• Title/Summary/Keyword: Improvement proposal

Search Result 421, Processing Time 0.026 seconds

Performance Evaluation of Scheduling Algorithm for VoIP under Data Traffic in LTE Networks (데이터 트래픽 중심의 LTE망에서 VoIP를 위한 스케줄링 알고리즘 성능 분석)

  • Kim, Sung-Ju;Lee, Jae Yong;Kim, Byung Chul
    • Journal of the Institute of Electronics and Information Engineers
    • /
    • v.51 no.12
    • /
    • pp.20-29
    • /
    • 2014
  • Recently, LTE is preparing to make a new leap forward LTE-A all over the world. As LTE privides high speed service, the role of mobile phones seems to change from voice to data service. According to Cisco, global mobile data traffic will increase nearly 11-fold between 2013 and 2018. Mobile video traffic will reach 75% by 2018 from 66% in 2013 in Korea. However, voice service is still the most important role of mobile phones. Thus, controllability of throughput and low BLER is indispensable for high-quality VoIP service among various type of traffic. Although the maximum AMR-WB, 23.85 Kbps is sufficient to a VoIP call, it is difficult for the LTE which can provide tens to hundreds of MB/s may not keep the certain level VoIP QoS especially in the cell-edge area. This paper proposes a new scheduling algorithm in order to improve VoIP performance after analyzing various scheduling algorithms. The proposal is the technology which applies more priority processing for VoIP than other applications in cell-edge area based on two-tier scheduling algorithm. The simulation result shows the improvement of VoIP performance in the view point of throughput and BLER.

Design Standard and Improvement Proposal of Slope (국내외 비탈면 설계기준 및 개선방안(설계안전율 중심으로))

  • Yu, Byeong-Ok;Song, Pyeong-Hyeon
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2008.10a
    • /
    • pp.296-296
    • /
    • 2008
  • 국내 절토비탈면은 이상 기후 및 건설공사의 증대로 인해 증가하고 있는 추세이며 장마철 및 태풍으로 인해 비탈면의 붕괴로 많은 인명 및 재산피해가 발생되고 있는 실정이다. 국내에서 사용되고 있는 기존의 비탈면의 설계기준은 암반의 불연속면에 대한 조사를 실시하고는 있지만 주로 암반의 굴착난이도를 토층, 리핑암, 발파암으로 구분하여 각각의 비탈면 절취경사를 결정하여 사용하는 방법을 사용하였으며 이러한 기준은 단순히 암석의 강도를 기준으로 설정되어 있으므로 암석의 공학적 특성 즉, 암반내 불연속면 방향성, 연속성, 충진물질, 마찰각, 풍화속도 등의 영향으로 공용후 비탈면 구배의 재조정 및 보강이 빈번하다. 국내외 절토비탈면의 설계기준은 각 기관별로 산재되어 있었으며 비탈면에 대한 설계 및 시공 등에 관한 기준은 도로와 철도 설계기준에 일부 반영되어 있을 뿐 항만, 댐, 택지조성 등 기타 시설 설계기준에는 비탈면에 대한 기준이 마련되어 있지 않아 표준적인 비탈면 설계기준 및 유지관리지침이 등이 필요하였다. 이러한 문제점을 보완하기 위해 2004년부터 2006까지 한국시설안전공단, 한국도로공사, 대한주택공사가 협동으로 연구한 건설공사 비탈면 설계 시공 및 유지관리에 관한 연구의 결과로 2006년도에 "건설공사 비탈면 설계기준"이 수립되었다. 이 설계기준은 건설공사에서의 기존 상이한 기준들을 정리하고 동일화하는 작업을 수행하였으며 지반의 조사에서부터 대책공까지를 막나하여 정리하였다. 그러나 최근에 급격한 기후변화로 인한 비탈면붕괴 빈번함에 따라 과거 적용되어 왔던 이들 기준을 적용하는 경우, 특히 상부 토층 및 풍화암 구간에서 많은 설계안전율을 만족하지 못해 많은 보강을 수반해야 하는 문제가 발생되고 있어 그 원인에 대한 분석을 수행하고자 하였다. 2006년도 정리된 기준은 과거에 적용하여 온 유기시의 안전율 조건을 Fs > 1.1~1.2을 적용하였던 것을 Fs > 1.2로 통일하였으며 지하수위 조건은 지표면에 위치하도록 하였다. 지하수위 조건은 풍화암 및 토층의 경우, 과거 지표면에 -3m를 적용한 시기가 있었으나 지표면에 지하수위를 적용하는 것이 일반적인 해석방법이다. 이러한 결과의 원인을 검토해 보면 다음과 같다. 첫째, 풍화암 및 토층에 적용되어 온 지반강도 정수가 과거 적용한 값보다 최근에는 작아지는 경향을 보이고 있다. 둘째, 지하수위 적용문제로 현재 지표면에 지하수위를 두어 안전율을 감소시키는 문제로 이는 최근 들어 많은 연구기관에서 강우시 간극수압의 증가에 대한 연구가 활발하게 진행되고 있다. 그러나 침투수 해석은 현행 기준에도 강우의 침투를 고려한 해석을 실시하는 경우 FS > 1.3 적용하는 것으로 되어 있으나 대부분의 해석에서는 적용이 되지 못하고 있는 실정이다. 셋째, 안전율이 과거에 주로 적용된 Fs > 1.1에서 Fs > 1.2로 상향 조정되어 우기시의 설계안전율 만족시키지 못하는 문제이다. 그러므로 이러한 문제점을 개선하기 위한 검토가 필요하며 장기적으로 이에 대한 합리적인 기준을 개정하는 작업이 추후에 수행되어야 할 것으로 판단된다.

  • PDF

A Beacon antenna of GPS impact and performance improvement implementation the proposal (중파 안테나의 GPS영향과 성능개선 구현 및 제안)

  • Choi, Yong-Kwon;Jeong, Jin Ho;Lee, Sang Jeong
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2015.10a
    • /
    • pp.279-282
    • /
    • 2015
  • Fisheries development of the basic law pursuant to article 15 (marine safety management, etc.) one of maritime safety and maritime traffic facilities nationwide network of DGPS in accordance with the building maximize infrastructure utilization and country. Source technology has been improving steadily raised for the benefit daegukmin. In particular, look at the type of product for the marine supply medium-wave receiver Performance products that satisfy most of the IMO Advisory. The antenna and receiver are separate structural supply for some integrated model with a very high Rather it is used as a portable receivers for marine positioning cheap integrated model development is needed. Correction of satellite navigation receivers for the current Marine GPS module, medium-wave modules can be developed one low cost Integrated in independent operating environments do not support the model development done look at what the problem is 285kHz ~ 315kHz in DGPS Beacon receiver structure using a medium wave or Beacon The medium-wave antenna and a GPS receiver signal to noise ratio was studied GPS signal attenuation on the DGPS performance looked at each GPS manufacturer medium-wave signal-to-noise ratio and normalized impact by GPS manufacturers noise power ratio per bandwidth for medium-wave GPS signals affect it was implemented to improve performance.

  • PDF

The Development of Risk Management Process Model during Bidding Phase for Success of Oversea Construction Projects (성공적 해외건설사업을 위한 입찰단계의 리스크 관리 프로세스 모델 개발 - 발전 플랜트 EPC 사업을 중심으로 -)

  • Seo, Jae-Pil;Ryu, Han-Guk;Son, Bo-Sik;Choi, Yoon-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.4
    • /
    • pp.76-86
    • /
    • 2016
  • Recently, the Contracts of International Construction Business has been decreased from the beginning of 2015 in Korea, although it has been steadily increased until 2014. This trend could be caused by Low-Price Contracts, the lack of Know-how and experience in operating, the poor management of Claims and Low-Profitability in Business. It has been recognized that the qualitative improvement of Business Contacts are necessary for successful Projects. In the Bidding Process, therefore, Experience data as In-House Data and Lessons Learned for projects should be strategically involved to assure riskless offers. Accordingly the Proposal Process are needed to be organized and enhanced by including processes for risks review about technical, marketing and commercial part during the bidding. This paper proposes a Risk Management Process model during Bidding Phase, using Risk Evaluation Method through the project life-cycle. The Concept of Model is to define CSF (Critical Success Factor) in the bidding process and Risk Factors are linked to CSF and Organization based on RAM (Responsibility assignment matrix).

Analyzing the Engagement of Professional Construction Managers in Construction Management firm and Its Improvement Measures (CM 전문회사 단장 활용실태 및 개선방안)

  • Son, Chang-Baek;Huh, Young-Ki;Lee, Dong-Eun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.2
    • /
    • pp.87-95
    • /
    • 2013
  • The number of construction management firms has been increased as construction management delivery system has been active in Korean construction market. the capability of leading construction management professional, who is responsible for managing project administration, is important for commissioning construction management contracts. The quality of project proposal and the capability of leading construction management professional, which are assessed by the board of contract awarding committee, are the major contributors for commissioning the public construction management projects administered by the Korean public procurement service for contracting. Therefore, employing a very competent leading construction management professional is the critical strategy for awarding contract to the construction management firms' part. That is why the firms should secure a fixed number of leading construction management professional in a waiting list to proceed the contract commissioning process for expectant candidate projects, even if there is no project assignable to the leading construction management professionals. However, a measure that makes effectively use of the leading construction management professional in a waiting list has not been systematically implemented in the firms. In turn, the firm suffers considerable loss in a project personnel supply and demand plan. Expert opinions were obtained by the survey questionaries administered to top management of the construction management firms which are engaged in the construction management contracts for commissioning the public construction management projects administered by the Korean public procurement service either as principal or co-principal deliverer. This paper presents the findings obtained by investigating the actual employment state of the leading construction management professional in the waiting list and by analyzing the issues involved in mobilizing and demobilizing them. It contributes to implement a practical guide for searching effective solutions to the issues.

A Relationship study between the internal marketing-related organizational factors in construction companies and corporate performance - Surveyed by executives and employees in Contractor - (건설기업 내부마케팅 구성요인과 기업성과 간의 관계 연구 - 시공사 임직원을 대상으로 -)

  • Lee, Jong-Sun;Park, Soon-Kyu
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.2
    • /
    • pp.65-77
    • /
    • 2013
  • Recent economic slump is making the construction industry's overall construction business environment worse. Contractors which are under the legal management and/or walk out are to the brink of 25 companies according to the Construction association of Korea released in 2011. It means that existing construction companies are required to transform the fundamental ideology of existing operation framework, and besides, existing companies should be transformed to service industry in order to proceed further into the developing future industries. In this study, it will be chosen the internal marketing related factor like 'Satisfying employees, internal customer, are the first thing to do in order to satisfy external customer.' which is about existing service industry field before its implementation in construction companies. In addition, appropriateness test will be performed including both interactions between each of the factors affect mutually and looking into any management improvement effects on contractors. And also, this proposal is suggested by approaching with internal marketing strategy which is both paradigm shift for customers by construction company members and another internal communication way as a means of overcoming the crisis of overall construction industry under currently happening.

A Proposal of the Social Commerce Strategy for the Public Services' Performance Improvement (공공행정서비스 성과향상을 위한 소셜커머스 적용 전략 제안)

  • Chang, Yun Hee
    • Journal of Digital Convergence
    • /
    • v.12 no.3
    • /
    • pp.161-176
    • /
    • 2014
  • Social commerce is a new internet business model which are types of joint purchase, social link, promotion, and on-off association etc. The recent public organization has the dual target to increase sound finance, and to improve customer satisfaction and the quality of public service. The purpose of this study is to propose the strategy of public social commerce which makes it's customers become positive purchasers. We analyzed 31 public organizations, and found that the type of social link interlocking with SNS site in the various purpose of public, and the offline association type using the service of location base would be utilized very highly. We also found that the joint purchase type and the promotion type would be used in the area of public and private selective services intending to make a profit. The anticipated performance are as follows: rapidity and reliance, customer made thing and goodwill, convenience for the service environment quality, publicity and diffusion, and sales promotion, productivity increase and new finding of revenue model for the profit increase outcome.

Seismic Curvature Ductility of RC Bridge Piers with 2.5 Aspect Ratio (형상비 2.5의 RC 교각의 내진 곡률연성도)

  • Chung, Young-Soo;Park, Chang-Kyu;Lee, Eun-Hee
    • Journal of the Earthquake Engineering Society of Korea
    • /
    • v.8 no.3
    • /
    • pp.1-12
    • /
    • 2004
  • Due to the 1989 Loma Prieta, 1995 Hyogoken Nambu earthquakes, etc, a number of bridge columns  were collapsed in flexure-shear failures as a consequence of the premature termination of the column longitudinal reinforcement. Nevertheless, previous researches for the performance of bridge columns were concentrated on the flexural failure mode. It is well understood that the seismic behaviour of RC bridge piers was dependent on the performance of the plastic hinge of RC bridge piers, the ductility of which was desirable to be computed on the basis of the curvature. Experimental investigation was made to evaluate the variation of the curvature of the plastic hinge  region for the seismic performance of earthquake-damaged RC columns in flexure-shear failure mode. Seven test specimens in the aspect ratio of 2.5 were made with test parameters: confinement ratios, lap splices, and retrofitting FRP materials. They were damaged under series of artificial earthquakes that could be compatible in Korean peninsula. Directly after the pseudo-dynamic test, damaged columns were retested under inelastic reversal cyclic loading under a constant axial load, $P=0.1f_{ck}A_g$. Residual seismic capacity of damaged specimens was evaluated by analzying the moment-curvature hysteresis and the curvature ductility. Test results show that the biggest curvature was developed around 15cm above the footing, which induced the column failure. It was observed that RC bridge specimens with lap-spliced longitudinal steels appeared to fail at low curvature ductility but significant improvement was made in the curvature ductility of RC specimens with FRP straps wrapped around the plastic hinge region. Based on the experimental variation of the curvature of RC specimens, new equivalent length of the plastic hinge region was proposed by considering the lateral confinement in this study. The analytical and experimental relationship between the displacement and the curvature ductility were compared based on this proposal, which gave excellent result.

A Study on the Way of Securing the Practical Effectiveness of Oil Record Book (기름기록부 실효성 확보에 관한 연구)

  • Choi, Jung-Hwan;Lee, Sang-Il
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.20 no.4
    • /
    • pp.389-397
    • /
    • 2014
  • The purpose of this thesis is studying for a legal basis and definition of Oil Record Book. In the thesis, comparing with the laws related to punishment for false entry of Oil Record Book of the maritime countries and korea Act. Studying the improvement marine pollutants from ships by suggesting legal and institutional proposal which are able to make themselves increase effectiveness for recording and inspection of Oil Record Book. Suggest the solution of the problems raised in this thesis, First, The Oil Record Book should not be the evidence which is having the effectiveness simply after the accident of marine pollution, but take sanction on pre-inspection of Oil Record Book as establish the concrete administrative punishment for each contents-based record of Oil Record Book. Second, It should set up of judgement criteria of false entry of Oil Record Book by port state control officer. Third, It should strengthen the legal effectiveness of Oil Record Book contents such as Code(c) ; oil residue, Code(d); relating to bilge discharge by including premeditation for false entry of Oil Record Book. Also, The enhancement of role for marine pollution prevention manager raise the effectiveness of Oil Record Book as recognizing the importance of Oil Record Book.

An Analysis on Scientific and Technological Information Status and Demand of Small Businesses: Focuses on Busan·Ulsan·Gyeongsangnam-do Branches of KISTI (중소기업의 과학기술정보 요구 실태 분석 연구 - KISTI 부산·울산·경남지원을 중심으로 -)

  • Lee, Jong-Moon
    • Journal of the Korean BIBLIA Society for library and Information Science
    • /
    • v.26 no.3
    • /
    • pp.83-100
    • /
    • 2015
  • This paper aims to survey the supply status and demand of the scientific & technological information among the 1,059 small enterprises demanding the support in Busan, Ulsan and Gyeongsangnam-do which have been supported by the Branch of KISTI and to propose the approaches to improve the scientific & technological information system. As the results of this research, Busan, Ulsan and Gyeongsangnam-do have very poor business and R&D environment to the extent that 96.3% of businesses was small business (medium business only for 3.7%) and 31% of total small & medium-cized businesses has less than 10 R&D workers. Small & medium-sized businesses which have demanded the information to KISTI account for only 0.2% in average for 3 years. The information demand types are market trend (26.8%), industrial property right (22.1%), business proposal (19.9%), item exploration (16.8%) and quality certification (8.4%). The supplied informations include scientific and technological data survey, market survey, translation and information application seminar. The business achievements from the information supply include 379 cases in technological development improvement and launch of products, 88 cases in technology certifications and 414 cases in patents and utility design application and registration. By the analysis results, the small and medium-sized businesses have difficulties in using R&D information by themselves. Thus, it's proposed to establish the science and technology information center in southeastern region and develop the information advisors specialized in local specialty industry categories. It's also proposed to expand the manpower and budget of KISTI concerning the information support for small & medium-sized businesses.