• Title/Summary/Keyword: Inspection Interval

Search Result 111, Processing Time 0.03 seconds

Analysis of Multi-Story Prestressed Concrete Structure Considering the Effect of Construction Stage (시공단계의 영향을 고려한 프리스트레스 콘크리트 다층 구조물의 해석)

  • Jeon, Chan-Ki
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.5 no.3
    • /
    • pp.213-223
    • /
    • 2001
  • This paper presents an analytical procedure for the time-dependent analysis of the multi-story prestressed concrete structure under the construction stage. To account for the actual structural behavior, the procedure considers the effects due to the construction interval and the time-dependent losses of prestress at every construction step on the entire structural response. A numerical study is performed to demonstrate the general validity of the approach and to quantitatively evaluate the effects resulted from the time-dependent behaviors during construction. Recommendations and conclusions are developed by comparisons with structural responses using the present and conventional methods of analysis. The comparative results show that both effects of sequential construction and time-dependent prestress losses should be considered for the construction stage analysis.

  • PDF

Application of Reliability based Inspection for an Effective RCM Approach of Railway System (철도시스템의 효과적 RCM접근을 위한 신뢰성 기반 검사(RBI)적용)

  • Song, Kee-Tae;Kim, Min-Ho;Baek, Young-Gu;Ahn, Eun-Jin;Lee, Key-Seo
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.1294-1300
    • /
    • 2008
  • In the current railway industry in Korea, a lot of researches and studies have been progressed to establish RAMS process and construction of RCM system in accordance with international standards. On the point of view of applying the RCM to the railway system, many problems (i.e., reliability of the existing field data, the lack and incorrectness of failure information, etc) are described. To solve these problems, it is need to study and effort the RCM, practically. In this paper, lots of problems and solutions for methods determining the preventive maintenance interval of application of the RCM will be described. To do this, the method using the theory of RBI (Reliability Based Inspection) which is applied to the existing chemical plants and power plants is described. From this study, it is expected that in this situation that the quantitative data is not enough, the results that an analyst quantifies the qualitative factors and/or items will be a good reference that can effectively approach, on the side of determination about each maintenance task and inspection interval.

  • PDF

Risk-Based Inspection(RBI) Technology for Safety Management of the Pressurized Facilities (압력설비의 안전관리를 위한 위험기반검사(RBI) 기술)

  • Lee, Hern-Chang;Han, Seong-Hwan;Cho, Ji-Hoon;Kim, Tae-Ok
    • Journal of the Korean Institute of Gas
    • /
    • v.15 no.4
    • /
    • pp.1-6
    • /
    • 2011
  • Risk-based inspection (RBI) is a inspection technique suggesting inspection plan, such as inspection interval and inspection method, of the pressurized facilities based on its risk in the petrochemical, refinery and gas industries. Therefore, we can intensively and cost-effectively maintain, repair and manage the high-risk facilities through RBI technology. This paper reviews RBI technology, such as principle and implemental procedure of RBI, management of risks and facilities and return of investment through RBI, RBI technology at present and its application in domestic industries. In addition, some improvement directions of RBI are also proposed.

Determinating Sensor Location for Guided-Wave-Based Long Range Pipeline Inspection (유도파 기반 장거리 파이프라인 검사를 위한 모니터링 센서의 위치결정)

  • Na Won-Bae;Ryu Yeon-Sun;Kim Jeong-Tae
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2006.04a
    • /
    • pp.232-239
    • /
    • 2006
  • Guided wave techniques have been used for pipeline inspection because of the long range inspection capability of guided waves. One of main concerns of these technique is how ones decide the axial interval of sensors when they are utilized for pipeline inspection. This question is related to the characteristic of cylindrical guided wave propagation, especially wave attenuation. Thus, attenuation of fundamental longitudinal guided wave propagating liquid-filled steel pipes is numerically investigated in the paper. Several liquids such as water, diesel oil, castor oil etc. are considered for the filing materials in the pipes. Sink is considered for numerical models for abandoning standing wave modes; hence, the attenuation dispersion curves become much simpler. Those attenuation calculations can be utilized for guided-wave-based nondestructive testing of pipelines when one inspects pipelines, using monitoring sensors, which are installed outside pipes.

  • PDF

Smart Card Reader기 Connector 조립 및 Vision 검사용 자동화기기 개발에 관한 연구

  • 노병옥;성하경
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 1994.10a
    • /
    • pp.543-548
    • /
    • 1994
  • This is the paper on the development of assemnly automation and visual inspection system for smart card reader connector. The automation consists of 3 main process injection, assembly and inspection. During the injection, the main pin of a reel. transferred under uniform tension, is cut with an injection interval and positioned precisely to an injection mold by roll feeder after injection. The main base is stacked to a magazine for main pin's exact positionning to a mold . For last effective production, The turn table and pick & place are driver with gears and came by a single monter. We developed the small parts handling technigue for stable supply of micro ist pin and 2nd pin and could determine the orientation and position of those pins. For reliable inspection, We used the vision system which examins the guality of arranged pins with a CCD camera. The connector models which can be manufactured with this system are 8 pin and 10 pin type. The user can select the connector model for production and adjust the torerable error range during the inspection of arranged pins.

  • PDF

Exponential Lifetime Estimation with Unequal Interval Censoring (불균등 구간검사를 이용한 지수수명시간의 추정)

  • 이태섭;윤상운
    • Journal of Applied Reliability
    • /
    • v.2 no.2
    • /
    • pp.113-119
    • /
    • 2002
  • The estimation of mean lifetimes in presence of interval censoring with replacement procedure are examined when the distributions of lifetimes are exponential. It is assumed that, due to physical restrictions and/or economic constraints, the number of failures is investigated only at several inspection times during the lifetime test. The maximum likelihood estimator is found in an implicit form. The Cramer-Rao lower bounds of the estimates are found in places of variances and by simulations the properties of the estimates are examined.

  • PDF

A Water Surface Detection Method by Correlation Analysis of Watermark Images with Time Interval (시차가 있는 수위표 이미지의 상관분석을 통한 수면측정기법)

  • Seo, Myoung-Bae;Lee, Chan-Joo;Kim, Dong-Gu
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.14 no.1
    • /
    • pp.470-477
    • /
    • 2013
  • The aim of this study is to suggest a detection method of water surface location and its evaluation results of application for same vertical position in two successive images with time interval including both staff gauge and water surface. A specific rectangular inspection area is defined from the top of watermark and then the correlation coefficients for the inspection area of the same position of two images with short time interval is calculated. Accordingly, it is possible to identify differences between changing area and fixed area of pixel density by the water flow. The photographs taken in the laboratory were analyzed in order to validate the proposed technique. As the result of the experiment, it is identified that characteristic of correlation coefficients depends on the size of the inspection area. In the case that the inspection area is within the entire width of the watermark, water surface characteristic according to correlation coefficients is clearly noticeable. Thus, it is identified that the proposed technique can be utilized to search water surfaces. Besides, using corelation analysis of two images with time interval, it is identified that error range between 10 and 42cm was reduced in the level of 2.6cm or less in the contaminated photo of existing image stage gauge. Therefore, it is expected that the suggested method can be utilized to enhance image stage gauge performance improving the previous water surface detection method.

A Study of the Proper Control-Interval through Comparative Analysis on Bridge Maintenance System (교량 적정 점검 주기에 관한 비교 연구)

  • Lee Yong-Su
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.113-118
    • /
    • 2001
  • Bridge Control and Inspection ensures the safety, utility, and durability of Bridge in use. This Paper compares Control-interval of Germany with that of Korea, which was described in the special law recently revised concerning the Safety Checkup of Facilities, and analyzes Period of Damage Discovery that the Damage report of other countries showed. According to a result of the analysis, damage requiring structure repair and reinforcement more frequently been discovered even in less than a decade after the completion of construction. The paper, therefore, suggested the reregulation on the Korean Control Interval on the basis of the result.

  • PDF

Analysis and Probability of Overestimation by an Imperfect Inspector with Errors of Triangular Distributions (삼각 과오 분포를 가진 불완전한 검사원의 과대 추정 확률과 분석)

  • Yang, Moon Hee;Cho, Jae Hyung
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.41 no.2
    • /
    • pp.117-132
    • /
    • 2018
  • There always exist nonzero inspection errors whether inspectors are humans or automatic inspection machines. Inspection errors can be categorized by two types, type I error and type II error, and they can be regarded as either a constant or a random variable. Under the assumption that two types of random inspection errors are distributed with the "uniform" distribution on a half-open interval starting from zero, it was proved that inspectors overestimate any given fraction defective with the probability more than 50%, if and only if the given fraction defective is smaller than a critical value, which depends upon only the ratio of a type II error over a type I error. In addition, it was also proved that the probability of overestimation approaches one hundred percent as a given fraction defective approaches zero. If these critical phenomena hold true for any error distribution, then it might have great economic impact on commercial inspection plans due to the unfair overestimation and the recent trend of decreasing fraction defectives in industry. In this paper, we deal with the same overestimation problem, but assume a "symmetrical triangular" distribution expecting better results since our triangular distribution is closer to a normal distribution than the uniform distribution. It turns out that the overestimation phenomenon still holds true even for the triangular error distribution.