Importance and Performance Analysis on Factors of PC Component Allocation and Loading Planning
![]() |
Jang, JunYoung
(Department of Architectural Engineering, Graduate School, Incheon National University)
Cho, Kyeong Woon (Department of Architectural Engineering, Graduate School, Incheon National University) Koo, Choongwan (Division of Architecture and Urban Design, Incheon National University) Lee, Chansik (Division of Architecture and Urban Design, Incheon National University) Kim, Taewan (Division of Architecture and Urban Design, Incheon National University) |
1 | Kim, Y.S., and Kim, J.Y. (2000). "A Study on the Application of Precast Concrete Panel Method for Steel Framed Residential Buildings." Architectural Institute of Korea, 20(1), pp. 513-514. |
2 | Kwahk, G.J., Sohn, J.R., Kim, K.R., Sohn, C.B., and Kim, J.J. (1998). "A Logistics Information Management System for the Prefabricated Precast Concrete Panels." Architectural institute of Korea, pp. 87-94. |
3 | Lee, Y. (2020). "A methodology to align the logistical requirements of prefabricated wall panels." Stanford University, 2020. |
4 | Lim, C.Y., and Kim, S.K. (2006). "An Analysis of Influence Factors on Insitu-production and Installation Schedule of Composite Precast Concrete Members." The Korea Institute of Building Construction, 13(1), pp. 176-177. |
5 | Lim, H., and Yu, J.H. (2018). "Analysis of Inhibiting Factors Using PC(Precast Concrete) Method." Proceedings of the 2018 KICEM Conference, Seoul, KOREA. |
6 | Liu, D., Li, X., Chen, J., and Jin, R. (2020). "Real-Time Optimization of Precast Concrete Component Transportation and Storage." Advances in Civil Engineering, 2020. |
7 | Martilla, J.A., and James, J.C. (1977). "Importance - Performance Analysis." Journal of Marketing, 41(1), pp. 77-79. DOI |
8 | Morabito, R., Morales, S.R., and Widmer, J.A. (2000). "Loading optimization of palletized products on trucks." Transportation Research Part E: Logistics and Transportation Review, 36(4), pp. 285-296. DOI |
9 | Ng, S.T., Shi, J., and Fang, Y. (2009). "Enhancing the logistics of construction materials through activity-based simulation approach. Engineering." Construction and Architectural Management, 22(1), pp. 91-107. DOI |
10 | Nunnally, J.C. (1978). Psychometric theory. 2ed., Mc-Graw Hill, NY. |
11 | Olsson, J., Larsson, T., and Quttineh, N.H. (2020). "Automating the planning of container loading for Atlas Copco: Coping with real-life stacking and stability constraints." European Journal of Operational Research, 280(3), pp. 1018-1034. DOI |
12 | Chang, C., Wu, F., and Liu, D. (2016). "Optimization Model of Load and Transportation for Prefabricated Construction Components." pp. 1145-1148. |
13 | Park, S.Y., Kim, K.T., Park, N.C., and Jung, I.S. (2012). "Study of Improved Transporting Methods on Unit Module." Journal of the Korea Institute of Building Construction, 12(2), pp. 243-244. DOI |
14 | Baek, C.H., Kwak, M.K., and Seol, W.J. (2016). "Requirements Elicitation of Modular Unit Transportation for Preventing Damage." Architectural Institute of Korea, pp. 1124-1125. |
15 | Boyd, N., Khalfan, M.M., and Maqsood, T. (2013). "Off-site construction of apartment buildings." Journal of Architectural Engineering, 19(1), pp. 51-57. DOI |
16 | Chang, C., Wu, F., and Liu, D. (2016). "Optimization model of load and transportation for prefabricated construction components." Environment and Sustainable Development, pp. 1145-1148. |
17 | Jo, G.D. (2006). "A Study on the Integrated Management and Revitalization of Prefabricated Building with Precast Concrete." pp. 1-137. |
18 | Choi, O.K., Park, M.S., Hyun, H.S., and Lee, H.S. (2016). "Transportation and Site Erection Effect Factors Analysis for Modular Construction Process Planning." Architectural institute of Korea, 36(1), pp. 369-370. |
19 | Dawood, N.N., and Richard H.N. (1990). "A Survey of Current Production Planning Practices in the Precast Concrete Industry." Construction Management and Economics, 8(4), pp. 365-83. DOI |
20 | Jang, J.Y. (2019). "Research Trends in Off-Site Construction Management: Review of Literature at the Operation Level." Korean Journal of Construction Engineering and Management, KICEM, 20(4), pp. 114-125. DOI |
21 | Kim, D.M., Lee, J.S., Kim, J.Y., and Kim, J.J. (2014). "Marketing Strategy and Influential Factors based on the Attributes of Unit Modular System Kim,." Korean Journal of Construction Engineering and Management, KICEM, 15(1), pp. 78-86. DOI |
22 | Said, H., and El-Rayes, K. (2014). "Automated multi-objective construction logistics optimization system. Automation in Construction," 43, pp. 110-122. DOI |
23 | Kim, M.J., Lee, D., Lim, H., Cho, H., and Kang, K.I. (2015). "Derivation of Factors for Improvement for Efficient Procurement and Lifting Management of Modular Construction." The Korea Institute of Building Construction, 15(1), pp. 211-212. |
24 | Kim, S,Y., Yoon, Y.H., Park, K.Y., and Lee, B.S. (2006). "A research for Practical Using Method of PC Structural System for the Underground Parking Garage in an Apartment Housing Site." LH. |
25 | Pheng, L.S., and Chuan, C.J. (2001). "Just-in-time management of precast concrete components. Journal of construction engineering and management." 127(6), pp. 494-501. DOI |
26 | Pheng, L.S., and Chuan, C.J. (2000). "Just-in-Time Management of Precast Concrete Components." Journal of Construction Engineering and Management, 127(6), 494-501. DOI |
27 | Polat, G. (2010). "Precast concrete systems in developing vs. industrialized countries." Journal of Civil Engineering and Management, 16(1), pp. 85-94. DOI |
28 | Shin, H.K., and Ahn, Y.H. (2016). "A Study on Module Transport Process for Modular Construction." Architectural institute of Korea, pp. 417-418. |
29 | Shin, N.R., Kim, Y.S., Han, S.W., and Yeom, D.J. (2016). "Development of a Decision Support System for Production Scheduling of Precast Concrete Members." Architectural Institute of Korea, 32(2), pp. 31-40. DOI |
30 | Xu, G., Zhong, R.Y., Yang, H., and Huang, G.Q. (2015). "Cloud asset-enabled prefabrication transportation service for public housing production in Hong Kong." In 2015 IEEE International Conference on Automation Science and Engineering, pp. 1497-1502. |
31 | Yi, W., Phipps, R., and Wang, H. (2020). "Sustainable Ship Loading Planning for Prefabricated Products in the Construction Industry." Sustainability, 12(21), pp. 1-12. DOI |
![]() |