• Title/Summary/Keyword: Overseas Projects

검색결과 328건 처리시간 0.021초

Analysis of the Legal Blind Sectors of the Large-Scale Offshore Wind Farms of Korea and Proposal to Improve Safety Management (대규모 해상풍력발전단지의 안전관리를 위한 법적 사각지대 분석 및 개선 제안)

  • Inchul Kim;Dong Nam
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • 제29권2호
    • /
    • pp.127-138
    • /
    • 2023
  • A variety of decarbonized energy sources are being developed globally to realize carbon neutrality (Net Zero) by 2050 as a measure to address the global climate crisis. As the Korean government has also established a Renewable Energy 3020 policy and promoted energy development plans using solar or wind power, large-scale offshore development projects not present before in coastal waters, such as offshore wind farms, are being promoted. From ships' point of view, offshore facilities present obstacles to safe navigation, and with the installation of marine facilities, ship collisions or contact accidents between ships and marine facilities may occur in the narrowed water areas. In addition, there are concerns about environmental pollution and human casualties caused by marine accidents. Accordingly, we review overseas and domestic offshore wind farm development plans, analyze whether institutional devices are in place to ensure the safe passage of ships in wind farm areas, and study the safe operation of large-scale offshore wind farms and safe passage of ships along the Korean coast by comparing overseas legislative cases with domestic laws and presenting a proposal to illuminate the legal blind sectors.

A Study on Benchmarking of DfMA Application Strategy for Optimum OSC Design - Focusing on considering overseas trends - (OSC 최적 설계를 위한 DfMA 적용 전략 벤치마킹 연구 - 국외 동향 고찰을 중심으로 -)

  • Jung, Seoyoung;Lee, Seulki;Yu, Jungho
    • Korean Journal of Construction Engineering and Management
    • /
    • 제25권4호
    • /
    • pp.3-14
    • /
    • 2024
  • Unlike conventional construction production methods, OSC (Off-Site Construction) have many restrictions depending on the production environment and technology, so it is important to develop a design plan considering these restrictions and select the optimal design alternative considering the overall efficiency of the building production process. Accordingly, the construction industry is paying attention to DfMA (Design for Manufacturing & Assembly) to derive the optimal design plan for the OSC project. Leading OSC countries such as Singapore and the United Kingdom have recognized the need to apply DfMA and presented DfMA guidelines and application strategies suitable for the characteristics of the OSC industry, and several researchers are conducting research to integrate DfMA into the construction industry. However, in the case of Korea, the need for industrial application and industrial application of DfMA is recognized, but there are no methods and tools necessary to implement the concept of DfMA in the design of actual construction projects. Therefore, this study aims to present the basic direction of strategy for applying DfMA and developing tools for the development of the domestic OSC industry by analyzing the development and application of DfMA in overseas construction. The results of this study can be used as basic data for the development of DfMA tools suitable for the domestic OSC industry and the establishment of policies related to DfMA in the future.

Framework and Core Competency of Integrated Design Management (IDM) (통합설계관리의 개념적 틀 및 역량강화 요소 - 건축과 플랜트를 중심으로 -)

  • Kim, Yesol;Jung, Youngsoo
    • Korean Journal of Construction Engineering and Management
    • /
    • 제15권1호
    • /
    • pp.122-133
    • /
    • 2014
  • Recent diversification of project delivery systems coupled with increasing mega-projects requires highly advanced construction management techniques. Among those techniques, procurement and design management are recognized as being the first priority for overseas construction projects. Nevertheless, previous research in design management has been limited to the quality management of the design documents at design stage. Therefore, it is necessary to explore the design management from a comprehensive perspective throughout the project life cycle. In this context, the purpose of this paper is to propose a conceptual framework for integrated design management (IDM). Several different concepts in relation to design management were investigated first in order to identify the major variables of the IDM framework. A comprehensive comparison of construction management methodologies was also analyzed in order to identify key factors of IDM. Finally, an IDM framework was proposed by combining those factors and relevant issues. Based on the proposed framework, a survey was conducted in order to validate the framework as well as to identity important areas for improving competitive capability of Korean construction companies.

The Comparative Study on Incentive System for Integrated Design of Low-Energy Buildings (저에너지건물 통합설계 인센티브 체계 비교 연구)

  • Lee, Byungyun
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • 제17권6호
    • /
    • pp.129-139
    • /
    • 2016
  • The purpose of this paper was to comparatively investigate the efficient building incentives in Korea and foreign countries and to seek strategies to enhance low energy building integrated design market infrastructure in Korea. The structure of incentive policies were composed of four main component: 1) types of financial aids and beneficiaries, 2) energy performance criteria and verification methods, 3) supports for low energy building integrated design, and 4) funding sources for incentive programs. Every overseas incentive program has adopted a design team incentive along with building owners incentive and the range of target buildings have been extended from new construction to remodeling projects. The main system of the program is the performance standard through which projects were investigated and the level of incentive are decided. Initially, the integrated performance has been investigated through simulation methods, but the construction performance evaluation and energy monitoring methods are emerging. In addition, the direct support and educational support for integrated design has been provided to enhance the foundation of relative markets. Financial funding is also a key component of the program and more aggressive funding strategies have been adopted.

A Study on the Carbon Market and Carbon Funds Development. (탄소시장과 탄소펀드 개발에 관한 연구)

  • Son, Woo-Sik;Park, Myong-Sop
    • THE INTERNATIONAL COMMERCE & LAW REVIEW
    • /
    • 제46권
    • /
    • pp.265-313
    • /
    • 2010
  • Kyoto Protocol is an international convention on concrete performance program for UNFCCC(United Nations Framework Convention on Climate Change), which regulate and prevent to global warming and officially came into effect on February 16, 2005. Kyoto flexible mechanisms, the agreed environmental system in March 1997 in the Third Conference of Parties in UNFCCC General Assembly, Emission Trading System(ETS), Clean Development Mechanism(CDM) and Joint Implementation(JI), are key policies related to environment. In advanced countries, greenhouse gas emissions should be reduced average 5.2% level compared to 1990 in total emissions during 2008-2012. World leading carbon market finished the trial on the EU ETS I greenhouse gas emissions trading system, EU ETS II is operated regularly after 2008. World Bank leads to make 'Prototype Carbon Fund(PCF)' in April 2004, which is the world first carbon fund and a representative public carbon fund type, World Bank operate various funds including present PCF. Thus, I would like to propose as follows in relation to this study: First, in the validity analysis of carbon funds, it would be needed to analyze the Emission Reduction Cost Efficiency(ERCE) of carbon. The ERCE is a break-even value which brings the Net Present Value(NPV) to zero. NPV approach is used among projects and it enables potential projects to be compared and evaluated the ERCE on the basis of the net present value of net future cash flows. Therefore, according to results of analysis, carbon funds should be developed and invested. Second, it would be necessary to allow of issuing bonds together with carbon funds, carbon finance etc. Third, carbon funds, it would be reasonable to have a relatively enough maturity in project and as a financial derivatives in the international financial markets, it is needed various types of transactions. Fourth, it would be needed to standardize the carbon emissions trading for more efficiently. Fifth, it would be necessary to establish and invest in various kinds of domestic and overseas global carbon funds, including governments, privates, governments and privates sectors. And it is also needed to establish the medium and long term plans for carbon funds. Sixth, it would be needed to foster the advanced trade mechanisms for carbon funds in the most effective ways. Finally, carbon funds should be used in harmony with international societies to reduce global warming as the social responsible investing funds and it should be contribute to sustainable development. In addition, it would seem that carbon funds should be studied on establishing the contributable standard of sustainable development in the future assignment.

  • PDF

Overseas Review on the In-situ Demonstration of EBS for IN-DEBS Development (공학적방벽 현장실증 시스템 (IN-DEBS) 개발을 위한 해외 실증연구 현황 분석)

  • Lee, Minsoo;Choi, Heui-Joo;Lee, Jong-Youl;Lee, Changsoo;Lee, Jae-Owan;Kim, Inyoung
    • Journal of Nuclear Fuel Cycle and Waste Technology(JNFCWT)
    • /
    • 제12권2호
    • /
    • pp.107-119
    • /
    • 2014
  • The worldwide Status-of-Art survey for the in-situ experiments of the engineered barrier system for HLW underground disposal was performed as a preliminary action for the design of the in-situ demonstration at KURT. Some nations, which have executed or is ongoing the in-situ experiments at their underground research facilities, were summarized in this review. The demonstration projects reviewed were TBT/Sweden-France, LOT/Sweden, HE-E/Switzerland, PRACLAY/Belgium, FEBEX/Spain, HORONOBE/Japan, and BCE/Canada. The investigated items for the projects were mainly their purposes, constitutional structures, test conditions, monitoring parameters and the measuring tools, and test results. In this review, the hardware design and the assembling of the test system were more concentrated rather than their experimental results, because the purpose of this review is to achieve the necessary information for the practical design of the in-situ experiment to be installed at KURT. A mid scale in-situ demonstration of EBS at KURT, that is called IN-DBES, will be launched right after the completion the expanding project of KURT in 2015. It is hoped that the structural design, installing methods, hardware equipments required in the establishment of IN-DEBS will be referred on this review.

Development of EPC Business Process Management Model for Improving Plant Project Management (플랜트프로젝트 사업관리 업무절차 개선을 위한 EPC 수행단계별 BPM모델 개발)

  • Park, Bum-Jin;Lee, Min-Jae;Lee, Tai-Sik
    • Korean Journal of Construction Engineering and Management
    • /
    • 제9권5호
    • /
    • pp.149-158
    • /
    • 2008
  • Plant construction is being a motive power of national economic growth, because it is a higher value-added business which has enormous influence through other industry. But, plant projects management of the domestic company was poor. So, the development of EPC Business Process Management method has been encouraged. Therefore, this paper performed several researches for setting up the EPC Business Process Management Model for improving plant project management. And the details are as follows. First of all, this study collected the work procedure manuals of 12 large-sized international construction companies. Secondly, from the analyzing gathered EPC work procedure manuals, issues of work procedure manuals were analyzed and improvement plans were drawn out. Basis on this, This study presents a method to improve project management for EPC plant project. 'The Work Procedure Matrix for EPC Management' and 'Key Unit Works for EPC Management' were drawn out by using overseas construction management theories and international regulations. In addition, 'The EPC Business Process Management Models' reformed to the Business process method, that is the set of specifications, documents and procedures used to manage the EPC plant project. And it describes how the EPC work procedure manuals will be used. Finally, this study suggests the model of EPC Business Process Management System. The framework of Plant project management can be clarified by using 'The Work Procedure Matrix'. And 'Key Unit Works' are used to organize the work procedure needed to improve plant projects management. The results of this study will help to improve in project management efficiency for plant construction.

Real Option Study on Cookstove Offset Project under Emission Allowance Price Uncertainty (배출권 가격 불확실성을 고려한 고효율 쿡스토브 보급사업 실물옵션 연구)

  • Lee, Jaehyung
    • Environmental and Resource Economics Review
    • /
    • 제29권2호
    • /
    • pp.219-246
    • /
    • 2020
  • From the Phase II (2018~2020) of K-ETS, the offset credit from 'CDM projects that domestic companies and others have carried out in foreign countries' can be used in the K-ETS. As a result, stakeholders in the K-ETS market are actively developing overseas CDM projects, such as the 'high-efficiency cook stove project'. which can secure a large amount of credits while marginal cost is relatively low. This paper develops the investment decision-making model of offset project for the 'high-efficiency cook stove project' using the real option approach. Under the uncertainty of the emission allowance price, the optimal investment threshold (p) is derived and sensitivity analysis is conducted. As a result, in the standard scenario (PoA-S), the optimal investment threshold is 29,054won/ton, which is lower than the stock price (pspot). However, allocation entities are not only economics in the CDM project, but also CDM risk factors such as non-renewable biomass ratio, cook stove replacement ratio, equity ratio with host country, investment period and submission limitation of emission allowance. In addition, offset project developers will be able to derive the optimal investment threshold for each business stage and use it for economic feasibility checks.

Behavior and pillar stability of enlarged existing parallel tunnels (기존 병설터널의 확폭에 따른 터널 거동 및 필라 안정성 분석)

  • Lee, Myeong-Han;Kim, Bumjoo;Jang, Yeon-Soo;Yun, Ji-Nam;Park, Hyun-Gon
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • 제15권5호
    • /
    • pp.537-546
    • /
    • 2013
  • Traffic congestion in existing tunnels has increased due to increased traffic volume and enlarged vehicles. Enlarging existing tunnels has advantages over constructing new tunnels by reducing land purchasing costs as well as minimizing natural environment destruction. In fact, many overseas projects for enlarging existing tunnels have been reported. Thus, it appears that the demand on enlarging existing tunnels continues to rise in Korea in near future. Nonetheless, the studies related to the enlarged tunnels have been relatively rare since there have been few tunnel enlargement projects in Korea. In the present study, the tunnel behavior and the stability of rock pillar when enlarging existing parallel tunnels were investigated by performing FE analysis and using existing theory and empirical relationships. Four different enlarging cases, depending on the enlargement types and directions, were examined in the study. According to the results, for the tunnels with the same pillar width after enlarged, the uni-laterally enlarged tunnel indicated 5 to 20% higher crown settlement compared to the bi-laterally enlarged tunnel, and for the tunnel with the narrowest pillar, the highest shotcrete stress was observed. Also, the strength/stress ratio for rock pillar was more than 1.0 for all four enlargement cases, and the Matsuda's method was found to give higher strength/stress ratio by about 50% compared to the Peck's method.

Investigation of Disputes for Nominated Sub-contractor(NSC) -Focused on the Judicial Precedent of NSC issues in Singapore, Malaysia and Hong Kong- (아시아 건설 시장에서의 지정하도급자(NSC)문제에 관한 연구 - 싱가포르, 말레이시아 그리고 홍콩의 판례를 중심으로 -)

  • Cho, Jaeyong;Kim, Junggon;Park, Hyeonggeun;Kim, Youngsuk;Lee, Boknam
    • Korean Journal of Construction Engineering and Management
    • /
    • 제16권6호
    • /
    • pp.112-123
    • /
    • 2015
  • Many disputes are happened with various causes in overseas construction projects. One of major disputes is closely related with nominated subcontractors (NSC). This paper investigates 30 judical precedents for Singapore, Malaysia and Hongkong to analyze the detailed disputes related with the NSC, and then the judical precedents are classified into 6 categories: Delay and Defect Trouble (T1), Contract Relation (T2), Payment Trouble (T3), Set-off (T4), Liquidation (T5) and so forth (T6). According to the analytical results, the frequency of occurrence of disputes is considerably related with social and economical changes, and the dispute between NSC and employer for residential and commercial building projects is the most frequently happened case. As the results of analysis, therefore, it is concluded that the employer needs to response aggressively to the problems related with NSC, and it is also important to make the council for communication among related bodies. Furthermore, the institutional reform that make the role and the responsibility of employer consistent under considering contract terms and conditions is considered as the most important and fundamental issue.