References
- An, S.H., G. Kim, J. Kim, H. Park and B. Jung (2007), "A Study on 3-Day Cycle Time for Reducing the Duration of Structural Frame Work", Journal of Korea Architectural Institute, 23(5).
- Han, C.H and J. Bang (2004), "Development of an Effective Time Scheduling Mechanism of the Structural Framework for the High-rise Apartment Housing", Journal of Korea Construction Engineering and Management, 5(4): 88-90.
- Jung, J.H., G. Lee, G. Hong and C. Lee (2010), "An Analysis on Difficulties and Delay Factors for the Development and Application of Technologies of Construction Duration", Journal of Korea Architectural Institute, 26(1).
- Jung, Y.H., J. Lee, Y. Kim, K. Keum, W. Lee and S. Kim (2010), "A study on the Practical Application of Early Strength Concrete for Reduction of Working Period in Apartment", Korea Concrete Institute 2010 Spring Conference Proceedings.
- Kim, D.W., S. Park, H. Lee and M. Park (2005), "A Framework System for Reducing the Construction Duration of the Wall Systems Buildings", Korea Architectural Institute the 60th anniversary of the founding Conference Proceedings.
- Kim, K.H., M. Park, H. Lee, S. Park and S. Joo (2007), "An Assessment of Field Application of Elementary Technology for Reducing Construction Duration in the Apartment Housing Construction", Journal of Korea Construction Engineering and Management.
- Kim, M.J., D. Kim and S. Lee (2009), "A Study on Field Application of Early Strength Concrete for Construction Work Period Reduction", Korea Concrete Institute 2009 Spring Conference Proceedings.
- Kwon, B.K., H. Lee, M. Park and S. Joo (2008), "Structural Plan for Construction Schedule of Residential Buildings", Korea Construction Engineering and Management Institute National University Students Conference Proceedings.
- Lee, W.J., K. Keum, J. Lee, Y. Jung and Y. Kim (2010), "Evaluation of Field Application on the Prediction Method of Early-age Strength of Early Concrete for Construction Work Period Reduction", Korea Concrete Institute 2010 Spring Conference Proceedings.
Cited by
- Effects of Time Shortening on Project Cost in Housing Complex with Different Number of Layers vol.3, pp.4, 2012, https://doi.org/10.5804/LHIJ.2012.3.4.415