Browse > Article
http://dx.doi.org/10.6106/KJCEM.2022.23.6.089

A Study on the Development of Construction Production Rates System for Estimating Proper Construction Expenses of Off-Site Construction (OSC) Based PC Structure Factory-Built Assembly  

Lee, Jeongwook (Standard Construction Cost Research Institute, Hyeonin PCM)
Lee, Hansoo (Standard Construction Cost Research Institute, Hyeonin PCM)
Lee, Chiho (Standard Construction Cost Research Institute, Hyeonin PCM)
Noh, Hyunseok (Standard Construction Cost Research Institute, Hyeonin PCM)
Publication Information
Korean Journal of Construction Engineering and Management / v.23, no.6, 2022 , pp. 89-100 More about this Journal
Abstract
The development of the Construction Production Rates System for appropriate construction cost calculation has recently come to the fore as a means of invigorating OSC based PC structure which currently needs institutional frameworks. PC structure based construction expenses consist of the factory-built assembly, transportation and on-site installation. Recently, in the field of transportation and site installation, research on product structure development is being conducted, such as presenting the standard product calculation system reflecting the results of field survey for each subsidiary materials (Lee et al., 2021). On the other hand, there is no ongoing research on estimating construction expenses of Factory-built assembly. This study suggests Construction Production Rates System which can be used for PC subsidiary materials based Factory-built assembly cost estimations. For the research, work types for the construction procedures have been categorized, and the standard input manpower suitable for the corresponding work characteristics has been derived from analyzing the associated Construction Standard Production Rates for each work type. Also, as the research referred PC subsidiary materials (such as columns, beams, walls, and slab, as well as on-site installation) and the standard number of workforce based on work types, one can calculate direct labor cost, using what the research shows. In addition, it suggests that the size of individual subsidiary materials be the extra cost factor, by using the characteristics that productivity changes depending on the size(m3) of subsidiary materials. It is expected that the research can contribute to objectively verifying factory-built assembly cost through of PC structure, which currently relies on estimates.
Keywords
OSC (Off Site Construction); Construction Standard Production Rates; Precast Concrete; Construction Expenses; Factory-built assembly;
Citations & Related Records
Times Cited By KSCI : 4  (Citation Analysis)
연도 인용수 순위
1 Lee, K.B., Kim, K.R., Shin, D.W., and Cha, H.S (2011). "A Proposal for Optimizing Unit Modular System Process to Improve Efficiency in Off-site Manufacture, Transportation and On-site Installation." Korean Journal of Construction Engineering and Management, KICEM, 12(6), pp. 14-21.   DOI
2 Shin, W.S., and Son, C.B (2014). "Analyzing of the Construction Standard Production Unit (CSPU) and Developing of the Simulation Model on PC Project." Journal of the Architectural Institute of Korea, AIK, 30(11), pp. 89-96.
3 Woo, Y.M., Song, J.K., Cho, K.M., Lee, H.J., Koo, K.J., Hong, T,H and Hyun, C.T (2007). "Key Influence Factors for Efficient Cost Management of Design Stages." Korean Journal of Construction Engineering and Management, KICEM, 8(2), pp. 176-184.
4 Lee, H.S., Lee, C.H., Lee, J.W., and Noh, H.S (2021). "A study on the Composition of the Production Rates System to Prepare Standards for Calculating the Construction Cost of PC Structure Apartments Based on Off-Site Construction (OSC)." Korean Journal of Construction Engineering and Management, KICEM, 22(6), pp. 96-106.   DOI
5 Lee, J.H., Pakr, M.S., Lee, H.S., Lee, K.P., and Hyun, H.S (2015). "Application of Activity-Based Costing(ABC) for Modular Building Construction Indirect Costs Calculation at the Manufacturing Stage." Korean Journal of Construction Engineering and Management, KICEM, 16(4), pp. 139-145.   DOI
6 Gordian (2021). "RS Means Construction Cost Database." Gordian, America, (AUG. 08, 2022).
7 Huh, Y.K., Kim, K.U., and Kim, K.W (2013). "Labor Productivity and Indirect Cost Rates of Steel Factory." Journal of the Architectural Institute of Korea, AIK, 29(6), pp.123-131.
8 Kwon, S.C., Kyung, K.S., Kim, K.J., and Park, H.Y (2007). "Evaluation of Economical Efficiency of Standard Quantity per Unit by Change of Resource Quantity per Unit." Journal of the Korean Society of Civil Engineers, KSCE, 27(4D), pp. 517-524.
9 Yun, W.G., Shin, E.Y., and Kang, T.K (2021). "Analysis of Factors for Improvement of Economic Feasibility of Construction Cost to Spread Application of OSC Construction Method for Apartment Housing." Korean Journal of Construction Engineering and Management, KICEM, 22(6), pp. 55-63.   DOI