The Development of Risk Management Process Model during Bidding Phase for Success of Oversea Construction Projects  

Seo, Jae-Pil (Department of Architecture, Soongsil University)
Ryu, Han-Guk (Department of Architecture, Changwon National University)
Son, Bo-Sik (Department of Architectural Engineering, Namseoul University)
Choi, Yoon-Ki (Department of Architecture, Soongsil University)
Publication Information
Korean Journal of Construction Engineering and Management / v.17, no.4, 2016 , pp. 76-86 More about this Journal
Abstract
Recently, the Contracts of International Construction Business has been decreased from the beginning of 2015 in Korea, although it has been steadily increased until 2014. This trend could be caused by Low-Price Contracts, the lack of Know-how and experience in operating, the poor management of Claims and Low-Profitability in Business. It has been recognized that the qualitative improvement of Business Contacts are necessary for successful Projects. In the Bidding Process, therefore, Experience data as In-House Data and Lessons Learned for projects should be strategically involved to assure riskless offers. Accordingly the Proposal Process are needed to be organized and enhanced by including processes for risks review about technical, marketing and commercial part during the bidding. This paper proposes a Risk Management Process model during Bidding Phase, using Risk Evaluation Method through the project life-cycle. The Concept of Model is to define CSF (Critical Success Factor) in the bidding process and Risk Factors are linked to CSF and Organization based on RAM (Responsibility assignment matrix).
Keywords
Bidding Work Process; Critical Success Factor; Risk Factor; Responsibility Assignment Matrix(RAM);
Citations & Related Records
Times Cited By KSCI : 2  (Citation Analysis)
연도 인용수 순위
1 Bu-Qammaz, A. S., Dikmen, I., and Birgonul, T. (2009) . "Risk assessment of international construction projects using the analytic network process." Canadian Journal of Civil Engineering, NRC Research Press Journals, 36(7), pp. 1170-1181.   DOI
2 Cho, G. T. (2003). "Analytic Hierarchy Process." Donghyun Press, pp. 1-321.
3 Choi, K. H. (2008). "Study on the measured variable development of critical success factors for Korean local festival" Ph.D thesis, Dongguk University.
4 Han, S. H., Sun S. M., Park, S. H., and Jung, D. W. (2006). "The hierarchical structure of cause-and-effect relationships on the profit factors in overseas construction projects" Korean Journal of Construction Engineering and Management, KICEM, 7(5), pp. 64-76.
5 Kang, H. W., Min, B. J., and Kim, Y. S. (2010). "Study on the Costs Variation Range through the Risk Factors for Overseas Plant Projects" Journal of the Architectural Institute of Korea, AIK, 26(7), pp. 139-146.
6 Kim, H. J. (2010). "Analytical Study on Contractual Issues and Risk Allocation in Design-Build and Turnkey" Journal of the Architectural Institute of Korea, AIK, 26(8), pp. 79-86.
7 Kim, J. H., and Kim, Y. S. (2014). "A Analysis of Concentrate Competency in Bidding Process for Overseas Project of Domestic Construction Companies" Korean Journal of Construction Engineering and Management, KICEM, 15(3), pp. 23-30.
8 Kim, J. W. (2015). "Identifying Risks of Power Plant EPC Business in the Middle East and Analyzing their Priority by the AHP" MS thesis, Hanyang University.
9 Kim, W. Y. (2013). "A Search for Alternatives and Analysis of Factors by worsening profitability in Oversea Project" CERIK Journal, 2013-12, CERIK, pp. 11-13.
10 Lee, J. H. (2008). "Application of Statistics and Survey Method using SPSS." Gongdongche, p. 374.
11 Lee, J. W. (2014). "Improvement of the Tendering Process for Power Plant Projects with Risk Mitigation Strategies" MS thesis, Pohang University of Science and Technology.
12 Noh, S. Y. (2006). "Delphi Technique : Forecasting th Future with by technical insight" Planning and policy, KRIHS, 299, pp. 53-62.
13 Park, Y. S. (2012). "A Strategy for Effective Risk Management of Overseas EPC Project" MS thesis, Pukyong National University.
14 Project Management Institute (PMI) (2008). Project Management Body of Knowledge(PMBOK Guide) Fourh Edition, PMI, USA, pp. 291-292.
15 Richard T. Fria (2003). "Successful RFPs in Construction: Management the Request for Proposal process." McGraw, pp. 1-172.
16 Rita Mulcahy (2003). "Risk Management - Tricks of the Trade for Project Manager." RMC Publication, Inc., pp. 105-121.
17 Yang, J. W. (2011). "The study on strategic plan to improve construction competitive power through cause analysis on failures in contract award for overseas construction projects" MS thesis, Korea University.
18 Yeum, S. C. (2015). "Analysis of BIdding and Estimating Process for Overseas Plant Projects and Tools Application: EPC Contractor's Perspective" MS thesis, Pohang University of Science and Technology.
19 Yoo, U. S. (2012). "A study on Development of Customized Risk Management Model in Overseas Project" CERIK Journal, 2012-12, CERIK, pp. 35-37.
20 Yun, S. H., Yu, J. H., Cho, H. H., and Jang, H. S. (2015). "A Study on Strategies of Small and Midsize Construction Companies for Joint Overseas Expansion" Journal of the Architectural Institute of Korea, AIK, 31(5), pp. 97-104.   DOI