Browse > Article

Development of EPC Business Process Management Model for Improving Plant Project Management  

Park, Bum-Jin (충남대학교 대학원 토목공학과)
Lee, Min-Jae (충남대학교 토목환경공학부)
Lee, Tai-Sik (한양대학교 건설환경시스템공학과)
Publication Information
Korean Journal of Construction Engineering and Management / v.9, no.5, 2008 , pp. 149-158 More about this Journal
Abstract
Plant construction is being a motive power of national economic growth, because it is a higher value-added business which has enormous influence through other industry. But, plant projects management of the domestic company was poor. So, the development of EPC Business Process Management method has been encouraged. Therefore, this paper performed several researches for setting up the EPC Business Process Management Model for improving plant project management. And the details are as follows. First of all, this study collected the work procedure manuals of 12 large-sized international construction companies. Secondly, from the analyzing gathered EPC work procedure manuals, issues of work procedure manuals were analyzed and improvement plans were drawn out. Basis on this, This study presents a method to improve project management for EPC plant project. 'The Work Procedure Matrix for EPC Management' and 'Key Unit Works for EPC Management' were drawn out by using overseas construction management theories and international regulations. In addition, 'The EPC Business Process Management Models' reformed to the Business process method, that is the set of specifications, documents and procedures used to manage the EPC plant project. And it describes how the EPC work procedure manuals will be used. Finally, this study suggests the model of EPC Business Process Management System. The framework of Plant project management can be clarified by using 'The Work Procedure Matrix'. And 'Key Unit Works' are used to organize the work procedure needed to improve plant projects management. The results of this study will help to improve in project management efficiency for plant construction.
Keywords
EPC; Project management procedure manual; Plant; BPM;
Citations & Related Records
연도 인용수 순위
  • Reference
1 박범진(2008). '건설프로젝트의 사업관리 프로세스 개선을 위한 EPC 수행단계별 BPM모델 개발', 충남대학교 대학원 석사학위 논문
2 한국건설기술연구원(2002). '산업설비 중장기 기술기반 확충방안 연구', 건설교통부
3 ISO 9000;2000 (2000). 'Quality Management System-Fundamentals and Vocabulary'
4 건설기술연구원(2005). '산업설비 통합 수행체제 핵심기술 개발(2) 연구 보고서'
5 건설기술사회(2003). '건설사업관리(CM)지식체계', 기문 당
6 Project Management Institute(2004). 'A guied to the project management body of knowledge : PMBOK guide 3rd'
7 CMAA(Construction Mangement Association of America). www.cmaanet.org
8 김영섭(2007). '건설업 프로세스경영의 성숙도 모델 적용 및 경영성과에 미치는 영향 분석', 중앙대학교 건설대학원 석사학위 논문
9 현대건설(2007). '플랜트 프로젝트 관리체계 표준화 기술 개발', 2차년도 연구보고서
10 'daratechPLANT2007 conference', Houston, Texas. 2007. 1
11 ISO 9001;2000(2000). 'Quality Management System Requirement'
12 현창택(2003). '건설사업관리 업무절차서', 서울시립대학교
13 ISO 9004;2000 (2000). 'Quality Management Systems-Guidelines for Performance Improvements'
14 현대건설(2006). '플랜트 프로젝트 관리체계 표준화 기술 개발', 1차년도 연구보고서
15 'BPTrends Business Process Trends Volume 4, Number9', 2006
16 한국기술사회(2003). '업무수행 표준절차 건설사업관리 (CM) 지식체계', 기문당
17 현창택(2003). 'CM 형태별 활성화 방안 및 업무절차서 개 발', 서울시립대학교