1 |
NIBS (2007), "National BIM Standard USA".
|
2 |
Ohio Department of Administrative Service (2011), "State of Ohio Building Information Modeling Protocol".
|
3 |
Seong, Joon-Ho (2011), "A Study on the Development of BIM Guideline", Korean Institute of BIM, Vol1 No2.
|
4 |
Kim, Bong-Kyu (2009), "A Study of the Level of Informationwhich Integrated Design Process for BIM application",Architectural Institute of Korea, Academic Conference Vol29 No1.
|
5 |
Jeong, Soo-Jin (2012), "A Study on Criterion Establishment of LOD for BIM Model in the Early Design Stage", Korean Institute of BIM, KIBIM Annual Conference 2012_Poster.
|
6 |
Choo, Seung-Yeon (2012), "A Study on LOD for Developmentof Green BIM Guidelines", Architectural Institute ofKorea, Vol28 No6.
|
7 |
AIA (2008), "AIA Document E202", American Institute of Architects.
|
8 |
Bae, Jung-Ik (2006), "A Suggestion for Design Process Improvement to Develop a Design Management Model", Korea Institute of Construction Engineering and Management, Vol7 No6.
|
9 |
BCA (2012), "Singapore BIM Guide_Version1", Building AndConstruction Authority buildingSMART Int'l (2010), "IDMfor Design to QTO / Cost Estimating" buildingSMARTKorea (2011), "The Development of BIM-based StandardLibrary".
|
10 |
Cooperative Research Centre (2009), "National Guideline forDigital Modeling".
|
11 |
Kim, Hong-Yong (2002), "An Approach to a SystematicProcess in Building Design Works", Architectural Instituteof Korea, Vol46 No9.
|
12 |
LH Corporation (2012), "BIM Guideline for Design", KoreaLand & Housing Corporation.
|
13 |
Ministry of Land, Transport and Maritime Affairs (2009),"Architect's Roll & Design Fee Standard in the PublicConstruction Project Delivery", 2009 No129.
|