• 제목/요약/키워드: IPD(Integrated Project Delivery)

검색결과 20건 처리시간 0.024초

국내 대학의 BIM 기반 IPD 교육 현황 분석에 관한 연구 (An Analysis of IPD Education Based on BIM in a Korean Universities)

  • 함미화;손정욱
    • 한국BIM학회 논문집
    • /
    • 제5권3호
    • /
    • pp.11-18
    • /
    • 2015
  • Integrated Project Delivery (IPD) is a new trend in the building industry and a key feature of IPD is the use of BIM to support project collaboration. Therefore, engineers should learn the use of BIM and IPD in the construction industry. In this study, the authors draw necessary components for developing an IPD course curriculum through analyzing a project case and current courses provided by universities in Korea. The authors make several suggestions for effective IPD education in universities.

IPD 도입을 위한 국내 건설기술자의 인식 분석 (An Analysis on the Perception of Domestic Construction Engineer to Introduce IPD)

  • 송설민;김예상;진상윤;권순욱
    • 한국건설관리학회논문집
    • /
    • 제12권2호
    • /
    • pp.72-80
    • /
    • 2011
  • 최근 건설 프로젝트의 원활하고 효과적인 사업관리를 위하여 발주방식의 효율화에 대한 관심이 증대하고 있으며, 방대한 양의 정보에 대하여 효과적으로 통합관리를 위한 건물의 생애주기를 고려한 통합적인 계획이 요구된다. 이를 위하여 프로젝트 초기부터 각 분야의 협업이 필수적이나 기존의 발주방식의 경우 설계업체와 시공업체가 분리되어 계약되는 한계가 있다. 최근 미국의 경우 사업관리의 효율성 증대를 위해 Integrated Project Delivery를 제시하였고 관련 프로젝트 수행 사례가 증가하고 있다. 이에 본 연구는 국내의 경우에도 통합적인 프로젝트 관리를 위한 IPD의 도입 필요성이 커짐에 따라 실질적 도입 이전에 IPD의 개념과 원칙을 바탕으로 하여 도출된 핵심가치를 중심으로 건설업종에 종사하는 실무자들의 건설환경에 대한 현황과 인식을 파악하여 IPD의 도입을 위한 제약요인들을 파악하는 것을 목적으로 향후 IPD 관련 연구의 기초자료로 활용될 것으로 기대된다.

비정형건축물의 IPD(Integrated Project Delivery) 도입 필요성 검토 (Necessity Review of IPD(Integrated Project Delivery) for Free-Form Building in Domestic)

  • 김성진;박성진;류한국
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2014년도 춘계 학술논문 발표대회
    • /
    • pp.308-309
    • /
    • 2014
  • A lot of very complex free-form buildings such as Seoul City Office and DDP(Dongdaemun Design Plaza) have been recently built nowadays in domestic. However, as construction methods and cost data are decided without enough discussion and collaboration with specialized subcontractors during design stage, construction quality problems and cost overrun of the free-form buildings are thus occurred during construction stage. Therefore design system and process or contract and ordering system should be developed participating the specialized subcontractors during design stage in order to perfect the free-form design and construction. Especially US has thus an effort to apply IPD(Integrated Project Delivery) system which can solve the problems of construction quality, productivity decrease and cost overrun by constructing the buildings based on exact drawings and collaboration as well as activating BIM(Building Information Modeling). Therefore this study reviews cases of the free-form buildings in domestic and then presents necessity review of IPD in domestic.

  • PDF

유닛모듈러주택의 시공효율화를 위한 수행체계 개선방향 연구 (A Study on the Project Delivery System Improvement for Construction Efficiency of the Unit Modular Housing)

  • 박남천;김균태;박수열;채명진
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2013년도 춘계 학술논문 발표대회
    • /
    • pp.265-267
    • /
    • 2013
  • Recently, It is being reduction to market of the domestic construction industry for the instability of the domestic market structure. So it is necessary to plan response measures for to ensure the competitiveness of the construction market of overseas. The purpose of the study is suggest of improvement of the project delivery system for the efficiency of the construction of the unit modular housing of considering the reducing cost and technological competitiveness of the domestic construction industry.

  • PDF

구성주의 학습 방법을 통한 BIM/IPD협업 학습효과에 대한 연구 (A Study on the Collaboration Learning Effect of BIM/IPD Through Constructivism Learning Method)

  • 진주완;최중식;김인한
    • 한국건설관리학회논문집
    • /
    • 제22권5호
    • /
    • pp.3-16
    • /
    • 2021
  • 이 연구의 목적은 구성주의 교육이론 기반의 BIM/IPD(통합프로젝트수행)교육에 적합한 BIM협업 교육모델제안과 그 교육모델의 효율성을 검증하는 것이다. BIM/IPD기반 협업능력은 건설 전 분야 걸쳐 필요한 역량으로 보고 있다. '구성주의 협업 프로세스' 교육 방식을 실험군(구성주의 협업프로세스)과 대조군(빌딩스마트 협회 BIM 코디네이터 과정)에 적용하여 학습 전후의 상호작용 과정에서 학습효과의 개선을 인지측정(협업의 만족도, 협업의 수준)하고 실무능력(협업고도화지수측정)측정을 통한 '구성주의 협업프로세스'의 학습효과를 검증하는 것이다.

Prioritization of Price Volatility Management Strategies in Construction Projects

  • Joukar, Alireza;Nahmens, Isabelina;Harvey, Craig
    • Journal of Construction Engineering and Project Management
    • /
    • 제7권3호
    • /
    • pp.15-25
    • /
    • 2017
  • The existence of material price volatility in construction projects puts forward substantial risks for all parties involved. Depending on the parties involved in the project, type of contracts, and state of the market various risk management strategies are practiced by contracting parties to manage project risks related to price volatility. Unfortunately, in many cases companies fail to select an adequate approach to better manage volatilities of material prices due to the lack of a decision support system to aid in the selection of an appropriate strategy based on the project characteristics. The aim of this study is to identify critical project factors and align them to documented strategies to manage price volatility based on an extensive literature review and industry interviews. This study found Integrated Project Delivery (IPD) as the ideal strategy with respect to project duration; quantitative risk management methods with respect to the cost; and Price Adjustment Clauses (PAC) with respect to the risk allocation, as the top price volatility management strategies.

BIM기반 설계프로세스의 전제조건에 관한 연구 (A study on the preconditions of BlM based design process)

  • 최종천;김길채
    • 한국디지털건축인테리어학회논문집
    • /
    • 제8권1호
    • /
    • pp.75-80
    • /
    • 2008
  • The purpose of this paper is to find the preconditions of BIM based new design process. As BIM technology improves, investigating new design process will become a greater priority. Our traditional, linear and fragmented design process is not freed from a long-pending questions of poorly coordinated drawings and low production efficiencies. Rather the traditional process is one of the major causes of such issues of low productivity. AIA and NIST proposed new design process to fulfill clients' need for fast and precise delivery recently. The common goal of these two should be better, faster and more precise project delivery created by integration. And we need to create collaborative concurrent design process to optimize the design efforts, But our local AE industry's circumstances are quite different with foreign countries. Therefore, integrated project system cannot be adopted as it stands in foreign countries. This paper will investigate preconditions to expedite the progress of BIM based design process in Korea.

  • PDF

A STUDY ON THE LEVEL OF DEVELOPMENT OF BUILDING INFORMATION MODELING DESIGN PROCESS

  • Khil Chae Kim
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.23-30
    • /
    • 2011
  • The people in the AEC industry have acknowledged and long struggled to solve the critical low productivity issue of the entire construction industry. Integrated Project Delivery has been suggested as a solution to this problem and to take this into practice many countries have come up with BIM guidelines. In order to make this a success, BIM design process and LOD must be dealt in advance. The following research has selected 3 out of 16 guidelines that specifically describes BIM process and LOD, and intends to fully acknowledge its concept by comparing the approach and definition of LOD in the BIM Design Process.

  • PDF

설계 프로세스를 반영한 BIM 작성 기준(LOD)에 대한 연구 (A Study of LOD(Level of Detail) for BIM Model applied the Design Process)

  • 조현정;김연수;마영균
    • 한국BIM학회 논문집
    • /
    • 제3권1호
    • /
    • pp.1-10
    • /
    • 2013
  • BIM(Building Information Modeling) ordering manuals and guidelines are diffused with the recent BIM activation. However, it is causing drawbacks such as an increase of work at each design stage and a decline of BIM application level that the standard of making up and managing BIM is vague and it includes comprehensive meaning. Therefore, this study aims to secure BIM work standard by establishing BIM making-out standard based on LOD(Level of Detail) classification considering domestic design process. It compared each definition of LOD by analyzing domestic and foreign BIM guideline examples, and figured out insufficiency of existing domestic and foreign design process and BIM guidelines. Moreover, it drew architects' work articles for promoting the progression of the efficient design process, and analyzed BIM requirements on design process, dividing BIM application scale by field. Through this analyzing process, it finally established BIM making-out standard classified by design process. The effects of establishing BIM making-out standard would include improving a division of labor and cooperation environment by creating integrated BIM model on design stages, advancing work efficiency by preventing a repetition and an increase of work, and upgrading project completeness and design quality. Besides, it can secure BIM work standard by clarifying responsibility for working steps. BIM making-out standard established by this study will contribute to developing the future BIM work standard document and BIM guideline as a data base.