• Title/Summary/Keyword: Operating time-interval

Search Result 135, Processing Time 0.026 seconds

Adaptive Protection Algorithm for Overcurrent Relay in Distribution System with DG

  • Sung, Byung Chul;Lee, Soo Hyoung;Park, Jung-Wook;Meliopoulos, A.P.S.
    • Journal of Electrical Engineering and Technology
    • /
    • v.8 no.5
    • /
    • pp.1002-1011
    • /
    • 2013
  • This paper proposes the new adaptive protection algorithm for inverse-time overcurrent relays (OCRs) to ensure their proper operating time and protective coordination. The application of the proposed algorithm requires digital protection relays with microcontroller and memory. The operating parameters of digital OCRs are adjusted based on the available data whenever system conditions (system with distributed generation (DG)) vary. Moreover, it can reduce the calculation time required to determine the operating parameters for achieving its purpose. To verify its effectiveness, several case studies are performed in time-domain simulation. The results show that the proposed adaptive protection algorithm can keep the proper operating time and provide the protective coordination time interval with fast response.

An Experimental Study on the Thermal Performance Change of Horizontal-type Geothermal Heat Exchanger with Long-Term Operation (수평형 지열교환기 성능의 경년변화)

  • Hwang, Kwang-Il;Woo, Sang-Woo;Kim, Joong-Hun;Yang, Gi-Young;Shin, Seung-Ho
    • Proceedings of the SAREK Conference
    • /
    • 2006.06a
    • /
    • pp.725-730
    • /
    • 2006
  • The purpose of this study is on the performance evaluation of horizontally installed GHEX(Geothermal Heat Exchanger, HGHEX) which has been operated for 5 years successfully. Followings are the results. Firstly, in summer season, on Aug. 2000, $33^{\circ}C$ water was flowing out from HGHEX with continuous operating method, and $27{\sim}29^{\circ}C$ with interval operating method on Jul. 2005. But $2.5{\sim}3.0^{\circ}C$ temperature differences are gained from HGHEX. Secondly, in winter season, on Nov. 2000, $25^{\circ}C$ water was flowing out from HGHEX with continuous operating method, and $13{\sim}15^{\circ}C$ with interval operating method on Jan. 2006. But with each operating method, only $0.1^{\circ}C$ and $0.7^{\circ}C$ temperature differences are gained from HGHEX respectively. As the conclusion of this study, at the point of continuos operating method, seasonal balance of heating and cooling loads, and at the point of interval operating method, balance for geothermal restoring time respectively must be considered for better system performances.

  • PDF

Cost Analysis for Periodic Maintenance Policy with Minimal Repair (응급수리를 고려한 정기보전정책의 비용분석)

  • 김재중;김원중
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.18 no.34
    • /
    • pp.139-146
    • /
    • 1995
  • This study is concerned with cost analysis in periodic maintenance policy. Generally periodic maintenance policy in which item is repaired periodic interval times. And in the article minimal repair is considered. Minimal repair means that if a unit fails, unit is instantaneously restored to same hazard rate curve as before failure. In the paper periodic maintenance policy with minimal repair is as follows; Operating unit is periodically replaced in periodic maintenance time, if a failure occurs between minimal repair and periodic maintenance time, unit is replaced by a spate until the periodic time comes. Also unit undergoes minimal repair at failures in minimal-repair-for-failure interval. Then total expected cost per unit time is calculated according to maintenance period and scale parameter of failure distribution. Total cost factors ate included operating, fixed, minimal repair, periodic maintenance and replacement cost Numerical example is shown in which failure time of system has erlang distribution.

  • PDF

Cost Analysis Model for Periodic Maintenance Policy with Maintenance Cost Factor (보전비용요소를 고려한 정기보전정책의 비용분석모델)

  • 김재중;김원중
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.18 no.36
    • /
    • pp.287-295
    • /
    • 1995
  • This paper is concerned with cost analysis model in periodic maintenance policy. Generally periodic maintenance policy in which item is repaired periodic interval times. And in the article minimal repair is considered. Mimimal repair means that if a unit fails, unit is instantaneously restored to same hazard rate curve as before failure. In the paper periodic maintenance policy with minimal repair is as follows; Operating unit is periodically replaced in periodic maintenance time, if a failure occurs between minimal repair and periodic maintenance time, unit is replaced by a new item until tile periodic maintenance time comes. Also unit undergoes minimal repair at failures in minimal-repair-for-failure interval. Then total expected cost per unit time is calculated according to scale parameter of failure distribution. Maintenance cost factors are included operating, fixed, minimal repair, periodic maintenance and new item replacement cost. Numerical example is shown in which failure time of system has weibull distribution.

  • PDF

A Power-Aware Scheduling Algorithm by Setting Smoothing Frequencies (주파수 평활화 기법을 이용한 전력 관리 알고리즘)

  • Kweon, Hyek-Seong;Ahn, Byoung-Chul
    • Journal of the Institute of Electronics Engineers of Korea CI
    • /
    • v.45 no.1
    • /
    • pp.78-85
    • /
    • 2008
  • Most researches for power management have focused on increasing the utilization of system performance by scaling operating frequency or operating voltage. If operating frequency is changed frequently, it reduces the real system performance. To reduce power consumption, alternative approaches use the limited number of operating frequencies or set the smoothing frequencies during execution to increase the system performance, but they are not suitable for real time applications. To reduce power consumption and increase system performance for real time applications, this paper proposes a new power-aware schedule method by allocating operating frequencies and by setting smoothing frequencies. The algorithm predicts so that frequencies with continuous interval are mapped into discrete operating frequencies. The frequency smoothing reduces overheads of systems caused by changing operating frequencies frequently as well as power consumption caused by the frequency mismatch at a wide frequency interval. The simulation results show that the proposed algorithm reduces the power consumption up to 40% at maximum and 15% on average compared to the CC RT-DVS.

Factors Affecting the Postoperative Mortality in the Ruptured Abdominal Aortic Aneurysm

  • Ahn, Hyo-Yeong;Chung, Sung-Woon;Lee, Chung-Won;Kim, Min-Su;Kim, Sang-Pil;Kim, Chang-Won
    • Journal of Chest Surgery
    • /
    • v.45 no.4
    • /
    • pp.230-235
    • /
    • 2012
  • Background: Although patients with a ruptured abdominal aortic aneurysm (RAAA) often reach the hospital alive, the perioperative mortality is still very high. We retrospectively reviewed thirty patients who underwent repair of RAAA to identify the factors affecting postoperative mortality in a single hospital. Materials and Methods: Between September 2007 and May 2011, thirty patients with RAAA underwent emergent surgery (n=27) or endovascular aneurysm repair (n=3). Their medical records were retrospectively reviewed regarding three categories: 1) preoperative patient status: age, gender, vital signs, serum creatinine, blood urea nitrogen, hematocrit, and hemoglobin level: 2) aneurysmal status: size, type, and rupture status; and 3) operative factors: interval time to operating room, operative duration, and amount of perioperative transfusion. Results: The 30-day postoperative mortality rate was 13.3% (4/30); later mortality was 3.3% (1/30). On multivariate analysis, the initial diastolic blood pressure (BP), interval time to operating room and amount of preoperative packed cell transfusion were statistically significantly linked with postoperative mortality (p<0.05). Conclusion: In this study, preoperative diastolic BP, preoperative packed cell transfusion amount and interval time between arrival and entry to operating room were significantly associated with postoperative mortality. It is important to prevent hemorrhage as quickly as possible.

Analysis of Inspection Interval according to the Operating Platform of Overseas Purchase Missile (국외구매 대함유도탄의 운용 플랫폼에 따른 검사 주기 분석)

  • Hur, Jang Wan
    • Journal of Aerospace System Engineering
    • /
    • v.15 no.1
    • /
    • pp.63-71
    • /
    • 2021
  • The South Korean Navy has operated Harpoon guided missiles through step-by-step acquisition after adopting them for the first time in 1978. As Harpoon guided missiles have been operated for a long time, it is necessary to make an active follow-up logistics support to guarantee their performance. Inspection of guided missiles is a basic activity to check the status of missiles. This study was conducted to check if the existing inspection interval of Harpoon guided missiles that have been operated for a long time was appropriate. Regarding research methods, based on the Navy's field operation materials, this study analyzed and presented inspection interval by section according to the period of operation, utilizing the Martinez's theory and a non-parametric MCF technique.

A Group Maintenance Model with Extended Operating Horizon (연장된 운용기간을 활용하는 그룹보전모형)

  • Yoo, Young-Kwan
    • Journal of the Korea Safety Management & Science
    • /
    • v.19 no.3
    • /
    • pp.89-95
    • /
    • 2017
  • This paper presents another maintenance policy for a group of units under finite operating horizon. A group of identical units are subject to random failures. Group maintenances are performed to all units together at specified intervals, and the failed units during operation are remained idle until the next group maintenance set-up. Unlike the traditional assumption of infinite operating horizon, we adopt the assumption of the finite operating horizon which reflect the rapid industrial advance and short life cycle of modern times. The units are under operation until the end of the operating horizon. Further, the operation of units are extended to the first group maintenance time after the end of the horizon. The total cost under the proposed maintenance policy is derived. The optimal group maintenance interval and the expected number of group maintenances during the horizon are found. It is shown that the proposed policy is better than the classical group maintenance policy in terms of total cost over the operating horizon. Numerical examples are presented for illustrations.

Development of a Flow Compensating Boom Sprayer for the Speed Variation (주행속도 보상형 붐방제기의 개발)

  • 구영모;정재은
    • Journal of Biosystems Engineering
    • /
    • v.23 no.3
    • /
    • pp.211-218
    • /
    • 1998
  • A variable flow-controlled boom sprayer was developed and evaluated. Field tests were conducted to evaluate the adoptability of the sprayerr with optimal conditions. Negative response time was obtained from the field test because pump and PTO were interlocked with the speed of sprayer. Another reason for the negative value was due to the definition of the response time. With constant on-time control, the system was unstable at the conditions of small tolerance and long control interval. The performances of the spray system were stable and accurate. The stable and synchronous responses were achieved with a variable on-time control. The flow control system with an optimal condition (1.0 sec of control interval, 2 of damping ratio, 1% of tolerance) provided the proper performance for uniform spraying. A standard operating procedure of the flow compensating boom sprayer for the ground speed variation was presented and recommended.

  • PDF

Development of On-line Life Monitoring System Software for High-temperature Components of Power Boilers (보일러 고온요소의 수명 감시시스템 소프트웨어 개발)

  • 윤필기;정동관;윤기봉
    • Proceedings of the Korea Society for Energy Engineering kosee Conference
    • /
    • 1999.05a
    • /
    • pp.171-176
    • /
    • 1999
  • Nondestructive inspection and accompanying life analysis based on fracture mechanics were the major conventional methods for evaluating remaining life of critical high temperature components in power plants. By using these conventional methods, it has been difficult to perform in-service inspection for life prediction. Also, quantitative damage evaluation due to unexpected abrupt changes in operating temperature was almost impossible. Thus, many efforts have been made for evaluating remaining life during operation of the plants and predicting real-time life usage values based on the shape of structures, operating history, and material properties. In this study, a core software for on-line life monitoring system which carries out real-time life evaluation of a critical component in power boiler(high temperature steam headers) is developed. The software is capable of evaluating creep and fatigue life usage from the real-time stress data calculated by using temperature/stress transfer Green functions derived for the specific headers and by counting transient cycles. The major benefits of the developed software lie in determining future operating schedule, inspection interval, and replacement plan by monitoring real-time life usage based on prior operating history.

  • PDF