1 |
Park, K., and Yoo, Y. (2004), 'Comparison of group replacement policies under minimal repair', International Journal of Systems Science, 35:179-184.
DOI
|
2 |
Cox, D., (1962), Renewal Theory, London, Methuen.
|
3 |
Yoo, Y., (2011), "Operating characteristics of a failure counting group replacement policy", International Journal of Systems Science, 42(3):499-506.
DOI
|
4 |
Popova, E. and Wilson, J., (1999), "Group replacement policies for parallel systems whose components have phase distributed failure times", Annals of Operations Research, 91:163-189.
DOI
|
5 |
Ross, S., (1983), Stochastic Processes, New York, John Wiley & Sons.
|
6 |
Wells, C. and Bryant, J., (1985), "Optimal preventive maintenance policies for systems with missions of random duration", IIE Transactions, 17:338-345.
DOI
|
7 |
Legat, V., Zaludova, A., Cervenka, V., and Jurca, V., (1996), "Contribution to optimization of preventive replacement", Reliability Engineering and System Safety, 51:259-266.
DOI
|
8 |
Jiang, R., (2009), "An accurate approximate solution of optimal sequential age replacement policy for a finite-time horizon", Reliability Engineering and System Safety, 94:1245-1250.
DOI
|
9 |
Nakagawa, T. and Mizutani, S., (2009), "A summary of maintenance policies for a finite interval", Reliability Engineering and System Safety, 94:89-96.
DOI
|
10 |
Yun, W. and Chung, H., (2000), "Optimum replacement intervals with random time horizon", Journal of Quality in Maintenance Engineering, 6:269-274.
DOI
|
11 |
Khatab, A., Rezg, N., and Ait-Kadi, D., (2011), "Optimal replacement with minimal repair policy for a system operating over a random time horizon", Journal of Quality in Maintenance Engineering, 17:415-423.
DOI
|
12 |
Khatab, A., Rezg, N., and Ait-Kadi, D., (2011), "Optimum block replacement policy over a random time horizon", Journal of Intelligent Manufacturing, 22(6):885-889.
DOI
|
13 |
Yoo, Y., (2016), "Optimal minimal repair policy under finite and random time horizon", Journal of the Korean Institute of Plant Engineering, 21(4):39-45.
|
14 |
Yoo, Y., (2016), "Extended block replacement model operating over a random time horizon", Journal of the Korea Management Engineers Society, 21(4):61-69.
|
15 |
Yoo, Y., (2017), "Optimum group maintenance policy with finite operating horizon", Submitted to Journal of the Korean Institute of Plant Engineering
|
16 |
Barlow, R. and Proschan, F., (1965), Mathematical Theory of Reliability, New York, Wiley.
|
17 |
Barlow, R., and Hunter, L., (1960) "Optimum preventive maintenance policies", Operations Research, 8:90-100.
DOI
|
18 |
Wang, H., (2002), "A survey of maintenance policies of deteriorating systems", European Journal of Operational Research. 139:469-489.
DOI
|
19 |
Cho, D. and Parlar, M., (1991), "A survey of maintenance models for multi-unit systems", European Journal of Operational Research, 51:1-23.
DOI
|
20 |
Okumoto, K. and Elsayed, E., (1983), "An optimum group maintenance policy", Naval Research Logistics Quarterly, 30:667-674.
DOI
|
21 |
Assaf, D., and Shanthikumar, J.G. (1987), 'Optimal group maintenance policies with continuous and periodic inspections', Management Science, 33:1440-1452.
DOI
|
22 |
Ritchken, P. and Wilson, J., (1990), "(m,T) Group maintenance policies", Management Science, 36:632-639.
DOI
|
23 |
Sheu, S., and Jhang, J. (1996), 'A generalized group maintenance policy', European Journal of Operational Research, 96:232-247.
|