• Title/Summary/Keyword: Maintenance monitoring

Search Result 1,326, Processing Time 0.025 seconds

Case Study on Technology and Regulation Improvement of Subway Maintenance Monitoring (지하철 유지관리 계측의 기술 및 제도 개선방안 연구)

  • 우종태;김홍석
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2000.03b
    • /
    • pp.303-308
    • /
    • 2000
  • By means of analyzing of monitoring technology and monitoring regulation based on maintenance monitoring system installed in subway tunnel section, it needs monitoring system, development of operating program, monitoring analyzing system and development of analysis method, establishment of maintenance monitoring standard specification, and performance of responsible monitoring supervision for applying to subway monitoring maintenance effectively in future. It requires specialized monitoring and legislation of monitoring subcontract, improvement of monitoring work contract method, establishment the standard payment of monitoring, and effective calibration and correction of monitoring system in the plan of improving monitoring regulation.

  • PDF

Analysis for the Problem and Improvement of Maintenance Monitoring in Subway Tunnel (지하철 터널에서 유지관리계측의 문제점 분석 및 개선방안)

  • Woo, Jong-Tae;Kim, Jong-Soo;Lee, Song
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.5 no.4
    • /
    • pp.161-167
    • /
    • 2001
  • By means of analyzing the problems in monitoring plan, design, installation, operation based on maintenance monitoring system installed in subway tunnel section, the improved methods of were proposed for applying to subway monitoring maintenance effectively in the future. The choice of the better monitoring system, the operating method of monitoring system, the confidence and continuity of maintenance monitoring, the performance of responsible monitoring supervision in the phase of the planning of monitoring and design were proposed. The problem and developed plan in the different monitoring systems, the calibration and correction of monitoring system, the analysis for the results and plan for maintenance in the phase of installation of monitoring system and operation were also proposed.

  • PDF

Case Study on Analysis the Problem and Improvement of Subway Maintenance Monitoring (지하철 유지관리 계측의 문제점 분석 및 개선방안 연구)

  • 우종태;김홍석
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2000.03c
    • /
    • pp.93-104
    • /
    • 2000
  • By means of analyzing the problems in monitoring plan, design, installation, operation based on maintenance monitoring system installed in subway tunnel section, the methods of improvement were proposed for applying to subway monitoring maintenance effectively in future. The choice of the better monitoring system, the operating method of monitoring system, the confidence and continuity of maintenance monitoring, the performance of responsible monitoring supervision in the phase of the planning of monitoring and design were proposed. The problem and developed plan in the different monitoring systems, the calibration and correction of monitoring system, the analysis for the results and plan for maintenance in the phase of installation of monitoring system and operation were also proposed.

  • PDF

A Safety Analysis of Tunnel Lining for Monitoring (계측에 의한 터널 라이닝의 안전성 분석)

  • Woo, Jong-Tae;Lee, Song
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.6 no.3
    • /
    • pp.103-110
    • /
    • 2002
  • Maintenance monitoring of the tunnel which offers continuous data during and after tunneling has been applying to tunnels in order to meet the maintenance of tunnel and to confirm continuous security of the tunnel after tunneling. But, the maintenance monitoring of tunnel results for long period is not easy to find, and moreover, the rational analysis method on tunnel monitoring has not been established yet. In this study, the relationships between displacement and stress of the tunnel concrete lining using various analysis methods are compared with maintenance monitoring. The tunnel behavior were measured in the subway tunnel passing comparative soft the weathering and analyzed both security and mechanical characteristics of the tunnel concrete lining. Also, analyzed relationship between residual water pressure applied on tunnel design and one obtained by monitoring.

A Case Study for Quality Confirmation and Maintenance Monitoring of Tunnel Underpassing the Han River (하저터널 품질확인 및 유지관리 계측 연구)

  • Woo, Jong Tae;Yang, Tae Seon;Koo, Jai Dong
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.2 no.2
    • /
    • pp.185-194
    • /
    • 1998
  • This paper shows a case study on quality confirmation and maintenance monitoring of the tunnel underpassing the Han River. First of all, when it comes to the quality confirmation, soil investigation techniques and shotcrete core test will be improved. On the construction stages, quality control procedures are needed. Second, on the maintenance monitoring, it is the main tool to control stability and safety of the tunnel structures throughout the construction period. On the geotechnical monitoring instrumentation, some considerations such as installation of monitoring sections in time, immediate base readings, adequate reading frequency, etc - shall be improved.

  • PDF

Stress Analysis of Tunnel Concrete Lining for Maintenance Monitoring (유지관리 계측에 의한 터널 콘크리트 라이닝의 응력 분석)

  • Woo, Jong-Tae;Lee, Song
    • Journal of the Korea Concrete Institute
    • /
    • v.14 no.3
    • /
    • pp.341-348
    • /
    • 2002
  • The purpose of maintenance monitoring is to offer the objective and continuous data in order to be lasting security affirmation and best fitted maintenance of tunnel structure. Though recently the examples of maintenance monitoring which Is applied to tunnel are rapidly increasing, long-term measured monitoring actual results and rationally analysis method researches are wholly lacking. In this study, it is analyzed that the relationship of stress and reinforcement stress of concrete lining, i.e., last support materials of tunnel through regression analysis based on the monitoring result of the subway tunnel, which was accomplished the monitoring for long period, passing the weathering. Also, through the analysis of the stress and the safety of concrete lining, it is estimated that the frequency of maintenance monitoring and the in-situ application of the criteria value of management.

Study of Performance Criteria Methodology for Maintenance Effectiveness Monitoring Program for Nuclear Power Plants (원전 정비효과성감시 프로그램의 성능기준설정 방법론 개선)

  • Song, Tae-Young;Yeom, Dong-Un;Hyun, Jin-Woo
    • Transactions of the Korean Society of Pressure Vessels and Piping
    • /
    • v.8 no.2
    • /
    • pp.26-32
    • /
    • 2012
  • The systems of the nuclear power plant are designed based on the User Requirement Document, and Korea Hydro & Nuclear Power Co. (KHNP) implements preventive maintenance activities to keep the specific design function of the system consistently. To monitor the preventive maintenance effectiveness, KHNP has also developed maintenance effectiveness monitoring (MR) program based on NUMARC 93-01 since 2003, and has implemented the program in all operating plants. Recently, KHNP has upgraded MR programs by reflecting implementing experiences ; reestablishing the performance monitoring level, improving analysis for standby function and performance criteria for passive components, reestablishing the availability performance criteria and the performance criteria for the same type of components. These upgraded MR programs will contribute to enhance safety and improve equipment reliability through monitoring maintenance effectiveness.

Improvement of Domestic Design Criteria of Tunnel Maintenance Monitoring and Latest Technology Trend (터널 유지관리 계측의 국내설계기준 개선 및 최신 기술동향)

  • Baek, Kyung Jong;Kwon, Young Eok
    • Journal of Korean Society of Disaster and Security
    • /
    • v.7 no.2
    • /
    • pp.9-16
    • /
    • 2014
  • Though the maintenance monitoring of structurally weak parts of the tunnel structure in public service must be judged in connection with the monitoring during the construction period for analysis of the behavior of the ground and surrounding structures following the tunnel excavation for the effective management, the monitoring during the construction period and the maintenance monitoring are implemented separately on the basis of the periods of construction and maintenance, so the connectivity and systematic management of the related data are mostly inadequate. The improvement direction is suggested in this thesis, by analyzing the problems of tunnel monitoring in the domestic design criteria. And, it is anticipated that from now on the use of hi-tech sensors and wireless communications technology will proceed vigorously in the maintenance, so considering these situations, the development and application of the maintenance monitoring system and the revision of the domestic design criteria and specification are needed in the future.

A Study on the Improvement Plans of Maintenance Monitoring in Tunnel Structure (터널구조물 유지관리계측의 개선방안 연구)

  • Woo, Jong-Tae
    • Journal of the Society of Disaster Information
    • /
    • v.16 no.1
    • /
    • pp.10-20
    • /
    • 2020
  • Purpose: Analyze the results of on-site inspection of the tunnel structure maintenance management monitoring and suggest improvement plans. Method: We investigate and analyze the problems of various items on maintenance monitoring of tunnel structure of 14 subway lines of Seoul subway in downtown area. Result: The maintenance monitoring items, measurement quantity and installation location are classified into open tunnel and excavation tunnel and improvement plans are suggested respectively. Various durability criteria of the measuring instruments were examined, and durability confirmation method suggested improvement measures such as approval, inspection, inspection and testing, calibration of monitoring sensors. Conclusion: Applying the improvement measures of the tunnel structure maintenance monitoring to the construction site will increase the efficiency of the maintenance monitoring and contribute to the development of construction monitoring technology.

A Development of Image Transfer Remote Maintenance Monitoring System for Hand Held Device (휴대용 화상전송 원격정비 감시시스템의 개발)

  • Kim, Dong-Wan;Park, Sung-Won
    • The Transactions of the Korean Institute of Electrical Engineers P
    • /
    • v.58 no.3
    • /
    • pp.276-284
    • /
    • 2009
  • In this paper, we develop the image transfer remote maintenance monitoring system for hand held device which can compensate defects of human mistake. The human mistakes always happen when the worker communicate information each other to check and maintenance the equipment of the power plant under bad circumstance such as small place and long distance in power plant. A worker couldn't converse with other when in noisy place like Power plant. So, we make some hand device for handy size and able to converse in noisy place. The developed system can have improvement of productivity through increasing plant operation time. And developed system is composed of advanced H/W(hard ware) system and S/W(soft ware)system. The H/W system consist of media server unit, communication equipment with hand held device, portable camera, mike and head set. The advanced s/w system consist of data base system, client pc(personal computer) real time monitoring system which has server GUI(graphic user interface) program, wireless monitoring program and wire ethernet communication program. The client GUI program is composed of total solution program as pc camera program, and phonetic conversation program etc.. We analyzed the required items and investigated applicable part in the image transfer remote maintenance monitoring system with hand held device. Also we investigated linkage of communication protocol for developed prototype, developed software tool of two-way communication and realtime recording skill of voice with image. We confirmed the efficiency by the field test in preventive maintenance of plant power.