Framework and Core Competency of Integrated Design Management (IDM)

통합설계관리의 개념적 틀 및 역량강화 요소 - 건축과 플랜트를 중심으로 -

  • Received : 2013.08.14
  • Accepted : 2014.01.02
  • Published : 2014.01.31

Abstract

Recent diversification of project delivery systems coupled with increasing mega-projects requires highly advanced construction management techniques. Among those techniques, procurement and design management are recognized as being the first priority for overseas construction projects. Nevertheless, previous research in design management has been limited to the quality management of the design documents at design stage. Therefore, it is necessary to explore the design management from a comprehensive perspective throughout the project life cycle. In this context, the purpose of this paper is to propose a conceptual framework for integrated design management (IDM). Several different concepts in relation to design management were investigated first in order to identify the major variables of the IDM framework. A comprehensive comparison of construction management methodologies was also analyzed in order to identify key factors of IDM. Finally, an IDM framework was proposed by combining those factors and relevant issues. Based on the proposed framework, a survey was conducted in order to validate the framework as well as to identity important areas for improving competitive capability of Korean construction companies.

최근 해외공사 수주 증가 및 건설산업의 발주방식의 변화로 인해 관리 범위가 확대되고 있으며, 이에 따른 기획단계의 관심이 높아지고 있다. 이를 위해 설계, 구매와 관련한 업무의 중요성이 강조됨에 따라 그에 따른 관리에 대한 필요성이 증대하고 있다. 그럼에도 불구하고, 지금까지 설계관리는 설계단계에 국한되어 성과품의 품질을 위한 관리에 치중해 있었으며, 건설생애주기를 포괄하여 정의한 연구는 매우 부족하다. 따라서 포괄적인 관점에서의 설계관리 개념, 범위 그리고 활용 방식에 대한 연구가 필요하다. 본 연구는 통합설계관리의 개념과 역할을 명확하게 정의하기 위한 개념적 틀(Framework)을 제안하고, 이러한 개념 요소를 바탕으로 향후 발전 방향을 분석하는데 있다. 이를 위하여 플랜트와 건축의 사업특성을 비교하여 실무에서 가장 관심이 높다고 판단되는 건설사업관리 기법 네 가지(공정원가 통합관리, 설계관리, 형상관리 그리고 인터페이스관리)를 선정하였으며, 그 개념 및 활용 범위에 대한 적용 가능성을 고찰하였다. 그리고 설계관리 선행연구 문헌을 조사함으로써 설계관리의 포괄적인 의미 변화와 발전 방향의 모색을 통한 통합설계관리의 틀을 제시하였다. 나아가 이에 대한 타당성 및 적용성을 검증하기 위하여 각 건설사업관리 기법 등 상관관계 및 변화 양상을 분석하였으며, 현장 방문 및 전문가 인터뷰를 통하여 제시된 현황 분석 및 개념 요소에 대한 우선순위를 확인하였다. 본 연구는 플랜트와 대형 건설 사업에서 체계적이고 효율적인 통합설계관리 구현을 위한 우선순위 선정과 전략적인 활용 방안으로서 설계관리를 위한 효과를 기대한다.

Keywords

References

  1. Choi, Y., Lee, J., and Bae, J. (2006). "A Study of Key of Design Management Considering Current Situation of Design Process." Journal of the Architectural Institute of Korea, KICEM, 22(10), pp. 111-118.
  2. Chua, H., Tyagi A., Ling, S., and Bok, H. (2003). "Process-Parameter-Interface Model for Design Management." Journal of Construction Engineering and Management, 129(6), pp. 653-663. https://doi.org/10.1061/(ASCE)0733-9364(2003)129:6(653)
  3. CII (1990). Assessment of Construction Project Management Practices and Performance, The University of Texas at Austin, USA.
  4. Department of Defense; DoD (2001). MIL-HDBK-61A Configuration Management Guidance.
  5. Deshpande, A., Salem, O., and Miller, R (2012). "Analysis of the Higher-Order Partial Correlation between CII Best Practices and Performance of the Design Phase in Fast-Track Industrial Projects." Journal of Construction Engineering and Management, 138(6), pp. 716-724. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000487
  6. Douglas D. G., and Molenaar, K. (2004). "Analysis of Owner's Design and Construction Quality Management Approaches in Design/Build Projects." Journal of Management in Engineering, 20(4), pp. 162-169. https://doi.org/10.1061/(ASCE)0742-597X(2004)20:4(162)
  7. Fiksel, J. and Hayes-Roth, F. (1993). "Computer-aided Requirements Management." Concurrent Engineering, 1(2), pp. 83-92. https://doi.org/10.1177/1063293X9300100201
  8. Ha, J. and Jung, Y. (2013) "Business Functions for Evaluating CM Capability in Plant Construction" Proceeding of KICEM Annual Conference, 547-548.
  9. HG Global (2010). "Construction Management A to Z." Bomoondang, Seoul, Korea.
  10. Hwang, B., and Low, L. (2012). "Construction project change management in Singapore: Status, Importance and Impact." International Journal of Project Management, 30(7), pp. 817-826. https://doi.org/10.1016/j.ijproman.2011.11.001
  11. INPO, (2005). Configuration Management Process Description, Process Description AP-929 1 Revision.
  12. Joo, M. (2011). "Framework for Various Concepts and Methodologies of Information Systems in the Construction Industry" MS thesis, Myongji Univ., Yongin, Korea.
  13. Jun, J., Yi, J., and Shin, S. (2009). "A Proposal of Measuring Items and Management Realm for Capability Assessment of Design Organization" Journal of the Architectural Institute of Korea, 25(3), pp. 77-84.
  14. Jung, C. (2010). "Integrated Design Management of Residential High-rise Building", MS thesis, Pukyong National Univ., Busan, Korea.
  15. Jung, Y. and Gibson, G.E. (1997). "Integration Effectiveness Analysis of Construction Business Functions". Proceedings of the 7th International Conference on Computing in Civil and Building Engineering (ICCCBE-VII), pp. 2195-2200.
  16. Jung, Y. and Gibson, G. (1999). "Planning for Computer Integrated Construction", Journal of Computing in Civil Engineering, ASCE, 13(4), pp. 217-225. https://doi.org/10.1061/(ASCE)0887-3801(1999)13:4(217)
  17. Jung, Y. (2012). "EVMS Changing Trends with Owner and Construction Company." Korean Journal of Construction Engineering and Management, KICEM, 13(4), pp. 5-7.
  18. Jung, Y. (2013). "Strategies for CM Company's Overseas Expansion.", Korean Journal of Construction Engineering and Management, KICEM, 14(3), pp. 15-17. https://doi.org/10.6106/KJCEM.2013.14.4.015
  19. Kamara, J., Anumba, C., and Evbuomwan, N. (2000). "Establishing and Processing Client Requirements-A Key Aspect of Concurrent Engineering in Construction." Engineering Construction and Architectural Management, 7(1), pp. 15-28.
  20. KICT (2003). Plant Project Management Procedure, Research Report, Korea Institute of Constriction Technology, Goyang, Korea.
  21. Kim, Y., and Lee, Y. (2003). "Concept and Main Perspective of Design Management." Korean Journal of Construction Engineering and Management, KICEM, 4(3), pp. 3-8.
  22. Ko, H., and Park, H. (2009). "A Study of Development of Change Process for Configuration Management in Construction Project Management." Journal of the Korean Society of Civil Engineers, 29(1), pp. 81-89.
  23. Koo, J., Kim T., and Chin K.-H. (2000). "Study on the Improvement of Construction Specifications and Design Codes." Research Report, Korea Institute of Constriction Technology (KICT), Goyang, Korea.
  24. Koskela, L., Huovila, P. and Leinonen, J. (2002). "Design Management in Building Construction: from Theory to Practice." Journal of Construction Research, 3(01), pp. 1-16. https://doi.org/10.1142/S1609945102000035
  25. Lee, S. (2012). "Evaluating Inter-organizational Information Systems for Construction Management (CM) Firms" MS thesis, Myongji Univ., Yongin, Korea.
  26. Nam, H., Lee, J., and Chun, J. (2007). "A Study On Construction Project Expected Collaboration Business Design Management." Proceeding of KICEM Annual Conference, pp. 589-592.
  27. Park, M., Ham, Y., Lee, H.-S., and Kim, W.-Y. (2010). "Development of Design Process Management Model using Dependency Structure Matrix for Constructability", Korean Journal of Construction Engineering and Management, KICEM. 11(5), pp. 65-74. https://doi.org/10.6106/KJCEM.2010.11.5.65
  28. PMI (2013). Project Management Body of Knowledge (PMBOK Guide) 5 Edition, USA.
  29. Samoo (2010). Design Management Guide Book, Samoo Architectural & Engineering, Seoul, Korea.
  30. Shin, J., Kim, T., and Bae, J. (2006). "Introducing Information- Oriented Work Process Modeling Method for Effective Design Management in Design Collaboration." Journal of the Architectural Institute of Korea, 22(8), pp. 181-188.
  31. Steinberger, L. (2011). "Configuration Management: Mega Building Construction Programs", Presentation Material at KICEM Seminar, August 11, 2011, Seoul, Korea.
  32. Sung, Y., Choi, S., Kang, S., and Lee, B. (2012). "An Analysis on the Business Strategies of Global Top Contractors in International Building and Civil Infrastructure Market." Research Report, Constriction and Economy Research Institute of Korea (CERIK), Seoul, Korea.
  33. Tzortzopoulos, P., and Formoso, C. (1999). "Considerations on Application of Lean Construction Principles to Design Management." Proceedings IGLC, 7, pp. 26-28.
  34. Yoo, S., Yi, J., Park, J., and Jun, J. (2008). "A Study on Developing Systems for Managing Information on Owner's Requirements in the Design Phase." Korean Journal of Construction Engineering and Management, KICEM, 9(3), pp. 126-135.