Recently, the long-term operation of a nuclear power plant beyond its licensed term has become a worldwide trend as long as the safety of the plant is maintained in the extended period. Kori Unit 1, the oldest PWR in Korea, is the foremost example of this type of long-term operation in Korea. Comprehensive technical evaluation of the long-term operation of this plant was completed to confirm the overall safety of the plant. The technical evaluation included a review of PSR results, an assessment on aging management programs and time limited aging analyses, and a statement of radiological impact on the environment. Based on all of the results of the technical evaluation activities, Kori Unit 1 was approved to operate for an additional 10 years beyond its original design life of 30 years.
Keywords
Periodic Safety Review; Continued Operation; Safety Factors; Aging Management Program; Time Limited Aging Analyse;
Citations & Related Records

Times Cited By Web Of Science : 0  (Related Records In Web of Science)
Times Cited By SCOPUS : 0
연도 인용수 순위
  • Reference
1 MOST, Enforcement Orders of the Atomic Energy Act No.17304, 2005.9
2 MOST, Notice 2005-31,Guidance for Technical Standards Applied to Continued Operation of Nuclear Facilities beyond their Design Life, 2005.12
3 NRC, Regulatory Guide 1.154, Format and Content of Plant-Specific Pressurized Thermal Shock Safety Analysis Reports for Pressurized Water Reactors, 1987.1
4 NRC, NUREG-1801, Generic Aging Lessons Learned (GALL) Report, Vol. 1, Rev. 1, 2005.9
5 NRC, Regulatory Guide 1.161, Evaluation of Reactor Pressure Vessels with Charpy Upper-Shelf Energy Less Than 50 Ft-Lb, 1995.6
6 NRC, NUREG-1800, Standard Review Plan for License Renewal Applications for Nuclear Power Plants, Rev.1, 2005.9
7 IAEA, Plant Life Management for Long-term Operation of Light Water Reactors - Principles and Guidelines, Technical Reports Series No. 448, 2006
8 KEPRI, NPP Lifetime Management Study (I), Final Report (Korean), 1996
9 IAEA, Safety Aspects of Long-term Operation of Pressurized Water Reactors, under review, 2005
10 IEEE-323, IEEE Standard for Qualifying Class 1E equipment for Nuclear Power Generating Stations, 1983
11 IAEA, Implementation and Review of NPP Aging Management Program, Safety Series No. 15, 1999
12 KEPRI, NPP Lifetime Management Study (II), Final Report (Korean), 2001
13 KHNP, PSR on Kori Unit 1, Final Report (Korean), 2002
14 ASME Sec. XI, Appendix G, Fracture Toughness Criteria for Protection against Failure, 1995
15 IAEA, Periodic Safety Review of NPP, Safety Series No. NS-G-2.10, 2003
16 10CFR Part 54, Requirements for Renewal of Operating Licenses for NPP - Table of Contents, Sec. 54.21 Contents of Application - Technical Information, 1995
17 NEI 95-10, Industry Guideline for Implementing the Requirements of 10CFR Part 54, License Renewal Rule, 1995