Browse > Article
http://dx.doi.org/10.5345/JKIBC.2012.12.3.340

A Basic Model of the Procurement Planning of Resources by Activity in Construction Projects  

Kim, Ji-Hyun (Department of Architectural Engineering, Pukyong National University)
Nam, Gi-Yung (Jungang JSK Construction Company Limited)
Lee, Soo-Yong (Department of Architectural Engineering, Pukyong National University)
Publication Information
Journal of the Korea Institute of Building Construction / v.12, no.3, 2012 , pp. 340-346 More about this Journal
Abstract
Recently, the construction industry has been pursuing the rationalization of its various systems through informatization. Procurement is a highly important element of the construction process, as it is directly related to the cost and quality of a construction project. In addition, procurement management of resources is in an indivisible relation, so that it is significant to link each other effectively. This study proposed construction activity and basic data connected to cost summary work for the categorization and utilization of resources. This study connected that activity to detailed items of material and labor cost, and proposed a procurement planning model of resources by activity that can utilize all resources and information. In addition, this model can classify resources and information by various forms. We found that the utilization of this procurement planning model will be higher because it can grasp various problems that occur in the passive procurement and provide additional functions that can be modified.
Keywords
procurement management; activity; cost summary work; procurement planning of resources;
Citations & Related Records
Times Cited By KSCI : 8  (Citation Analysis)
연도 인용수 순위
1 Ryu HG. Development of Data Warehouse for Construction Material Management. Journal of the Korea Institute of Building Construction. 2011 June;11(3):319-25.   과학기술학회마을   DOI   ScienceOn
2 Lee SB. A Study on Optimal Lead Time Selection Measures of the Construction Materials. Journal of the Korea Institute of Building Construction. 2004 March;4(1):105-10.   과학기술학회마을
3 Jang MH. Development of a Materials Management System Considering Construction Supply Chain Management. Journal of the Korea Institute of Building Construction. 2009 October;9(5):89-95.   과학기술학회마을
4 KIM JH. A Modeling on the Management of Procurement Item according to Activity in Construction Network Diagram [dissertation]. Busan (Korea): Pukyong National University; 2010. 40 p.
5 Jang MH. Development Materials Management System Considering Construction Supply Chain Management. Journal of the Korea Institute of Building Construction. 2009 October;9(5):89-95.   과학기술학회마을
6 Lee SB. A Study on Optimal Lead Time Selection Measures of the Construction Materials. Journal of the Korea Institute of Building Construction. 2004 March;4(1):105-10.   과학기술학회마을
7 Lee HS, Song SH, Kim WY. Process Redesign for Material Management by Analyzing Information. Journal of Architectural Institute of Korea. 2002 November; 18(11):125-32.
8 Song YW, Choi YK. A Study on Material Requirement Planning by Integrating Schedule and Cost. Korean Journal of Construction Engineering and Management. 2003 March;4(1):106-13.   과학기술학회마을
9 Han JY, Hong YS, Kim KR, Shin DW. A Resource Model for Multi-project Management. Journal of Architectural Institute of Korea. 2004 November;20(11):133-42.   과학기술학회마을
10 Lee JM, Choi JS. Procurement Management Impact on Scheduling(Focus on Steel Frame Erection Works). Journal of Architectural Institute of Korea. 2007 December; 23(12):141-8.   과학기술학회마을