DOI QR코드

DOI QR Code

Agent-Based Scheduling for Semiconductor Wafer Fabrication Facilities

반도체 웨이퍼 팹의 에이전트 기반 스케쥴링 방법

  • 윤현중 (한국과학기술원 기계기술연구소)
  • Published : 2005.11.01

Abstract

This paper proposes an agent-based scheduling method fur semiconductor wafer fabrication facilities with hard inter-operation temporal constraints. The scheduling problem is to find the feasible schedules that guarantee both logical and temporal correctness. A proposed multi-agent based architecture is composed of scheduling agents, workcell agents, and machine agents. A scheduling agent computes optimal schedules through bidding mechanisms with a subset or entire set of the workcell agents. A dynamic planning-based approach is adopted for the scheduling mechanism so that the dynamic behaviors such as aperiodic job arrivals and reconfiguration can be taken into consideration.

Keywords

References

  1. LU S. H, P.R. Kumar, 'Distributed scheduling based on due dates and buffer priorities', IEEE Transactions on Automatic Control, 36, 1406-1416, 1991 https://doi.org/10.1109/9.106156
  2. Kim, Y. D., Kim, J. U., Lim, S. K. and Jun, H. B., 1998, 'Due-Date Based Scheduling and Control Policies in a Multiproduct Semiconductor Wafer Fabrication Facility,' IEEE Transactions on Semiconductor Manufacturing, Vol. 11, No. 1, pp. 155-164 https://doi.org/10.1109/66.661295
  3. Kim, Y. D., Kim, J. G., Choi, B. and Kim, H. U., 2001, 'Production Scheduling in a Semiconductor Wafer Fabrication Facility Producing Multiple Product Types with Distinct Due Dates,' IEEE Transactions on Robotics and Automation, Vol. 17, No. 5, pp. 589-598 https://doi.org/10.1109/70.964660
  4. Mason, S. J., Jin, S. and Wessels, C. M., 2004, 'Rescheduling Strategies for Minimizing Total Weighted Tardiness in Complex Job Shop,' International Journal of Production Research, Vol. 42, No. 3, pp. 613-628 https://doi.org/10.1081/00207540310001614132
  5. Watts, H., 2000, 'Improving Fab Performance,' Future Fab International, Vol. 9
  6. Robinson, J. K., 1998, 'Capacity Planning in a Semiconductor Wafer Fabrication Facility with Time Constraints between Process Steps,' Ph. D. Dissertation, Department of Mechanical and Industrial Engineering, University of Massachusetts, Amherst
  7. Nissanke, N., 1997, Realtime System, Prentice Hall, London
  8. Ramamritham, K. and Stankovic, J.A., 1994, 'Scheduling Algorithm and Operating Systems Support for Real-Time Systems,' Proceedings of the IEEE, Vol. 82, No. 1, pp. 55-67 https://doi.org/10.1109/5.259426
  9. Hall, N. G. and Sriskandarajah, C, 1996, 'A Survey of Machine Scheduling Problems with Blocking and No-Wait in Process,' Operations Research, Vol. 44, No. 3, pp. 510-525 https://doi.org/10.1287/opre.44.3.510
  10. Chen, H., Chu, C. and Proth, J. M., 1998, 'Cyclic Scheduling of a Hoist with Time Window Constraints,' IEEE Transactions on Robotics and Automation, Vol. 14, No. 1, pp. 144-152 https://doi.org/10.1109/70.660860
  11. Stankovic, J. A., Spuri, M., Ramamritham, K. and Buttazo, G. C., 1998, Deadline Scheduling for Real-Time Systems: EDF and Related Algorithms, Kluwer Academic Publishers, Norwell, MA
  12. Monch, L., Stehli, M. and Zimmerman, J., 2003, 'FABMAS: An Agent-Based System for Production Control of Semiconductor Manufacturing Processes,' in Proceedings of the First International Conference on Industrial Application of Holonic and Multi-Agent Systems, Prague, Czech Republic
  13. Monch, L. and Stehli, M., 2003, 'An Ontology for Production Control of Semiconductor Manufacturing Processes,' in Proceedings of the First German Conference on Multiagent System Technologies, Erfurt, Germany
  14. Wyns, J., 1999, 'Reference Architecture for Holonic Manufacturing Systems: The Key to Support Evolution and Reconfiguration,' Ph. D. Dissertation, Department of Mechanical Engineering, Katholieke Universiteit Leuven, Belgium
  15. Yu, C. Y. and Huang, H. P., 2001, 'Development of the Order Fulfillment Process in the Foundry Fab by Applying Disributed Multi-Agents on a Generic Message-Passing Platform,' IEEE/ASME Transactions on Mechatronics, Vol. 6, No. 4, pp. 387-398 https://doi.org/10.1109/3516.974852
  16. Cheng, F. T., Chang, C. F. and Wu, S. L., 2004, 'Development of Holonic Manufacturing Execution Systems,' Journal of Intelligent Manufacturing, Vol. 15, pp. 253-267 https://doi.org/10.1023/B:JIMS.0000018037.63935.a1
  17. Shen, W., 2002, 'Distributed Manufacturing Scheduling Using Intelligent Agents,' IEEE Intelligent Systems, Vol. 17, No. 1, pp. 88-94 https://doi.org/10.1109/5254.988492
  18. Yoon, H. J., 2004, 'Real-Time Scheduling of Semiconductor Integrated Single-Wafer Processing Tools,' Ph. D. Dissertation, Department of Mechanical Engineering, Korea Advanced Institute of Science and Technology, Daejeon, Republic of Korea
  19. Dechter, R., Meiri, I. and Pearl, J., 1991, 'Temporal Constraint Network,' Artificial Intelligence, Vol. 49, pp. 61-95 https://doi.org/10.1016/0004-3702(91)90006-6
  20. Schwalb, E. and Dechter, R., 1997, 'Processing Disjunction in Temporal Constraint Networks,' Artificial Intelligence, Vol. 93, pp. 29-61 https://doi.org/10.1016/S0004-3702(97)00009-X
  21. Kemp, K, Intel Five-Machine Six Step Mini-Fab Description, Intel/ASU Report [on-line]
  22. Yoon, H. J. and Lee, D. Y., 2000, 'A Control Method to Reduce the Standard Deviation of Flow Time in Wafer Fabrication,' IEEE Transactions on Semiconductor Manufacturing, Vol. 13, No. 3, pp. 389-392 https://doi.org/10.1109/66.857950
  23. Lu, S. H., Ramaswamy, D. and Kumar, P. R., 1994, 'Efficient Scheduling Policies to Reduce Mean and Variance of Cycle-Time in Semiconductor Manufacturing Plants,' IEEE Transactions on Semiconductor Manufacturing, Vol. 7, No. 3, pp. 374-388 https://doi.org/10.1109/66.311341

Cited by

  1. Optimization of mixed casting processes considering discrete ingot sizes vol.23, pp.7, 2009, https://doi.org/10.1007/s12206-009-0428-y
  2. Data acquisition system of compound semiconductor fabrication vol.21, pp.12, 2007, https://doi.org/10.1007/BF03177475