Time Shortening of Structural Framework of High-rise Apartment Housing for the Urgent Project Area: Focused on the Cases of Insufficient Time or Delayed Projects

  • Received : 2011.08.26
  • Accepted : 2011.10.19
  • Published : 2011.10.30

Abstract

Construction duration is very important as a factor which comprises three axises of construction management with quality and cost in construction project. In general project condition, construction duration is optimized while minimizing construction cost and securing required quality. However, in case of insufficient project time duration or delayed projects, project progress management is different from those of normal projects. These project areas need solutions to complete work within a given completion day. To time shortening the current duration of each typical floor of structural framework in apartment construction is investigated, and a basic time schedule planning for typical floor of structural framework in normal projects is planned. This study proposed 3 ways for time shortening of urgent project or insufficient construction duration project. Also, This study proposed detailed time shortening method and technical solution conditions while time is shortened.

Keywords

References

  1. An, S.H., G. Kim, J. Kim, H. Park and B. Jung (2007), "A Study on 3-Day Cycle Time for Reducing the Duration of Structural Frame Work", Journal of Korea Architectural Institute, 23(5).
  2. Han, C.H and J. Bang (2004), "Development of an Effective Time Scheduling Mechanism of the Structural Framework for the High-rise Apartment Housing", Journal of Korea Construction Engineering and Management, 5(4): 88-90.
  3. Jung, J.H., G. Lee, G. Hong and C. Lee (2010), "An Analysis on Difficulties and Delay Factors for the Development and Application of Technologies of Construction Duration", Journal of Korea Architectural Institute, 26(1).
  4. Jung, Y.H., J. Lee, Y. Kim, K. Keum, W. Lee and S. Kim (2010), "A study on the Practical Application of Early Strength Concrete for Reduction of Working Period in Apartment", Korea Concrete Institute 2010 Spring Conference Proceedings.
  5. Kim, D.W., S. Park, H. Lee and M. Park (2005), "A Framework System for Reducing the Construction Duration of the Wall Systems Buildings", Korea Architectural Institute the 60th anniversary of the founding Conference Proceedings.
  6. Kim, K.H., M. Park, H. Lee, S. Park and S. Joo (2007), "An Assessment of Field Application of Elementary Technology for Reducing Construction Duration in the Apartment Housing Construction", Journal of Korea Construction Engineering and Management.
  7. Kim, M.J., D. Kim and S. Lee (2009), "A Study on Field Application of Early Strength Concrete for Construction Work Period Reduction", Korea Concrete Institute 2009 Spring Conference Proceedings.
  8. Kwon, B.K., H. Lee, M. Park and S. Joo (2008), "Structural Plan for Construction Schedule of Residential Buildings", Korea Construction Engineering and Management Institute National University Students Conference Proceedings.
  9. Lee, W.J., K. Keum, J. Lee, Y. Jung and Y. Kim (2010), "Evaluation of Field Application on the Prediction Method of Early-age Strength of Early Concrete for Construction Work Period Reduction", Korea Concrete Institute 2010 Spring Conference Proceedings.

Cited by

  1. Effects of Time Shortening on Project Cost in Housing Complex with Different Number of Layers vol.3, pp.4, 2012, https://doi.org/10.5804/LHIJ.2012.3.4.415