Browse > Article
http://dx.doi.org/10.6106/KJCEM.2021.22.2.053

Importance and Performance Analysis on Factors of PC Component Allocation and Loading Planning  

Jang, JunYoung (Department of Architectural Engineering, Graduate School, Incheon National University)
Cho, Kyeong Woon (Department of Architectural Engineering, Graduate School, Incheon National University)
Koo, Choongwan (Division of Architecture and Urban Design, Incheon National University)
Lee, Chansik (Division of Architecture and Urban Design, Incheon National University)
Kim, Taewan (Division of Architecture and Urban Design, Incheon National University)
Publication Information
Korean Journal of Construction Engineering and Management / v.22, no.2, 2021 , pp. 53-62 More about this Journal
Abstract
PC component allocation and loading plan can contribute to reductions in carbon dioxide emission and energy use of vehicles and total project costs with increased utilization of vehicle loading space. The study derived 18 considerations that PC construction plant managers and site managers take into account when they plan allocation and loading of PC components. Then, IPA (Importance and Performance Analysis) was performed to assess importance and performance of the 18 considerations. Results show that in the PC component allocation planning, considerations regarding the number of vehicles and existence of yard for storing PC components have not been taken into account well by the managers. In the PC component loading planning, PC component loading direction has not been reflected well by the managers although it is considered important by them. Recently, ill-planning issues of PC component transportation, such as inefficient use of vehicle space and loading with low stability, are frequent due to various types of PC components produced. In this context, if the results of this study are reflected in the development of component allocation and loading planning, vehicle management of PC projects would be more efficient, thereby leading to economic project management.
Keywords
Precast Concrete; Logistic; IPA; PC Component Allocation Plan; PC Component Loading Plan;
Citations & Related Records
Times Cited By KSCI : 2  (Citation Analysis)
연도 인용수 순위
1 Kim, Y.S., and Kim, J.Y. (2000). "A Study on the Application of Precast Concrete Panel Method for Steel Framed Residential Buildings." Architectural Institute of Korea, 20(1), pp. 513-514.
2 Kwahk, G.J., Sohn, J.R., Kim, K.R., Sohn, C.B., and Kim, J.J. (1998). "A Logistics Information Management System for the Prefabricated Precast Concrete Panels." Architectural institute of Korea, pp. 87-94.
3 Lee, Y. (2020). "A methodology to align the logistical requirements of prefabricated wall panels." Stanford University, 2020.
4 Lim, C.Y., and Kim, S.K. (2006). "An Analysis of Influence Factors on Insitu-production and Installation Schedule of Composite Precast Concrete Members." The Korea Institute of Building Construction, 13(1), pp. 176-177.
5 Lim, H., and Yu, J.H. (2018). "Analysis of Inhibiting Factors Using PC(Precast Concrete) Method." Proceedings of the 2018 KICEM Conference, Seoul, KOREA.
6 Liu, D., Li, X., Chen, J., and Jin, R. (2020). "Real-Time Optimization of Precast Concrete Component Transportation and Storage." Advances in Civil Engineering, 2020.
7 Martilla, J.A., and James, J.C. (1977). "Importance - Performance Analysis." Journal of Marketing, 41(1), pp. 77-79.   DOI
8 Morabito, R., Morales, S.R., and Widmer, J.A. (2000). "Loading optimization of palletized products on trucks." Transportation Research Part E: Logistics and Transportation Review, 36(4), pp. 285-296.   DOI
9 Ng, S.T., Shi, J., and Fang, Y. (2009). "Enhancing the logistics of construction materials through activity-based simulation approach. Engineering." Construction and Architectural Management, 22(1), pp. 91-107.   DOI
10 Nunnally, J.C. (1978). Psychometric theory. 2ed., Mc-Graw Hill, NY.
11 Olsson, J., Larsson, T., and Quttineh, N.H. (2020). "Automating the planning of container loading for Atlas Copco: Coping with real-life stacking and stability constraints." European Journal of Operational Research, 280(3), pp. 1018-1034.   DOI
12 Chang, C., Wu, F., and Liu, D. (2016). "Optimization Model of Load and Transportation for Prefabricated Construction Components." pp. 1145-1148.
13 Park, S.Y., Kim, K.T., Park, N.C., and Jung, I.S. (2012). "Study of Improved Transporting Methods on Unit Module." Journal of the Korea Institute of Building Construction, 12(2), pp. 243-244.   DOI
14 Baek, C.H., Kwak, M.K., and Seol, W.J. (2016). "Requirements Elicitation of Modular Unit Transportation for Preventing Damage." Architectural Institute of Korea, pp. 1124-1125.
15 Boyd, N., Khalfan, M.M., and Maqsood, T. (2013). "Off-site construction of apartment buildings." Journal of Architectural Engineering, 19(1), pp. 51-57.   DOI
16 Chang, C., Wu, F., and Liu, D. (2016). "Optimization model of load and transportation for prefabricated construction components." Environment and Sustainable Development, pp. 1145-1148.
17 Jo, G.D. (2006). "A Study on the Integrated Management and Revitalization of Prefabricated Building with Precast Concrete." pp. 1-137.
18 Choi, O.K., Park, M.S., Hyun, H.S., and Lee, H.S. (2016). "Transportation and Site Erection Effect Factors Analysis for Modular Construction Process Planning." Architectural institute of Korea, 36(1), pp. 369-370.
19 Dawood, N.N., and Richard H.N. (1990). "A Survey of Current Production Planning Practices in the Precast Concrete Industry." Construction Management and Economics, 8(4), pp. 365-83.   DOI
20 Jang, J.Y. (2019). "Research Trends in Off-Site Construction Management: Review of Literature at the Operation Level." Korean Journal of Construction Engineering and Management, KICEM, 20(4), pp. 114-125.   DOI
21 Kim, D.M., Lee, J.S., Kim, J.Y., and Kim, J.J. (2014). "Marketing Strategy and Influential Factors based on the Attributes of Unit Modular System Kim,." Korean Journal of Construction Engineering and Management, KICEM, 15(1), pp. 78-86.   DOI
22 Said, H., and El-Rayes, K. (2014). "Automated multi-objective construction logistics optimization system. Automation in Construction," 43, pp. 110-122.   DOI
23 Kim, M.J., Lee, D., Lim, H., Cho, H., and Kang, K.I. (2015). "Derivation of Factors for Improvement for Efficient Procurement and Lifting Management of Modular Construction." The Korea Institute of Building Construction, 15(1), pp. 211-212.
24 Kim, S,Y., Yoon, Y.H., Park, K.Y., and Lee, B.S. (2006). "A research for Practical Using Method of PC Structural System for the Underground Parking Garage in an Apartment Housing Site." LH.
25 Pheng, L.S., and Chuan, C.J. (2001). "Just-in-time management of precast concrete components. Journal of construction engineering and management." 127(6), pp. 494-501.   DOI
26 Pheng, L.S., and Chuan, C.J. (2000). "Just-in-Time Management of Precast Concrete Components." Journal of Construction Engineering and Management, 127(6), 494-501.   DOI
27 Polat, G. (2010). "Precast concrete systems in developing vs. industrialized countries." Journal of Civil Engineering and Management, 16(1), pp. 85-94.   DOI
28 Shin, H.K., and Ahn, Y.H. (2016). "A Study on Module Transport Process for Modular Construction." Architectural institute of Korea, pp. 417-418.
29 Shin, N.R., Kim, Y.S., Han, S.W., and Yeom, D.J. (2016). "Development of a Decision Support System for Production Scheduling of Precast Concrete Members." Architectural Institute of Korea, 32(2), pp. 31-40.   DOI
30 Xu, G., Zhong, R.Y., Yang, H., and Huang, G.Q. (2015). "Cloud asset-enabled prefabrication transportation service for public housing production in Hong Kong." In 2015 IEEE International Conference on Automation Science and Engineering, pp. 1497-1502.
31 Yi, W., Phipps, R., and Wang, H. (2020). "Sustainable Ship Loading Planning for Prefabricated Products in the Construction Industry." Sustainability, 12(21), pp. 1-12.   DOI