• 제목/요약/키워드: Operation Scheduling

검색결과 521건 처리시간 0.03초

동정 네트 모델에 의한 공정 계획과 일정 계획의 통합 (A Process-net based System for the Integration of Process Planning and Operation Scheduling)

  • 박지형;강민형;노형민
    • 한국정밀공학회:학술대회논문집
    • /
    • 한국정밀공학회 1997년도 춘계학술대회 논문집
    • /
    • pp.445-449
    • /
    • 1997
  • In order to provide a manufacturing system with efficiency and flexibility to cope with the changes in shop floor status, the integration of process planning and operations scheduling is required. In this paper,an integrated system of process planning and operations scheduling based on the concept of process net model is presented. The process net model includes the alternative process plans. The integrated system is applied for prismatic parts.

  • PDF

이용자 만족도를 반영한 최적 버스 배차 간격 설정 모형의 개발 (Improvement of Optimal Bus Scheduling Model Reflecting Bus Passenger's Degree of Satisfaction)

  • 배상훈;김탁영;류병용
    • 한국ITS학회 논문지
    • /
    • 제6권3호
    • /
    • pp.12-23
    • /
    • 2007
  • 본 연구의 목적은 현행 버스 배차 간격 설정 시스템의 문제점을 제시하고, 이용자의 만족도와 버스 회사의 운영 효율성을 동시에 높일 수 있도록 이용자 만족도를 반영한 최적의 버스 배차 간격 설정 모형의 개발에 있다. 본 연구에서는 기존의 버스 운영비용, 승객 대기시간 비용 및 승객 통행시간 비용의 합으로 총 교통비용을 최소화하는 기존 모형에 이용자 만족도를 반영하여 최적 버스 배차 간격 설정 모형을 개발하였다. 본 연구는 최적 배차 간격 설정을 위해 선형계획법을 사용하였고, 이를 위해 선형계획법을 기반한 LINGO 프로그램을 사용하였다. 또한 부산의 일반 사례를 총 교통비용을 최소화하는 기존의 모형 및 현행 버스 배차간격 설정 시스템과 개발한 모형에 각각 적용하여 총 교통비용의 차이를 비교하였다.

  • PDF

독립운전 시나리오를 고려한 마이크로그리드의 최적 발전기 기동정지 계획 (Unit Commitment of a Microgrid Considering Islanded Operation Scenarios)

  • 이시영
    • 전기학회논문지
    • /
    • 제67권6호
    • /
    • pp.708-714
    • /
    • 2018
  • Islanded operation of a microgrid can ensure the reliable operation of the system when a large accident occurs in the main grid. However, because the generation capability of a microgrid is typically limited, a microgrid operator should take islanded operation risk into account in scheduling its generation resources. To address this problem, in this paper we have proposed two unit commitment formulations based on the islanding scenario that reflect the expected and worst-case values of the islanded operation risk. An optimal resource scheduling strategy is obtained for the microgrid operator by solving these optimization problem, and the effectiveness of the proposed method is investigated by numerical simulations.

Multiobjective Genetic Algorithm for Scheduling Problems in Manufacturing Systems

  • Gen, Mitsuo;Lin, Lin
    • Industrial Engineering and Management Systems
    • /
    • 제11권4호
    • /
    • pp.310-330
    • /
    • 2012
  • Scheduling is an important tool for a manufacturing system, where it can have a major impact on the productivity of a production process. In manufacturing systems, the purpose of scheduling is to minimize the production time and costs, by assigning a production facility when to make, with which staff, and on which equipment. Production scheduling aims to maximize the efficiency of the operation and reduce the costs. In order to find an optimal solution to manufacturing scheduling problems, it attempts to solve complex combinatorial optimization problems. Unfortunately, most of them fall into the class of NP-hard combinatorial problems. Genetic algorithm (GA) is one of the generic population-based metaheuristic optimization algorithms and the best one for finding a satisfactory solution in an acceptable time for the NP-hard scheduling problems. GA is the most popular type of evolutionary algorithm. In this survey paper, we address firstly multiobjective hybrid GA combined with adaptive fuzzy logic controller which gives fitness assignment mechanism and performance measures for solving multiple objective optimization problems, and four crucial issues in the manufacturing scheduling including a mathematical model, GA-based solution method and case study in flexible job-shop scheduling problem (fJSP), automatic guided vehicle (AGV) dispatching models in flexible manufacturing system (FMS) combined with priority-based GA, recent advanced planning and scheduling (APS) models and integrated systems for manufacturing.

반도체 웨이퍼 팹의 에이전트 기반 스케쥴링 방법 (Agent-Based Scheduling for Semiconductor Wafer Fabrication Facilities)

  • 윤현중
    • 대한기계학회논문집A
    • /
    • 제29권11호
    • /
    • pp.1463-1471
    • /
    • 2005
  • This paper proposes an agent-based scheduling method fur semiconductor wafer fabrication facilities with hard inter-operation temporal constraints. The scheduling problem is to find the feasible schedules that guarantee both logical and temporal correctness. A proposed multi-agent based architecture is composed of scheduling agents, workcell agents, and machine agents. A scheduling agent computes optimal schedules through bidding mechanisms with a subset or entire set of the workcell agents. A dynamic planning-based approach is adopted for the scheduling mechanism so that the dynamic behaviors such as aperiodic job arrivals and reconfiguration can be taken into consideration.

설비 및 품질 데이터 연계 지능형 생산계획 스케줄링 모델 개발을 위한 시스템엔지니어링 접근 방법 (Systems Engineering Approach to Develop Intelligent Production Planning Scheduling Model linked to Machine and Quality Data)

  • 박종희;김진영;홍대근
    • 시스템엔지니어링학술지
    • /
    • 제17권2호
    • /
    • pp.1-8
    • /
    • 2021
  • This study proposes a systems engineering approach for the development of an advanced planning & scheduling (APS) system for a cosmetic case manufacturing factory. The APS system makes production plans and schedules based on the injection process, which consists of 27 plastic injection machines in parallel to control recommended inventory of products. The system uses machine operation/failure information and defective product/work-in-process tracking information to support intelligent scheduling. Furthermore, a genetic algorithm model is applied to handle the complexity of heuristic rules and machine/quality constraints in this process. As a result of the development, the recommended inventory compliance rate is improved by scheduling the 30-day production plan for 15 main products.

전투비행대대 비행스케줄링에 관한 연구 (A Study of Flight Scheduling Problem on Fighter Squadron)

  • 이문걸;서상훈
    • 한국경영과학회지
    • /
    • 제39권2호
    • /
    • pp.37-48
    • /
    • 2014
  • Fighter squadron flight scheduling is the integrated air operation plan that is an important role for improving pilot's flight skill and maintaining combat readiness by efficient using available all air resources including pilot, aircrafts, air-weapons, fuel and supporting facilities etc. Korea airforce, however, has a limit as to an effective flight operation due to manual flight scheduling with scheduler's own experience and intuition. Therefore, in our study, we propose the optimization model of flight scheduling based on mixed integer programming. This model includes several constraints of realistic and essential quantified data related with flight schedule and can assign appropriate pilots optimally which are distinctive three type's solutions : flight, alert and duty crew schedules. Proposed solution method can be improved pilot's capability and allocated further air resources systematically and efficiently. In addition, it can be reduced a workload of flight scheduler and minimized obstructed factors of flight safety. Finally, we demonstrate the experiment's results for the check of efficiency and validity of this model.

상위레벨 회로합성을 위한 자원제한 스케줄링 알고리즘 (A Resource-Constrained Scheduling Algorithm for High Level Synthesis)

  • 황인재
    • 융합신호처리학회논문지
    • /
    • 제6권1호
    • /
    • pp.39-44
    • /
    • 2005
  • 스케줄링은 CDFG 내의 각 연산에 우선순위 관계를 유지하면서 연산이 수행될 제어스텝을 할당하는 과정으로 합성된 하드웨어의 성능에 직접적인 영향을 미치는 중요한 단계이다. 본 논문에서는 자원제한 스케줄링 알고리즘을 제안한다. 제안된 알고리즘은 주어진 그래프를 분석하여 연산유닛의 개수를 결정하고 이에 따라 각 연산을 제어스텝에 할당한다. 스케줄링 과정 중에 상대적으로 부족한 연산유닛과 여유 있는 연산유닛을 구별하여 연산유닛의 수를 조절한 후 반복적으로 성능개선을 시도하게 된다. 제안된 알고리즘의 성능을 평가하기 위하여 모의실험을 수행하였고 그 결과는 기존의 방법들에 비해 우수함을 알 수 있었다.

  • PDF

공정납기를 이용한 jop shop 일정계획의 발견적 기법 (A heuristic technique for jop shop scheduling using operation due dates)

  • 배상윤;김여근;김영균
    • 한국경영과학회:학술대회논문집
    • /
    • 대한산업공학회/한국경영과학회 1996년도 춘계공동학술대회논문집; 공군사관학교, 청주; 26-27 Apr. 1996
    • /
    • pp.46-49
    • /
    • 1996
  • This paper presents a multi-pass heuristic for job shop scheduling with due dates. The proposed heuristic iteratively improves solutions based on operation due dates. To find a good solution efficiently, a method for searching the neighborhood of current schedule is developed. The heuristic is compared with two existing heuristics as well as several dispatching rules in terms of solution quality and computation time. The experimental results show that the proposed approach is promising.

  • PDF

분산처리 최적조류계산 기반 연계계통 급전계획 알고리즘 개발 (A New Dispatch Scheduling Algorithm Applicable to Interconnected Regional Systems with Distributed Inter-temporal Optimal Power Flow)

  • 정구형;강동주;김발호
    • 전기학회논문지
    • /
    • 제56권10호
    • /
    • pp.1721-1730
    • /
    • 2007
  • SThis paper proposes a new dispatch scheduling algorithm in interconnected regional system operations. The dispatch scheduling formulated as mixed integer non-linear programming (MINLP) problem can efficiently be computed by generalized Benders decomposition (GBD) algorithm. GBD guarantees adequate computation speed and solution convergency since it decomposes a primal problem into a master problem and subproblems for simplicity. In addition, the inter-temporal optimal power flow (OPF) subproblem of the dispatch scheduling problem is comprised of various variables and constraints considering time-continuity and it makes the inter-temporal OPF complex due to increased dimensions of the optimization problem. In this paper, regional decomposition technique based on auxiliary problem principle (APP) algorithm is introduced to obtain efficient inter-temporal OPF solution through the parallel implementation. In addition, it can find the most economic dispatch schedule incorporating power transaction without private information open. Therefore, it can be expanded as an efficient dispatch scheduling model for interconnected system operation.