1 |
Ryu HG. Development of Data Warehouse for Construction Material Management. Journal of the Korea Institute of Building Construction. 2011 June;11(3):319-25.
과학기술학회마을
DOI
ScienceOn
|
2 |
Lee SB. A Study on Optimal Lead Time Selection Measures of the Construction Materials. Journal of the Korea Institute of Building Construction. 2004 March;4(1):105-10.
과학기술학회마을
|
3 |
Jang MH. Development of a Materials Management System Considering Construction Supply Chain Management. Journal of the Korea Institute of Building Construction. 2009 October;9(5):89-95.
과학기술학회마을
|
4 |
KIM JH. A Modeling on the Management of Procurement Item according to Activity in Construction Network Diagram [dissertation]. Busan (Korea): Pukyong National University; 2010. 40 p.
|
5 |
Jang MH. Development Materials Management System Considering Construction Supply Chain Management. Journal of the Korea Institute of Building Construction. 2009 October;9(5):89-95.
과학기술학회마을
|
6 |
Lee SB. A Study on Optimal Lead Time Selection Measures of the Construction Materials. Journal of the Korea Institute of Building Construction. 2004 March;4(1):105-10.
과학기술학회마을
|
7 |
Lee HS, Song SH, Kim WY. Process Redesign for Material Management by Analyzing Information. Journal of Architectural Institute of Korea. 2002 November; 18(11):125-32.
|
8 |
Song YW, Choi YK. A Study on Material Requirement Planning by Integrating Schedule and Cost. Korean Journal of Construction Engineering and Management. 2003 March;4(1):106-13.
과학기술학회마을
|
9 |
Han JY, Hong YS, Kim KR, Shin DW. A Resource Model for Multi-project Management. Journal of Architectural Institute of Korea. 2004 November;20(11):133-42.
과학기술학회마을
|
10 |
Lee JM, Choi JS. Procurement Management Impact on Scheduling(Focus on Steel Frame Erection Works). Journal of Architectural Institute of Korea. 2007 December; 23(12):141-8.
과학기술학회마을
|