• Title/Summary/Keyword: Limited Time

Search Result 5,417, Processing Time 0.033 seconds

A Scheduling Algorithm for Workstations with Limited Waiting Time Constraints in a Semiconductor Wafer Fabrication Facility (대기시간 제약을 고려한 반도체 웨이퍼 생산공정의 스케쥴링 알고리듬)

  • Joo, Byung-Jun;Kim, Yeong-Dae;Bang, June-Young
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.35 no.4
    • /
    • pp.266-279
    • /
    • 2009
  • This paper focuses on the problem of scheduling wafer lots with limited waiting times between pairs of consecutive operations in a semiconductor wafer fabrication facility. For the problem of minimizing total tardiness of orders, we develop a priority rule based scheduling method in which a scheduling decision for an operation is made based on the states of workstations for the operation and its successor or predecessor operation. To evaluate performance of the suggested scheduling method, we perform simulation experiments using real factory data as well as randomly generated data sets. Results of the simulation experiments show that the suggested method performs better than a method suggested in other research and the one that has been used in practice.

TECHNICAL EVALUATION OF THE CONTINUED OPERATION OF NPP

  • Kim, Tae-Ryong;Jin, Tae-Eun
    • Nuclear Engineering and Technology
    • /
    • v.40 no.4
    • /
    • pp.277-284
    • /
    • 2008
  • Recently, the long-term operation of a nuclear power plant beyond its licensed term has become a worldwide trend as long as the safety of the plant is maintained in the extended period. Kori Unit 1, the oldest PWR in Korea, is the foremost example of this type of long-term operation in Korea. Comprehensive technical evaluation of the long-term operation of this plant was completed to confirm the overall safety of the plant. The technical evaluation included a review of PSR results, an assessment on aging management programs and time limited aging analyses, and a statement of radiological impact on the environment. Based on all of the results of the technical evaluation activities, Kori Unit 1 was approved to operate for an additional 10 years beyond its original design life of 30 years.

A Study for analysis of Inverse Kinematics system to Character Animations & Motion Graphics education

  • Cho, Hyung-ik;Shin, Seung-Jung
    • International journal of advanced smart convergence
    • /
    • v.10 no.3
    • /
    • pp.149-156
    • /
    • 2021
  • Today, 3D softwares have become an essential tool in all areas of Video, including Movies, Animations, CFs, Motion Graphics and Games. One of the most commonly used fields is the 3D character video part. However, these 3D character animations and motion graphics softwares are difficult to learn and too much to learn, making it difficult to learn them all in a university education with a limited time of four years. In this paper, many Inverse kinematics tools, which are essential in the 3D character animations and motion graphics field, compare and analyze the strengths and weaknesses of each tool, focusing on Bone, Character Studio, and Character Animation Toolkit, which are most commonly used in work fields. And use Delphi techniques for 3D experts to secure objectivity. Therefore, for universities that require large amounts of teaching in a limited time, I propose an analysis of which of the above three Inverse Kinetics tools is advantageous for students to select and focus on for efficient education.

Historical Review on High-rise Buildings-promoting Policies on the Main Roads of Seoul for Urban Beautification from the 1950s to the 1970s (1950-1970년대 도시미화를 위한 서울 간선도로변 고층화제도의 사적 고찰)

  • Park, Ilhyang;Jeon, BongHee
    • Journal of the Architectural Institute of Korea Planning & Design
    • /
    • v.35 no.10
    • /
    • pp.41-52
    • /
    • 2019
  • The purpose of this study was to analyze the historical development of high-rise buildings-promoting policies in Seoul in terms of modern urban redevelopment. The results of this study were as follows; The maximum height of the buildings has been limited by National codes since 1934. But at the same time, Seoul Metropolitan government had limited the minimum building floors of roadside buildings through local regulations after the Korean War. The high-rise city had been regarded as a means of beautifying Seoul for a long time. However since the 2000s, the minimum height limit for buildings was removed from local regulations and the concept of high-rise restrictions was no longer significant as before.

OBSERVATION ERROR OF TIME-LAPSED PHOTOS IN CONSTRUCTION OPERATION MONITORING

  • Jiwon Choi;Julian Kang
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.1042-1047
    • /
    • 2005
  • A web-based camera (webcam) is expected to enhance construction operation monitoring. However, webcams are often installed outside a building because their mobility is limited by cable wiring, which makes it difficult to monitor construction operations inside the building. If a webcam is integrated with emerging wireless communication technologies, construction professionals may be able to monitor interior construction operations using webcams without getting network cables wired on a congested and dynamic construction job site. However, one may concern that wireless communication may not be fast enough to transport all webcam images seamlessly. This paper presents an investigation as to the observation error of webcam images when a limited amount of images are delivered.

  • PDF

Building Smarter City through Big Data - Best Practices in Seoul Metropolitan Gov.

  • Kim, Ki-Byoung
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.19-20
    • /
    • 2015
  • Since 2013, Seoul Metropolitan Government (SMG) has introduced big data initiatively in administration and put into practices in transportation, safety, welfare in order to overcome limited resources and conflicting interests. For establishing a new midnight bus service, SMG prepared optimized midnight bus routes by analyzing big data from mobile phone Call Data Record (CDR) through collaboration with a telecommunication company. Despite of limited budget and resources, newly identified routes can cover over 42% of the citizen with 9 routes and less than 1% of buses compare with day time operation. In addition to solve transportation problem, SMG utilizes big data to resolve location selection problem for choosing new facility locations such as life double cropping centers and senior citizen leisure centers. As results, SMG demonstrates big data as a good tool to make policies and to build smarter city by overcome space-time limitation of resources, mediation of conflicts, and maximizes benefit of the citizen.

  • PDF

A Study on Cost Standards for Securing Appropriate Construction Costs for Small-Scale Construction Sites (소규모 시공현장 적정공사비 확보를 위한 원가기준 마련 연구)

  • Oh, Jae-Hoon;An, Bang-Yul
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.347-348
    • /
    • 2023
  • In construction sites, small-scale construction quantities or limited work hours below the daily work volume may occur due to on-site conditions. For small-scale quantities, the input of equipment and labor is designed based on an hourly basis in the invoice, resulting in a difference from the actual cost. In this study, we aim to explore solutions from the perspective of construction cost standards to secure appropriate construction costs for small-scale and time-limited construction sites. Firstly, to preserve the basic construction costs on-site, we established standards where half the cost would be charged for construction quantities below four hours and a full day's cost would be designed for construction quantities between four to eight hours. Additionally, realistic construction cost calculation standards are expected to be provided by realizing a surcharge rate for work hour limitations to secure appropriate construction costs.

  • PDF

A WTLSW Protocol and a Proxy Model to Ensure End-to-End Security for Mobile Devices with Limited Resources (제한된 자원의 무선 단말기를 위한 종단간 보안을 제공하는 WTLSW 프로토콜 및 프록시 모델)

  • Lee, Heon-Guil
    • Journal of Industrial Technology
    • /
    • v.29 no.B
    • /
    • pp.33-39
    • /
    • 2009
  • The need for end-to-end security has been increased with the widespread use of mobile devices in wireless internet access applications such as mobile commerce. The WAP1.x has an end-to-end security problem that the message transmitted between the mobile device and the Web server is decrypted inside the gateway within a short time. To overcome this problem, several protocols including WAP2.0 has been proposed. These protocols require that the heavy modules such as TLS or data compression modules should be installed on the mobile device with limited resources. This paper proposes a new WTLSW(WTLS-TLS at Web server) protocol and a new WAP2.0 proxy model in order to ensure end-to-end security between the mobile device and the Web server and to be appropriate for mobile devices with limited resources.

  • PDF

Performance Analysis of Nonlinear Energy-Harvesting DF Relay System in Interference-Limited Nakagami-m Fading Environment

  • Cvetkovic, Aleksandra;Blagojevic, Vesna;Ivanis, Predrag
    • ETRI Journal
    • /
    • v.39 no.6
    • /
    • pp.803-812
    • /
    • 2017
  • A decode-and-forward system with an energy-harvesting relay is analyzed for the case when an arbitrary number of independent interference signals affect the communication at both the relay and the destination nodes. The scenario in which the relay harvests energy from both the source and interference signals using a time switching scheme is analyzed. The analysis is performed for the interference-limited Nakagami-m fading environment, assuming a realistic nonlinearity for the electronic devices. The closed-form outage probability expression for the system with a nonlinear energy harvester is derived. An asymptotic expression valid for the case of a simpler linear harvesting model is also provided. The derived analytical results are corroborated by an independent simulation model. The impacts of the saturation threshold power, the energy-harvesting ratio, and the number and power of the interference signals on the system performance are analyzed.

Pediatric postintensive care syndrome: high burden and a gap in evaluation tools for limited-resource settings

  • Chaiyakulsil, Chanapai;Opasatian, Rapee;Tippayawong, Paweethida
    • Clinical and Experimental Pediatrics
    • /
    • v.64 no.9
    • /
    • pp.436-442
    • /
    • 2021
  • This article aimed to summarize the impact and burden of pediatric postintensive care syndrome (PICS-p) in the physical, mental, cognitive, and social health domains after a review of the current pediatric literature in MEDLINE and PubMed. We also aimed to elucidate the limitations of the current evaluation tools used in limited-resource settings. PICS-p can impact a child's life for decades. Most validated tools are time-consuming, require qualifications, and expertise, are often limited to older children, and can evaluate only one domain. A novel, simple, and comprehensive surveillance tool can aid healthcare providers in the early detection and intervention of PICS-p. Further studies should validate and refine the parameters that will enhance the outcomes of pediatric intensive care unit survivors.