Browse > Article
http://dx.doi.org/10.6106/KJCEM.2014.15.1.122

Framework and Core Competency of Integrated Design Management (IDM)  

Kim, Yesol (Shinhan Architects and Engineers Co., Ltd.)
Jung, Youngsoo (College of Architecture, Myongji University)
Publication Information
Korean Journal of Construction Engineering and Management / v.15, no.1, 2014 , pp. 122-133 More about this Journal
Abstract
Recent diversification of project delivery systems coupled with increasing mega-projects requires highly advanced construction management techniques. Among those techniques, procurement and design management are recognized as being the first priority for overseas construction projects. Nevertheless, previous research in design management has been limited to the quality management of the design documents at design stage. Therefore, it is necessary to explore the design management from a comprehensive perspective throughout the project life cycle. In this context, the purpose of this paper is to propose a conceptual framework for integrated design management (IDM). Several different concepts in relation to design management were investigated first in order to identify the major variables of the IDM framework. A comprehensive comparison of construction management methodologies was also analyzed in order to identify key factors of IDM. Finally, an IDM framework was proposed by combining those factors and relevant issues. Based on the proposed framework, a survey was conducted in order to validate the framework as well as to identity important areas for improving competitive capability of Korean construction companies.
Keywords
Design management; Configuration management; Interface management; EVMS;
Citations & Related Records
Times Cited By KSCI : 6  (Citation Analysis)
연도 인용수 순위
1 Choi, Y., Lee, J., and Bae, J. (2006). "A Study of Key of Design Management Considering Current Situation of Design Process." Journal of the Architectural Institute of Korea, KICEM, 22(10), pp. 111-118.   과학기술학회마을
2 Chua, H., Tyagi A., Ling, S., and Bok, H. (2003). "Process-Parameter-Interface Model for Design Management." Journal of Construction Engineering and Management, 129(6), pp. 653-663.   DOI   ScienceOn
3 CII (1990). Assessment of Construction Project Management Practices and Performance, The University of Texas at Austin, USA.
4 Department of Defense; DoD (2001). MIL-HDBK-61A Configuration Management Guidance.
5 Deshpande, A., Salem, O., and Miller, R (2012). "Analysis of the Higher-Order Partial Correlation between CII Best Practices and Performance of the Design Phase in Fast-Track Industrial Projects." Journal of Construction Engineering and Management, 138(6), pp. 716-724.   DOI   ScienceOn
6 Douglas D. G., and Molenaar, K. (2004). "Analysis of Owner's Design and Construction Quality Management Approaches in Design/Build Projects." Journal of Management in Engineering, 20(4), pp. 162-169.   DOI   ScienceOn
7 Fiksel, J. and Hayes-Roth, F. (1993). "Computer-aided Requirements Management." Concurrent Engineering, 1(2), pp. 83-92.   DOI
8 Ha, J. and Jung, Y. (2013) "Business Functions for Evaluating CM Capability in Plant Construction" Proceeding of KICEM Annual Conference, 547-548.
9 HG Global (2010). "Construction Management A to Z." Bomoondang, Seoul, Korea.
10 Hwang, B., and Low, L. (2012). "Construction project change management in Singapore: Status, Importance and Impact." International Journal of Project Management, 30(7), pp. 817-826.   DOI   ScienceOn
11 INPO, (2005). Configuration Management Process Description, Process Description AP-929 1 Revision.
12 Joo, M. (2011). "Framework for Various Concepts and Methodologies of Information Systems in the Construction Industry" MS thesis, Myongji Univ., Yongin, Korea.
13 Jun, J., Yi, J., and Shin, S. (2009). "A Proposal of Measuring Items and Management Realm for Capability Assessment of Design Organization" Journal of the Architectural Institute of Korea, 25(3), pp. 77-84.   과학기술학회마을
14 Jung, C. (2010). "Integrated Design Management of Residential High-rise Building", MS thesis, Pukyong National Univ., Busan, Korea.
15 Jung, Y. and Gibson, G.E. (1997). "Integration Effectiveness Analysis of Construction Business Functions". Proceedings of the 7th International Conference on Computing in Civil and Building Engineering (ICCCBE-VII), pp. 2195-2200.
16 Jung, Y. and Gibson, G. (1999). "Planning for Computer Integrated Construction", Journal of Computing in Civil Engineering, ASCE, 13(4), pp. 217-225.   DOI
17 KICT (2003). Plant Project Management Procedure, Research Report, Korea Institute of Constriction Technology, Goyang, Korea.
18 Jung, Y. (2012). "EVMS Changing Trends with Owner and Construction Company." Korean Journal of Construction Engineering and Management, KICEM, 13(4), pp. 5-7.
19 Jung, Y. (2013). "Strategies for CM Company's Overseas Expansion.", Korean Journal of Construction Engineering and Management, KICEM, 14(3), pp. 15-17.   DOI   ScienceOn
20 Kamara, J., Anumba, C., and Evbuomwan, N. (2000). "Establishing and Processing Client Requirements-A Key Aspect of Concurrent Engineering in Construction." Engineering Construction and Architectural Management, 7(1), pp. 15-28.
21 Kim, Y., and Lee, Y. (2003). "Concept and Main Perspective of Design Management." Korean Journal of Construction Engineering and Management, KICEM, 4(3), pp. 3-8.
22 Ko, H., and Park, H. (2009). "A Study of Development of Change Process for Configuration Management in Construction Project Management." Journal of the Korean Society of Civil Engineers, 29(1), pp. 81-89.   과학기술학회마을
23 Koo, J., Kim T., and Chin K.-H. (2000). "Study on the Improvement of Construction Specifications and Design Codes." Research Report, Korea Institute of Constriction Technology (KICT), Goyang, Korea.
24 Koskela, L., Huovila, P. and Leinonen, J. (2002). "Design Management in Building Construction: from Theory to Practice." Journal of Construction Research, 3(01), pp. 1-16.   DOI
25 Lee, S. (2012). "Evaluating Inter-organizational Information Systems for Construction Management (CM) Firms" MS thesis, Myongji Univ., Yongin, Korea.
26 Samoo (2010). Design Management Guide Book, Samoo Architectural & Engineering, Seoul, Korea.
27 Nam, H., Lee, J., and Chun, J. (2007). "A Study On Construction Project Expected Collaboration Business Design Management." Proceeding of KICEM Annual Conference, pp. 589-592.   과학기술학회마을
28 Park, M., Ham, Y., Lee, H.-S., and Kim, W.-Y. (2010). "Development of Design Process Management Model using Dependency Structure Matrix for Constructability", Korean Journal of Construction Engineering and Management, KICEM. 11(5), pp. 65-74.   과학기술학회마을   DOI   ScienceOn
29 PMI (2013). Project Management Body of Knowledge (PMBOK Guide) 5 Edition, USA.
30 Shin, J., Kim, T., and Bae, J. (2006). "Introducing Information- Oriented Work Process Modeling Method for Effective Design Management in Design Collaboration." Journal of the Architectural Institute of Korea, 22(8), pp. 181-188.   과학기술학회마을
31 Steinberger, L. (2011). "Configuration Management: Mega Building Construction Programs", Presentation Material at KICEM Seminar, August 11, 2011, Seoul, Korea.
32 Sung, Y., Choi, S., Kang, S., and Lee, B. (2012). "An Analysis on the Business Strategies of Global Top Contractors in International Building and Civil Infrastructure Market." Research Report, Constriction and Economy Research Institute of Korea (CERIK), Seoul, Korea.
33 Tzortzopoulos, P., and Formoso, C. (1999). "Considerations on Application of Lean Construction Principles to Design Management." Proceedings IGLC, 7, pp. 26-28.
34 Yoo, S., Yi, J., Park, J., and Jun, J. (2008). "A Study on Developing Systems for Managing Information on Owner's Requirements in the Design Phase." Korean Journal of Construction Engineering and Management, KICEM, 9(3), pp. 126-135.