn-Jun;Sohn, Jeong-Rak
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.117-118
    • /
    • 2023
  • Estimating the construction period at the initial stage of the project and determining whether it is appropriate is very important for the developer's decision-making and the success of the construction company's business. Existing researchers have conducted various studies to calculate the appropriate construction period, but there is no study on the influencing factors and methodology for the construction period of beam-column PC apartment building frame construction. The purpose of this study is to calculate the PC member assembly time using the mathematical algorithm of PC member assembly. The results of this study can be used as basic data to calculate the construction date of the standard floor of PC construction.

  • PDF

Development of PC Double Wall for Staircase Construction (계단실 공사를 위한 PC Double Wall 공법 개발)

  • Suh, Jung-Il;Park, Hong-Gun;Hwang, Hyeon-Jong;Im, Ju-Hyuk;Kim, Yong-Nam
    • Journal of the Korea Institute of Building Construction
    • /
    • v.14 no.6
    • /
    • pp.571-581
    • /
    • 2014
  • In the present study, hollow precast concrete wall (PC Double Wall) for staircase construction was developed. Comparing the conventional walls, the PC Double Wall can be reduced the lift weight using hollow core and improves the integrity between the PC members. The cross-section and re-bar details of the PC Double Wall were developed considering precast concrete manufacturing, constructability, and the structural safety. Particularly, a form system was developed to manufacture thin and hollow core PC wall efficiently. A mock-up test for a staircase using the PC Double wall was performed to verify the constructability and integrity of the PC walls. The test result verified that joint deformation and cracking did not occur as showing good constructability.