A Study on Normal Project Duration for Water Resource Project (수자원시설 건설공사 표준공기 산정을 위한 기초연구)

  • Lee, Bongsu;Kim, Kinam;Lee, Minjae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.1
    • /
    • pp.35-43
    • /
    • 2015
  • It is important to have enough design and construction duration for infrastructure projects. However, recent water resource project in Korea shows several problems caused by their fast-tract schedule. National Audit Committee report several water resource projects have quality problems caused by insufficient project duration. Especially, water resource projects such as dam and water pipeline construction should have proper time to secure their structure quality. Normal project duration for these projects should be estimated based on previous similar projects' historical data analysis. However there is no standard model which can estimate normal project duration for water resource projects in Korea. There are several normal project duration estimation models for building project developed by public(LH) and private construction companies. However, there is no proper model for water resource projects. So, this study developed normal project duration model for dam and water pipeline projects using historical data and show application of models.

Time Shortening of Structural Framework of High-rise Apartment Housing for the Urgent Project Area: Focused on the Cases of Insufficient Time or Delayed Projects

  • Bang, Jong-Dae;Lee, Do-Heun;Chun, Young-Soo;Park, Ji-Young;Lee, Bum-Sik;Jun, Myoung-Hoon
    • Land and Housing Review
    • /
    • v.2 no.4
    • /
    • pp.355-365
    • /
    • 2011
  • Construction duration is very important as a factor which comprises three axises of construction management with quality and cost in construction project. In general project condition, construction duration is optimized while minimizing construction cost and securing required quality. However, in case of insufficient project time duration or delayed projects, project progress management is different from those of normal projects. These project areas need solutions to complete work within a given completion day. To time shortening the current duration of each typical floor of structural framework in apartment construction is investigated, and a basic time schedule planning for typical floor of structural framework in normal projects is planned. This study proposed 3 ways for time shortening of urgent project or insufficient construction duration project. Also, This study proposed detailed time shortening method and technical solution conditions while time is shortened.

A Study on Estimating Normal Project Duration of Apartment Remodeling Project (공동주택 리모델링공사 표준공기 설정에 관한 연구)

  • Yoon, Jongsik;Yu, Ilhan
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.2
    • /
    • pp.12-20
    • /
    • 2017
  • The biggest reason to prefer the remodeling is a relatively short period of time (5~6 years) compared to the reconstruction work that takes 8~9 years. In addition, from the perspective that the period of temporary residence is usually 24 months, the necessity of shortening is greater. Also, since the remodeling construction period is approximately 28~35 months on average, the strategies and efforts are needed to make up for the shortening the remodeling construction period. For these reasons, this paper is to develop an estimating model for normal project duration of apartment remodeling project. This model is reflected in the remodeling properties thorugh difference analysis of the new apartment construction project. Demolition works, reinforcement works, extension works are different, so this paper newly defines these construction work's duration in normal project duraion of remodeling. Case study and experts interviews are used to validate normal project duration. This model can be used to calculate rough construction period each alternatives, and will help a strategic decision making among the stakeholders.

A study on the normal project duration development for the construction of multi-utility tunnel in the existing city (기존시가지의 공동구 건설을 위한 표준공기 산정에 대한 연구)

  • Lee, Seong-Won;Lee, Pil-Yoon;Byun, Yo-Seph;Cho, Choong-Yeun;Lee, Min-jae
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.12
    • /
    • pp.677-685
    • /
    • 2018
  • In construction, schedule management is the basic but important step, for the effective schedule management, the preparation of the reasonable schedule table should be prioritized. In the design stage, the optimal construction period can be selected through comparison of various conditions and construction methods considering weather conditions and site characteristics. But, At the planning phase, it is difficult to select the effective method and calculate the proper construction period by the basic data(D/B) analysis. In this paper, the construction method considering characteristics of each type and conditions of existing city was selected. For the reasonable duration calculation, we analyzed the unit schedule for RC method for open type and Shield TBM method for tunnel type. The normal project duration of construction assuming of 1,200m of extension and every 200m of ventilation was prepared by integrating each unit schedule. It was analyzed that it took 893 days for the open type and 616 days for the tunnel type. The results of this study will help to make type selection and normal project duration more easily in the planning phase. If it is linked to the design stage, it will be easy to estimate the process and construction cost.

The Neuromodulation of Neuropathic Pain by Measuring Pain Response Rate and Pain Response Duration in Animal

  • Kim, Jinhyung;Lee, Sung Eun;Shin, Jaewoo;Jung, Hyun Ho;Kim, Sung June;Chang, Jin Woo
    • Journal of Korean Neurosurgical Society
    • /
    • v.57 no.1
    • /
    • pp.6-11
    • /
    • 2015
  • Objective : Neuropathic pain causes patients feel indescribable pain. Deep Brain Stimulation (DBS) is one of the treatment methods in neuropathic pain but the action mechanism is still unclear. To study the effect and mechanism of analgesic effects from DBS in neuropathic pain and to enhance the analgesic effect of DBS, we stimulated the ventral posterolateral nucleus (VPL) in rats. Methods : To observe the effect from VPL stimulation, we established 3 groups : normal group (Normal group), neuropathic pain group (Pain group) and neuropathic pain+DBS group (DBS group). Rats in DBS group subjected to electrical stimulation and the target is VPL. Results : We observed the behavioral changes by DBS in VPL (VPL-DBS) on neuropathic pain rats. In our study, the pain score which is by conventional test method was effectively decreased. In specific, the time of showing withdrawal response from painful stimulation which is not used measuring method in our animal model was also decreased by DBS. Conclusion : The VPL is an effective target on pain modulation. Specifically we could demonstrate changes of pain response duration which is not used, and it was also significantly meaningful. We thought that this study would be helpful in understanding the relation between VPL-DBS and neuropathic pain.

A Study on Determination of Probability Rainfall-Depth of Short Duration as Consideringthe Project Life and the Factor of Safety in Seoul (내용 안전치를 고려한 서울지방의 단시간 확률 강우량산정에 관한 연구)

  • 이원환;김재한;김채원
    • Water for future
    • /
    • v.9 no.1
    • /
    • pp.101-105
    • /
    • 1976
  • This Study is developed in order to determine the probability of a raintall depth of short duration in Seoul as considering the profect life and the factor of safety of hydraulic structures. The raw annual maximum rainfall data are selected from 1915 to 1974 about short duration (10min-120min.) in Seoul. The selected data are treated by frequency analysis, and the hypothesis that the distribution fuction of the raw data is normal Distribution is performed by chi-square test that signifcance level has 5%. With the parameters (mean and standard deviation) of the accepted distribution function, the probabilitn of a rainfall depth can be easily determined on the graph which is made on this paper.

  • PDF

Probability Distribution of Project Completion Times in Simulation based Scheduling (시뮬레이션 일정기법;최종공사기간의 확률 통계적 특성 추정)

  • Lee, Dong-Eun;Kim, Ryul-Hee
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.327-330
    • /
    • 2007
  • This paper verifies that the normality assumption that the simulation output data, Project Completion Times (PCTs), follow normal distribution is not always acceptable and the existing belief may lead to misleading results. A risk quantification method, which measures the effect caused by the assumption, relative to the probability distribution of PCTs is implemented as an algorithm in MATLAB. To validate the reliability of the quantification, several series of simulation experiments have been carried out to analyze a set of simulation output data which are obtained from different type of Probability Distribution Function (PDF) assigned to activities'duration in a network. The method facilitates to find the effect of PDF type and its parameters. The procedure necessary for performing the risk quantification method is described in detail along with the findings. This paper contributes to improving the reliability of simulation based scheduling method, as well as increasing the accuracy of analysis results.

  • PDF

Complete Time Algorithm for Stadium Construction Scheduling Problem

  • Lee, Sang-Un
    • Journal of the Korea Society of Computer and Information
    • /
    • v.20 no.9
    • /
    • pp.81-86
    • /
    • 2015
  • This paper suggests heuristic algorithm with linear time complexity to decide the normal and optimal point at minimum loss/maximum profit maximum shortest scheduling problem with additional loss cost and bonus profit cost. This algorithm computes only the earliest ending time for each node. Therefore, this algorithm can be get the critical path and project duration within O(n) time complexity and reduces the five steps of critical path method to one step. The proposed algorithm can be show the result more visually than linear programming and critical path method. For real experimental data, the proposed algorithm obtains the same solution as linear programming more quickly.

A Study on Factors Influencing Pregnancy in the Pilot Project for Korean Medical Treatment for Subfertility (한방 난임 치료 시범사업에 참가한 여성의 임신 성공에 영향을 미치는 요인에 관한 연구)

  • Ahn, In-Suk;Kim, Dong-Il;Choi, Min-Sun;Jang, Suk-Woo;Jeong, Jae-Cheol
    • The Journal of Korean Obstetrics and Gynecology
    • /
    • v.26 no.3
    • /
    • pp.73-84
    • /
    • 2013
  • Objectives: This study aims to identify associated factors in female infertility treatment using herbal medicine, acupuncture and moxibustion. Methods: Acupuncture and moxibustion treatments were performed with intake of herbal medicines (Jokyungjongoktanggagam-bang, Sutaehwangagam-bang) for six menstrual cycles in 32 subfertile women. The variables selected for initial analysis were age, duration and type of infertility, frequency of previous In Vitro Fertilization (IVF) and live births, weekly frequency of sexual intercourse, number of treatment cycles, endometrial thickness on MCD15 and hormonal parameter (anti-mullerian hormone, follicle-stimulating hormone, luteinizing hormone, estrone). Results: Six patients became pregnant (18.75%) and seven patients withdrew. Factors influenced pregnancy were age (${\leq}35$ years), a shorter duration of infertility (<6 years), frequency of IVF (${\leq}3$), anti-mullerian hormone level (>1 ng/ml), and number of treatment cycles(${\leq}3$ cycles). Conclusions: Korean medicine is a useful and optimized treatment option for women with younger age, fewer previous IVF cycles, shorter infertile duration and normal anti-mullerian hormone level at first 3 cycles of treatment.

A Study on Considering Non-Working Days for Determination Normal Project Duration in the Railway Bridgework Construction (철도 교량공사의 적정공사기간 산정을 위한 비작업일 산정에 관한 연구)

  • Chae, Su Min;Lee, Sang Hyuck;Park, Hyung Keun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.41 no.5
    • /
    • pp.601-608
    • /
    • 2021
  • Recently, despite a decrease in the number of working days and an increase in the number of non-working days due to an increase in the abnormal climate and the revision of the Labor Standards Act, a standard construction period reflecting this has not been established. For this reason, even if the appropriate construction period is calculated at the site, there is a situation where delays occur due to unexpected circumstances. Therefore, this study proposes a method of calculating the number of non-working days for railway bridgework construction that reflects changes in construction conditions and climate change and reflects this to railway bridgework construction, and the number of working days was calculated. As a result, the number of non-working days by region and month in Korea was derived, and through this, the necessity of regulations and standards for appropriate construction periods reflecting regional characteristics and characteristics of each construction type was presented.