Journal of The Korean Digital Architecture Interior Association (한국디지털건축인테리어학회논문집)
- Volume 8 Issue 1
- /
- Pages.75-80
- /
- 2008
- /
- 1738-0790(pISSN)
A study on the preconditions of BlM based design process
BIM기반 설계프로세스의 전제조건에 관한 연구
Abstract
The purpose of this paper is to find the preconditions of BIM based new design process. As BIM technology improves, investigating new design process will become a greater priority. Our traditional, linear and fragmented design process is not freed from a long-pending questions of poorly coordinated drawings and low production efficiencies. Rather the traditional process is one of the major causes of such issues of low productivity. AIA and NIST proposed new design process to fulfill clients' need for fast and precise delivery recently. The common goal of these two should be better, faster and more precise project delivery created by integration. And we need to create collaborative concurrent design process to optimize the design efforts, But our local AE industry's circumstances are quite different with foreign countries. Therefore, integrated project system cannot be adopted as it stands in foreign countries. This paper will investigate preconditions to expedite the progress of BIM based design process in Korea.