References
- Kim, S. (2011). "The Problems and Reform Measures of Conflict Resolutions related to Constructions through ADR", Journal of Arbitration Studies, 21(1), pp. 87-107. https://doi.org/10.16998/jas.2011.21.1.87
- Cho, J., Kim, J., and Park, H. (2014). "A Comparative Study on the Nominated Subcontractor(NSC) System of Building Construction Project in Asian Commonwealth of Nations", Korean Journal of construction Engineering and Management, KICEM, 15(3), pp. 9-19.
- Cho, J. and Furusaka, S. (2015). "A study on the nomination of nominated subcontractor for building construction projects in Singapore", Journal of architecture and planning, AIJ, 80(710), pp. 933-941. https://doi.org/10.3130/aija.80.933
- Cho, Y. (2010). "A Study on the Interpretation Trend of Current Cases for Warranty in U.S.A", Journal of the Korea Institute of Building Construction, 10(1), pp. 101-109. https://doi.org/10.5345/JKIC.2010.10.1.101
- Cho, Y. (2012). "A Study on the Improvement of Force Majeure Clause in Government General Construction Contract Conditions through Case Analysis", Journal of the Architectural Institute of Korea Structure & Construction, 25(6), pp. 103-110.
- Choi, J., Park, K. and Kim, Y. (2004). "A Study on the Unfair Aspect of Specific Provisions in the Construction Contract", Korean Journal of construction Engineering and Management, KICEM, 5(6), pp. 146-153.
- Convery, J. (1999). "Standard Form Building Contracts and Duty of Care", The Modern Law Revies Limited, 62(5), pp. 766-776. https://doi.org/10.1111/1468-2230.00235
-
Government of the Hong Kong Special Administrative Region of the People's Republic of China (1997). Sino-British Joint Declaration Clause 12,
-
Hong Kong Supreme Court Homepage :
- John and Will (2008). "Construction Contracts: Law and Management" 4th Edition, Taylor & Francis, p. 283.
- Lee, D., Kim, S., Song, Y., Kim, B. and Lee, W. (2010). "An Analysis of Judicial Precedents for Progress Payment to Subcontractor", Journal of the Korea Institute of Building Construction, 10(1), pp. 111-120. https://doi.org/10.5345/JKIC.2010.10.1.111
- Lee, J., Kim, J., Sung, N. and Kim, Y. (2002). "A Webbased Model for the Analysis of Construction Delay Claims", Journal of the Architectural Institute of Korea Structure & Construction, 18(12), pp. 133-142.
- Lee, J. (2005). "Interpretation of Concurrent Delays in Construction", Journal of the Architectural Institute of Korea Structure & Construction, 21(8), pp. 165-172.
- Lim, T. (2012). "Essence of Time in Construction Contracts", Australasian Journal of Construction Economics and Building, 9(2), pp. 1-6.
- Mbachu, J. (2008). "Conceptual framework for the assessment of subcontractors'eligibility and performance in the construction industry", Construction Management and Economics, 26(5), pp. 471-484. https://doi.org/10.1080/01446190801918730
-
Malaysia Federal Court Homepage: Sejarah Kehakiman Malaysia,
-
Ministry of Land, Transport and Maritime Affairs of Korea homepage: International Construction Statistics,
- Osborne D. (2006). "Effect of conditions precedent on building contracts", Journal of Buliding Appraisal, 2(3), pp. 188-192. https://doi.org/10.1057/palgrave.jba.2950040
- Supardi, A., Adnan, H., and Yaakob, J. (2007). "Legal Conditionality of Performance Bond in Malaysian Construction Contract", Built Environmental Journal, 4(2) pp. 11-22.
-
Singapore Academy of Law Homepage : Commercial Law, Ch.26 Building and Construction Law,
-
Singapore Supreme Court Homepage : About Us, Our Courts,
- Takahashi M. (2009). "IBuilding Owner's Responsibility and Tenants' one in Stock ERA", Journal of Architecture and Planning., AIJ, 74(645), pp. 2459-2464. https://doi.org/10.3130/aija.74.2459
- Takahashi M. (2012). "Identifying Regal Matter of Japanese Architect Contracts Considering Professional Responsibilities in English law and American Law", Journal of Architecture and Planning, AIJ, 77(677), pp. 1715-1723. https://doi.org/10.3130/aija.77.1715
- Tulacz, G. (2005-2013). "Annual Reports : The Top 250 International Contractors", Engineering News-Record
- Uher T. E. (1991). "Risks in subcontracting : Subcontract conditions" Construction Management and Economics, 9(6), pp. 495-508. https://doi.org/10.1080/01446199100000038
- Yik, F. W., Lai, J. H., Chan, K. T., and Yiu, E. C. (2006 ). "Problems with specialist subcontracting in the construction industry", Building Services Engineering Research and Technology, 27(3), pp. 183-193. https://doi.org/10.1191/0143624406bse160oa
- Yun, C., and Kim, S. (2003). "An Extraction of the Risk Events and Response Strategies based on the Construction Claim Cases in Korea", Journal of the Architectural Institute of Korea Structure & Construction, 19(9), pp. 163-170.
- Zhi, H. (1995). "Risk management for overseas construction projects", International journal of project management, 13(4), pp. 231-237. https://doi.org/10.1016/0263-7863(95)00015-I