• Title/Summary/Keyword: Korea Institute of Procurement

Search Result 302, Processing Time 0.028 seconds

A Study on the Satisfaction Level of the National Defense Electronic Procurement System Service by Applying the SERVQUAL Model (SERVQUAL 모형을 적용한 국방전자조달 서비스에 대한 만족도 분석)

  • Min, Wonbae;Kang, Seokjoong;Lee, Bumkoo
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.18 no.2
    • /
    • pp.488-495
    • /
    • 2014
  • The national defense electronic procurement system is an information system supporting DAPA, services (Army, Navy and Air Force), and the procurement companies in the electronic bidding. It has contributed greatly to improving the efficiency of the national defense electronic procurement process by providing various information services based on inter-operation among the related parties. However the national defense electronic procurement system is expected to be upgraded to the next version in accord with rapidly evolving infrastructure based on high technology and increasing various communication channels. This paper investigates the satisfaction level of the system users and proposes directions for the next-generation procurement portal.

Analysis of the Procurement Management Process for the Gas & Oil Plant projects (Gas & Oil 플랜트 조달관리 프로세스 분석)

  • Won, Seo-Kyung;Kang, Min-Woo;Lee, Jun-Bok;Kim, Sun-Kuk;Han, Choong-Hee
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.491-494
    • /
    • 2007
  • Recently Gas & Oil plant construction projects are increasing in the world. The EPC (Engineering, Procurement and Construction) company, which participate in the plant projects, should possess the pertinent engineering license and procurement skill to create high added-value. It is because the procurement is very substantial to cover 70% of the total project cost. Nonetheless, there exist various risks involved in the procurement process due to the characteristics of the construction projects with long duration and complicated process as well as the procured goods or services subjected to various logistics. The objective of this paper is to analyze proper process in the procurement and to identify various information and document. Also to analyze procurement process, the principal data are derived from the interview with experts and specialty contractors of plant project. The result of this study would widely be used as a guide to the procurement personnel in forecasting the risks in advance.

  • PDF

The Impact of Design-Bid-Build Procurement Methods on Project Performance in Libya

  • Ghadamsi, Alaeddin;Braimah, Nuhu
    • Journal of Construction Engineering and Project Management
    • /
    • v.6 no.2
    • /
    • pp.16-23
    • /
    • 2016
  • The use of inappropriate procurement methods to deliver construction projects has long been acknowledged as a major source of poor project performance and is particularly problematic for the Libyan Construction Industry. Poor procurement method selection has been recognised as a major contributory factor to frequent time and cost overruns. This paper offers a way of selecting specific procurement methods to maximize successful project performance. The methodology involves an intensive review of relevant literature, followed by a semi-structured questionnaire survey. The key findings of the study reveal that 11 out of its 12 common selection criteria exhibit a significant contribution to one or more project performance criteria (time, cost and quality). Project clients should therefore prioritise these criteria when selecting a design-bid-build method. Knowledge of the criteria that contribute positively to project performance will also enable clients to work out, prior to and during construction, the best measures and provisions for successful project outcomes.

A Basic Model of the Procurement Planning of Resources by Activity in Construction Projects (건축공사 액티비티별 소요자원 조달계획의 기초모델링)

  • Kim, Ji-Hyun;Nam, Gi-Yung;Lee, Soo-Yong
    • Journal of the Korea Institute of Building Construction
    • /
    • v.12 no.3
    • /
    • pp.340-346
    • /
    • 2012
  • Recently, the construction industry has been pursuing the rationalization of its various systems through informatization. Procurement is a highly important element of the construction process, as it is directly related to the cost and quality of a construction project. In addition, procurement management of resources is in an indivisible relation, so that it is significant to link each other effectively. This study proposed construction activity and basic data connected to cost summary work for the categorization and utilization of resources. This study connected that activity to detailed items of material and labor cost, and proposed a procurement planning model of resources by activity that can utilize all resources and information. In addition, this model can classify resources and information by various forms. We found that the utilization of this procurement planning model will be higher because it can grasp various problems that occur in the passive procurement and provide additional functions that can be modified.

Gradational Risk Management in Procurement Phase for Plant Projects (플랜트 프로젝트의 구매조달 단계별 리스크 분석에 관한 연구)

  • Na, Sung-Yub;Moon, Seung-Jae;Yoo, Hoseon
    • Plant Journal
    • /
    • v.5 no.3
    • /
    • pp.59-65
    • /
    • 2009
  • In the plant EPC project, the procurement work can be considered as the most important part that affects the success or failure of project as it has the closest mutual influence in every execution process of the project. Procurement takes up generally 60% ~ 70% of the entire project budget and the current trend of plant EPC project becoming larger in scale and a variety of process technology being applied. So, it is needed to identify the risks that are expected to occur according to the stages of procurement work, namely, proposal stage, manufacturer selection and purchasing agreement stage, expediting the process management of manufacturer stage, inspection stage and logistics & transportation stage. The management of observation and control of the risks should be performed with the response techniques which are 'avoid',' transfer'and' mitigate'.

  • PDF

DEVELOPMENT OF CONSTRUCTION PROCUREMENT INFORMATION EXCHANGE STANDARDS IN TAIWAN

  • Ren-Jye Dzeng;Bin Wu
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.1053-1057
    • /
    • 2005
  • The Taiwan government agencies have been promoting e-commerce for the construction industry with several initiatives since 2000. The development of standards for the procurement information exchange among government agencies, construction firms, and suppliers for the construction industry is one of the major initiatives and begins to produce tangible results. This paper reviews the effort for developing the information exchange standards and compares the development strategies used in different segments in the supply chain. Lessons learned during the development course are also discussed.

  • PDF

A Study on the Improvement Direction through the Analysis of the Legal System and Current Process of KONEPS (국가종합전자조달시스템의 제도 및 프로세스 고찰을 통한 개선 방향 연구)

  • Kim, Sang-Min;Lee, Hyun-Soo
    • Journal of Digital Convergence
    • /
    • v.15 no.11
    • /
    • pp.23-35
    • /
    • 2017
  • Since the beginning of 2002, KONEPS(Korea ON-line E-Procurement System) which is known with GePS(Government e-Procurement Service), has become a significant role in Korea public procurement service. This paper focuses on the amendments of the related laws and the practical improvement of inconveniences and inefficiencies in user's' position during the use of KONEPS. We analyzed the case of government procurement by major countries, the detailed process and function of KONEPS, and confirmed the revised procurement laws since the commencement of KONEPS. When a user of KONEPS makes an online purchase at the g2b shopping mall to purchase procurement goods, we analyzed focused on the inconvenience of option selection, user feedback after purchasing, unification of the purchase procedure, compared with general online shopping purchase. This paper suggests practical ways to improve the inconveniences and inefficiencies that arise in the process of procurement and use from KONEPS. It is necessary to study on the construction contracts and the empirical studies based on the questionnaire on the functions of procurement law and research model for the cases used in this study in the future.

National Public Procurement Innovation through SRM (SRM 솔루션을 통한 국가 공공조달 시스템 혁신 방안)

  • Chang, Juno;Lee, Jae-Won;Lee, Ig-Hoon;Lee, Sang-Goo
    • Journal of KIISE:Computing Practices and Letters
    • /
    • v.14 no.9
    • /
    • pp.823-834
    • /
    • 2008
  • Recently, interests for SRM have been increasing rapidly to automate the whole processes of supply chain from sourcing to procurement and improve the whole efficiency of supply chain by strategically managing the relationship with external partners (suppliers). The national procurement service of Korea is trying to build new paradigms by introducing SRM for improving the competitiveness of national public procurement service. For this, a new assessment model for evaluating and selecting suppliers with fairness and objectivity should be developed. In this paper, we propose a new SRM solution including a model that evaluates and grades of suppliers' capabilities of performing the contracts. We also explain the innovation of national public procurement system through this SRM solution.

A Study on Optimal Lead Time Selection Measures of the Construction Materials (건설자재의 적정 리드타임 산정에 관한 연구)

  • Lee, Sang-Beom
    • Journal of the Korea Institute of Building Construction
    • /
    • v.4 no.1
    • /
    • pp.105-110
    • /
    • 2004
  • Resource procurement is an important management area because cost of resource covers 40% of total construction project cost and resource delivery has direct relationship with project performance. Integration of cost provides various potentials for effective and efficient project control. This study investigates the usefulness of time in resource procurement management focused on materials. These days, construction projects have characterized manufacture because of industrialization and component. Therefore, application of systematic resource planning has been requested in the construction. There are many companies conducting procurement of resource on the web by applying MRP, ERP etc. in the construction. However, in applying them in the construction yet, there is obstruction. MRP has the character doing its function under accurate cost prediction of resource. But prediction of resource is difficult in industry mechanism of the construction. If accurate cost prediction of resource is possible in the construction, it will be expected to reduce cost of procurement of resource substantially by applying successful resource planning model in the manufacture. On the basis of recent current, the purpose of study is to present procurement of resource system that period observance of construction and minimization of stock is possible by reflecting accurate lead-time to apply proactive thought to be able to cope with alteration of construction schedule efficiently in analyzing resource planning of the construction site.

A Study on Procurement Information Management Model through the Analysis of Industrial Engineering Process (산업설비분야의 업무분석을 통한 구매관리 정보모델에 관한 연구)

  • Lee, Jung-Woo;Hwang, Doo-Won;Song, Young-Woong;Choi, Yoon-Ki
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.567-570
    • /
    • 2006
  • Recently because of rising of international oil prices, plant industry market has been active and purchase orders of big project are tending upwards. For strengthening of overseas plant competitive power and successful project operating, it is essential the project management technology and method. but procurement management of plant industry has evaluated uncompetitive. In this study, we analyzed the process of procurement founded and main contents and information. we study flowing of procurement information. user and creation time though detailing procurement information, then, we suggest the Contents Classification System and Management Model of Procurement Information.

  • PDF