• 제목/요약/키워드: IS project performance

검색결과 2,235건 처리시간 0.038초

Investigation of Key Factors to measure on-site Performance of a Construction firm

  • Lee, Young-Dai;Kim, Jung-Ki;Acharya, Nirmal Kumar
    • 한국건설관리학회논문집
    • /
    • 제8권6호
    • /
    • pp.246-262
    • /
    • 2007
  • The performance of projects has always been an area of interest in the construction industry. Roles of all construction supply chain partners are necessary; however the role of a contractor firm in the construction project is pivotal. So, this research intended to explore a Construction Firm's performance criteria which could measure the level of performance of that firm in an ongoing project. Data was collected from construction professionals working in three principal project participant organizations, namely Owner, Consultant and Contractor. A total of 113 nos. of performance measuring items were sorted from literature review and used to collect data. Statistical tools processed by SPSS program was employed to analyze the data. Out of total 113 items, only 65 nos. of variables were found to be acceptable to every population group of this study. Factor analysis revealed 12 key performance predicting factors (KPPF) with 53 predictive indicators. 12 KPPFS with index weight are: work progress and smoothening (9.3%), change order management and work accuracy (9.1%), business relationship building (8.1%), adequacy of construction work procedure (8.6%), quality performance (8.0%), health and site safety adequacy (8.8%), Innovative contractor (8.0%), adequacy of construction site information (6.8%), compliance with contract plan/specification requirements (8.9%), creditworthiness and financial capability (8.3%), intra-agency relationship and responsiveness (7.0%) and resource management (9.2%). These results could be useful to project management body to evaluate performance of its contractor firm on site as well as the contractor itself to assess own performance and its subcontractors on-site.

서포트벡터머신을 이용한 교육시설 초기 공사비 예측에 관한 연구 (A Study on Predicting Construction Cost of Educational Building Project at early stage Using Support Vector Machine Technique)

  • 신재민;김광희
    • 교육녹색환경연구
    • /
    • 제11권3호
    • /
    • pp.46-54
    • /
    • 2012
  • The accuracy of cost estimation at an early stage in school building project is one of the critical factors for successful completion. So various of techniques are developed to predict the construction cost accurately and expeditely. Among the techniques, Support Vector Machine(SVM) has an excellent ability for generalization performance. Therefore, the purpose of this study is to construct the prediction model for construction cost of educational building project using support vector machine technique. And to verify the accuracy of prediction model for construction cost. The performance data used in this study are 217 school building project cost which have been completed from 2004 to 2007 in Gyeonggi-Do, Korea. The result shows that average error rate was 7.48% for SVM prediction model. So using SVM model on predicting construction cost of educational building project will be a considerably effective way at the early project stage.

Earned Schedule 개념을 활용한 국방 연구개발 사업진도 기법의 일정 관리 및 예측 기능 연구 (Research of Schedule Managing and Forecasting for Project Progress Method in Defense Research & Development using Earned Schedule Concept)

  • 조정호;류상철;임재성
    • 한국군사과학기술학회지
    • /
    • 제22권4호
    • /
    • pp.567-574
    • /
    • 2019
  • Traditional project progress method(PPM) has been used for Korean defense research and development project management for the last 20 years. However, it is difficult to intuitively understand the performance in terms of the project schedule, because the PPM does not provide the function of managing and forecasting project schedule. Therefore, this paper proposes new schedule managing and forecasting function for the PPM using earned schedule management concept. We verify the effectiveness of the proposed functions through several defense projects and prove that it is possible to reinforce the schedule management function of the PPM.

Stochastic Scheduling for Repetitive Construction Projects

  • Lee, Hong-Chul;Lee, Dong-Eun
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.166-168
    • /
    • 2015
  • Line of Balance (LOB) method is suitable to schedule construction projects composed of repetitive activities. Since existing LOB based repetitive project scheduling methods are deterministic, they do not lend themselves to handle uncertainties involved in repetitive construction process. Indeed, existing LOB scheduling dose not handle variability of project performance indicators. In order to bridge the gap between reality and estimation, this study provides a stochastic LOB based scheduling method that allows schedulers for effectively dealing with the uncertainties of a construction project performance. The proposed method retrieves an appropriate probability distribution function (PDF) concerning project completion times, and determines favorable start times of activities. A case study is demonstrated to verify and validate the capability of the proposed method in a repetitive construction project planning.

  • PDF

자료포락분석 기법을 이용한 지역산업 기술개발 사업의 파급효과 분석 (Ripple Effect Analysis of Regional Industry Technology Development Using DEA)

  • 이상현;김상영;이상준
    • 디지털융복합연구
    • /
    • 제9권6호
    • /
    • pp.1-11
    • /
    • 2011
  • 지식정보화 시대에 변화의 원천이 되는 기술개발에 대한 투자 방향에 대한 검토가 필요한 시점이다. 자료포락분석(DEA) 기법은 투입요소와 산출요소의 비율을 기준으로 효율성을 분석하는 기법이다. 본 논문에서는 국내 지역산업기술개발사업의 파급효과 분석을 위해 산업연관성과 효율성을 DEA를 사용하여 분석하였다. 분석 결과에 의하면, 사업의 성과에 영향을 마치는 주요인은 기술개발 참여인력이고, 매출액의 변화는 가시적으로 실현되지 못하고 있었다. 사업 유형별로는 공통기술 개발사업에 비해 중점기술 개발사업의 효율성 지수가 높게 나타났는데, 이는 사업 기간이나 사업비의 규모가 사업성과에 중요한 영향을 미치는 것으로 분석되었다. 앞으로 지역산업 기술 개발 사업은 기술 개발인력과 사업기간이나 사업비 규모의 확충이 요구되며 기술개발의 결과가 매출이나 고용 증가와 같은 성과로 나타날 수 있게 하는 노력이 필요하다.

연구개발팀의 환경 성숙도 및 인지적 다양성과 정서적 수용이 연구개발 성과에 미치는 영향 (The Effect of Environmental Maturity, Cognitive Diversity and Affective Acceptance on the Performance in the R&D Team)

  • 박경환
    • 기술혁신연구
    • /
    • 제13권1호
    • /
    • pp.141-167
    • /
    • 2005
  • The purpose of this study is to present the model of performance in new product R&D project team, from the perspective of the problem solving. The quality and commitment of the problem solutions in R&D project team depend on the team's cognitive diversity and affective acceptance. The higher cognitive diversity is, the higher quality of solutions is. And more affective acceptance is, more commitment to the problem solving is. The environmental maturity of team, and quality and commitment of problem solutions in R&D project teams are supposed to relate to the performance of research and development.

  • PDF

철도건설사업의 효율적인 VE수행을 위한 성능측정기법 (Performance Measurement Method for Efficient Value Engineering Study of Railroad Construction Project)

  • 임종권;박미연;박흥민;김성훈;이광균
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2008년도 춘계학술대회 논문집
    • /
    • pp.2242-2249
    • /
    • 2008
  • A severe problem in VE study of a project is to reduce value due to loss of performance, caused by focusing on cost reduction. Also a lack of understanding performance concept, no trial VE workshop as well as cost saving-based policy have not satisfied customer needs. A efficient VE job plan for especially large scale railroad construction project is proposed in this study. This study developed a more objective performance evaluation system for value engineering study of mega projects and suggested a systematic process of performance quantitative analysis for value improvement. The proposed performance measurement method would be very useful for better communication and consensus between decision makers and VE team.

  • PDF

기술지주회사 연구동향과 기업성과 향상을 위한 제언 : Project Management Office(PMO) 도입을 중심으로 (Research Trends of Technology Holding Companies and Suggestions for improving Corporate Performance : Focusing on the introduction of PMO)

  • 이강오;이찬호
    • Journal of East Asia Management
    • /
    • 제4권1호
    • /
    • pp.53-77
    • /
    • 2023
  • Modern company faces an uncertain future and a competitive environment and are seeking new technologies and creative products to ensure the corporate growth and survival in the market through continuous innovation. "University Industry Cooperation(UIC)" is a point of contact for overcoming the crisis faced by companies and universities in this era and a cooperation platform for mutual prosperity. As a subsidiary of a university, "Technology Holding Company(THC)" is attracting attention as a new window for UIC in Korea. The role of THC is to establish and foster the business opportunities of their subsidiaries and to return investment profits to the university ecosystem again. But recently, the life cycle of technology is getting shorter, and the development cost is steadily increasing. In particular, with the increase of hybrid projects based on convergence and combination, the risk of conducting research(R&D) and new product development(NPD) projects is gradually increasing. A PMO refers to a project management organization that can contribute to improving the success rate of projects with increasing uncertainty by supporting project visibility and appropriate decision-making. The purpose of this study is to raise a research question on whether THC's corporate performance can be improved when "Project Management System(PMO Service)" is introduced into the subsidiary incubation system of THC. This study proposes several research methods to identify the relationship between the introduction of PMO and the corporate performance of THC.

A Study on the Effect of Satisfaction with R&D Projects on R&D Performance Satisfaction -For SMEs in Jeollanamdo-

  • Choi, Hong Wan;Kang, Min Jung
    • International Journal of Internet, Broadcasting and Communication
    • /
    • 제13권1호
    • /
    • pp.11-19
    • /
    • 2021
  • The purpose of this study is to check whether the satisfaction of the R&D (Research & Development) project directly affects the R&D performance, and to find out whether the satisfaction with regional connectivity and the satisfaction with the R&D operation management significantly mediate the relationship that the satisfaction with the R&D project has on the R&D performance. In order to verify the research hypothesis on this, a total of 51 companies located in Jeollanam-do that actually conducted R&D research projects were surveyed and analyzed. In order to conduct an empirical study based on the collected questionnaire, a survey questionnaire related to the variables of the study model was composed based on a sample of 51 questionnaires. We used the SPSS program to verify the hypotheses in this study, and the hypotheses were verified by analyzing the validity, reliability, correlation, and deflection. As a result, there was a positive (+) significant relationship between R&D project satisfaction and R&D performance. In addition, it was found that the relationship between R&D project satisfaction and R&D performance was significantly mediated by the satisfaction with R&D regional connectivity and satisfaction with R&D project operation management.

해외건설 프로젝트의 성공적 수행을 위한 위험요소 및 대처방안에 대한 연구 - 해외건설 사례분석을 포함하여 - (A Study on Risk Analysis and Relevant Measures for the Successful Performance in Overseas Construction Projects - Including Case Analysis on A Overseas Construction Project -)

  • 김상만
    • 무역상무연구
    • /
    • 제50권
    • /
    • pp.215-250
    • /
    • 2011
  • Korean won overseas construction projects worth 71.6 billion US Dollars in 2010, which exceeded that of 2009 by 45.6%. An overseas construction project is a transaction of large scale, long term project, many parties participating, deferred payment, and of high-technology. It contributes to foreign currency earning, and also leads the nation's export restructuring work towards high value-added one. There are various kinds of risks towards the relevant parties respectively, which are key elements in successfully performing the overseas construction project. There are completion risk, financing risk, operating risk, revenue risk etc, in an employer's place. A contractor may be confronted with payment risk, issuance risk of performance bond, financing risk, performance risk of sub-contractors, and exchange rate risk. In lenders place there are repayment risk, completion risk, and political risk in the host country. In order to mitigate risks, the parties shall take relevant measures or require relevant securities. A contractor needs to evaluate the credibility of an employer in respect of payment risk, and can also request export insurance cover by the Korea Trade Insurance Corporation(the former 'Korea Export Insurance Corporation"). An employer can require a contractor to provide performance bond in respect of completion risk, and employ a well-known first class bank as a mandated arranger to arrange financing with regard to completion risk. Lenders needs to evaluate the credibility of an employer and accomplish feasibility study of the project. Lenders can request insurance cover from export credit agency. Once the parties assess the respective risks and obtain relevant securities, the project will be successfully completed. The success of the project will be sure to bring the parties involved enormous profits and another opportunity to participate in overseas construction project afterwards.

  • PDF