The main purpose of this study is to define antecedents that influence e-SCM synchronization and to investigate how it affects e-SCM performance. We, therefore, investigate (1) the impact of firms' internal IT planning capabilities on e-SCM synchronization and on SCM process management capability, (2) the impact of firms' internal IT infrastructure on e-SCM synchronization and on SCM process management capability, (3) the impact of firms' internal SCM process management capabilities on e-SCM synchronization, and finally (4) the impact of e-SCM synchronization on SCM performance. A survey has been administrated to the firms' SCM and marketing staffs and 171 returns analyzed. The results show that (1) IT plan has not direct impacts on e-SCM synchronization, but has direct impacts on organizational support, purchasing, and operations processes except logistics process. IT plan, however, has indirect impacts on e-SCM synchronization through purchasing and operations of SCM process management capability. (2) IT infrastructure has both direct and indirect effects on e-SCM synchronization, and also has direct impacts on organizational support, purchasing, and operations processes except logistics process. (3) SCM process management capabilities have direct impacts on e-SCM synchronization. Among these SCM core processes purchasing positively influences operations, which in turn positively influences logistics process management capability. (4) e-SCM synchronization has positive impacts on SCM performance indicator (SCOR), such as delivery reliability, responsiveness & flexibility, and cost. These results indicate that e-SCM synchronization can be critical to achieve better internal performance like cost and external performance like delivery reliability, responsiveness & flexibility of firms' SCM. In sum, this study demonstrates that the intervening role of e-SCM synchronization between e-SCM performance and IT management capability and between e-SCM performance and SCM core process management capability has been significant in achieving better e-SCM performance. Therefore, it can be suggested that e-SCM performance should be accomplished in consequence of the acceleration of e-SCM synchronization through the enhancement of preceding factors for the e-SCM synchronization.
Purpose: It is to present the development direction of the overall 'disaster management implementation process' (tentative name) for the establishment of an effective 'safety management plan' by the government and local governments. Method: To this end, prior research on the 'safety management plan' was reviewed to derive common problems, and the direction of development was suggested by incorporating the 'disaster management execution process' (tentative name) that can solve these problems with the military's 'operational execution process'. Result: Common problems of previous studies can be supplemented through the 'disaster management performance process' (tentative name) presented by this researcher. Conclusion: Through the "disaster management implementation process" (tentative name), the government's basic ideology of disaster management can be finally achieved, "confirming that it is a basic mission of the state and local governments and allowing the people to live in a society that is safe from disasters."
This paper is about how to drive a Business Process Management(BPM) implementation project from selecting a target process to BPM deployment. For guidance of BPM implementation, LG CNS BPM Methodology and enPAM(Entrue Process Assessment Model) were used. This paper focuses on the methodology of process selection and presents a case study from the telecommunication industry. The enPAM consists of three major criteria in determining process priority for BPM system deployment: business impact, BPM adequateness and implementation feasibility. These three criteria can be easily modified for other telecommunication business just as we did to suit this telecom case. Moreover, it could provide useful ideas to companies that consider introducing a BPM solution for process management. Although we propose a comprehensive design methodology for selecting a proper target business process for BPM implementation, more work is still needed to extend the results for rigorous and practical method.
Enterprise Risk Management(ERM) is aiming at the establishment of the risk management process to prevent and cope with risks in advance and is composed of Risk Identification, Risk Assessment, Risk Response and Monitoring. It is feedback through the Risk Re-identification. This study has analysed a sample of the risk management system of an airport operating corporation, for this purpose, relevant documents and examples of overseas airports have been reviewed. It has found that corporations establishing ERM have been performing identical procedures such as the process of Identification, Assessment, Effective Reporting, Communication and monitoring and so on. The A corporation has established the process for risk management and crisis management and organized for its organization and system. The risk management has the same process such as above. In this process, when the symptoms of critical crisis have been recognized, it has been transformed into crisis management system, through which, corporate-wide response has been conducted in the process of crisis status analysis, response and follow-up management. This study expects to contribute to systematic foundation for future business continuity on the basis of risks and response procedures acknowledged by this study.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
2007.11a
/
pp.892-898
/
2007
This study aims to implement an efficient process management system for small and medium sized(local) construction companies and a performance management system for the Korean construction industry. The process management system by Lean Construction is Web 2.0 platform-based and creates clusters with numerous general contractors and sub-contractors, which will enable mutually organic process management. Plus, this system will enable them to compare project performance management by analyzing it during or after a project by collecting and accumulating lots of data occurring in pursuit of a project. These performance management cases will be of help in process planning during similar upcoming projects. This study is expected to somewhat reduce the burden of implementing a complicated process management protocol and system that Korean small and medium sized (local) construction companies experience with their web-based process management, and is supposed to realize accurate performance management with highly reliable data which are significantly accumulated within the database.
Recently, construction industry has been magnified while various cooperative relationship makes steady process. So importance of management during construction is gathering strength. Therefore, we need systematic management gradually. But almost management of construction industry that performs these day is focused on construction phase not design phase. The purpose of the present study is to find the effective way of design management with enhancing the process of design phase.
Proceedings of the Korean Institute of Building Construction Conference
/
2023.11a
/
pp.95-96
/
2023
The purpose of this study is to derive the limitations of the existing management system by analyzing the characteristics of the PC process to improve the PC construction project management system process. To overcome the limitations derived, we present a process of managing integrated information from the design-production-construction stage using QR codes and clouds. This is expected to help develop a PC construction project management system.
The Purpose of this study is to identify relationships between knowledge management performances and such Influence factors of knowledge Management as information technology, knowledge management process, culture & people, strategy & Leadership in Small and Medium-sized Enterprises. In order to test hypotheses, we collected data from 498 SME's employees, then analysed them by SPSSWIN. This results showed as follows; 1. All Influence factors of knowledge Management( information technology, knowledge management process, culture & people, strategy & Leadership) are to advance individual task effectiveness and organization effectiveness significantly. 2. Such Influence factors of knowledge Management as information technology, knowledge management process, culture & people are to improve business efficiency between the company. But strategy & leadership factor is not significant. 3. Influence factors of knowledge Management are different between knowledge performace factors such ac individual task effectiveness, organization effectiveness, and business efficiency between company.
Kim, Jong-Guk;Kim, Kil-Hwan;Son, Chul-Min;Kim, Chang-Eun
Journal of the Korea Safety Management & Science
/
v.13
no.4
/
pp.153-160
/
2011
This thesis introduced a model of diagnosing a company's quality management, and a process of achieving quality innovation based on the model. As for study methods, books and theses related to quality and process innovation were collected for investigation, a survey on internal employees to investigate major issues of quality and standard consciousness was conducted, and 5DP was discussed for balanced process analysis.
Kim, Sang-Kuk;Shin, Sung-Ho;Lee, Young-Sei;Chung, Taek-Young
Journal of Korean Society for Quality Management
/
v.33
no.2
/
pp.13-21
/
2005
Most organizations adopt a process-based approach to manage their operations and now business process management(BPM) is a well-established concept. Because ISO 9001:2000 has been influenced by BPR and it also emphasizes process based, BPM can get together with ISO 9001:2000. Korea Institute of Science and Technology Information has taken ISO 9001:2000 certificate in November 11, 2003 and now implements quality management systems based on BPMS. We call it KQMS(KISTI Quality Management System). KQMS based on BPMS is a new example in field of ISO quality management and is expected to support process management well.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.