• Title/Summary/Keyword: IDEF0 모델

Search Result 23, Processing Time 0.03 seconds

IDEF0 Business Process Modeling for a Shopping Mall (쇼핑몰 구축을 위한 IDEF0 업무 프로세스 모델링)

  • Jeon, Tae-Bo;Jung, Jae-Ho
    • Journal of Industrial Technology
    • /
    • v.24 no.A
    • /
    • pp.47-57
    • /
    • 2004
  • Industrial efforts for increased market sales have directed towards the development and implementation of on-line marketing systems under recent e-business environment. Internet-based shopping mall is one of the most popular system. A business process model for an intermediary type shopping mall using IDEF0 has been presented in this study. Specific efforts have been focused on defining and analyzing a diversity of business processes embedded in practical B2B and B2C mall system operations. We first briefly examined the considered system with IDEF0 design. We then defined fundamental business processes within shopping mall systems. Upon careful examination and analysis of them, a detailed business process model based on IDEF methodology has been designed. The results in this study may well form a conceptual framework for shopping mall development and operations.

  • PDF

An Implementation Methodology and Prototyping for Manufacturing CALS/EC System Using IDEF0 and IDEF1X (IDEF0 모델과 IDEF1X 모델의 연계를 통한 제조업 CALS/EC 시스템 구축 방법 및 프로토타입 구현)

  • Kim, Soung-Hie;Lee, Jae-Kwang;Han, Chang-Hee;Cho, Yoon-Ho
    • IE interfaces
    • /
    • v.10 no.3
    • /
    • pp.95-107
    • /
    • 1997
  • In this paper, we suggest the system analysis method that integrate IDEFO and IDEFIX. Based on the method, we propose the procedure which can be used to build CALS/EC system in manufacturing industry. Also, applying the procedure and method to electronic company, we construct the CALSEC prototype system. With the three types of view-point, process, information technology and standard, we proceed the implementation of CALS/EC in manufacturing industry. We divide the electronic company's process into five core process, 1)processes-product concept planning process. 2)product development process, 3)procurement process, 4)delivery/distribution process and 5)customer service process.

  • PDF

A Process Model of Eco-friendly Demolition Work for Wall Type Aged Housing Remodeling (친환경 리모델링 철거공사 프로세스 모델 (벽식구조 노후 공동주택을 대상으로))

  • Hwang, Young-Gyu;Kim, Ki-Hyun;Kim, Kyung-Ra;Han, Ju-Yeoun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.6
    • /
    • pp.204-215
    • /
    • 2008
  • Demolition work is a precedence activity that is performed earlier than other remodeling activities. And demolition work is one of the critical path activities. So, demolition work is needed for systematic plan and management. However, contractors of the remodeling project established a rough plan and did not consider recycling wastes, safety of workers and structural stable of building. To improve this problem, a eco-friend process model of remodeling project is needed to be established. The process model is composed of five phases; 1) survey and analysis of general condition of demolition work, 2) prepare documents of demolition work 3) establishing demolition work plan, 4) demolition and inspection, 5) post-demolition management. Especially, demolition documents are based on establishing WBS, selecting the equipment and method, waste management and structure reinforcement. A process model of eco-friend demolition work is developed by using IDEF0 method.

Development a Process Model of Environment-friendly Demolition Works for Aged Housing Remodeling (친환경 리모델링 철거공사 프로세스 모델 개발)

  • Hwang, Young-Gyu;Kim, Kyung-Rai
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.85-92
    • /
    • 2008
  • Demolition work is a precedence activity that is performed earlier than other remodeling activities. And demolition work is one of the critical path activities. So, demolition work is needed for systematic plan and management. However, contractors of the remodeling project established a rough plan and did not consider recycling wastes, safety of workers and structural stable of building. To improve this problem, a eco-friend process model of remodeling project is needed to be established. The process model is composed of five phases; 1) survey and analysis of general condition of demolition work, 2) prepare documents of demolition work 3) establishing demolition work plan, 4) demolition and inspection, 5) post-demolition management. Especially, demolition documents are based on establishing WBS, selecting the equipment and method, waste management and structure reinforcement. A process model of eco-friend demolition work is developed by using IDEF0 method.

  • PDF

Development of Management Systems based on IDEF3 Modeling to Improve Owner's Competency of Implementing Green building Certification (친환경건축물인증 발주자업무 수행역량 제고를 위한 IDEF3 모델기반 관리체계 구축)

  • Park, Kyung-Rog;Yi, June-Seong
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.1
    • /
    • pp.52-62
    • /
    • 2013
  • Owners' efforts to acquire Green building certification, which started in 2002, have been rapidly increasing since 2006. The causes of the increased owners' interests are due to various incentives, legal obligation, and purpose of advertising. As project owners generally are deficient in capabilities and knowledge on how to deal with administrative works on certification, they tend to fulfill the minimum requirements for certification. However, effective administration process need capabilities of identifying individual making decision point and review information. The implementation of green building certification system is expected to provide comfort to both occupants and potential users. Furthermore it contributes to reducing energy costs throughout the phase of O&M. In addition, technology innovation in green industry can be obtained. Therefore, this study is intended to support owners in order that they can clarify certification tasks and make a rational decision-making in time. For this purpose, first of all, the major decision points were selected as the gateways of green building certification process. And then management system based on IDEF3 modeling was developed for supporting owners' decision-making performance. This management system will improve owners' overall capacity in handling all the tasks regarding the certification of Green building.

IDEF0 Models of the FCIM System for CALS Implementation (CALS구현을 위한 FCIM 시스템의 IDEF0 모델)

  • 김중인
    • The Journal of Society for e-Business Studies
    • /
    • v.1 no.2
    • /
    • pp.117-131
    • /
    • 1996
  • This paper presents the results of the systems analysis for the FCIM (Flexible Computer Integrated Manufacturing) system at the U.S. Tobyhanna Army Repair Depot, which is one of the RAMP (Rapid Acquisition of Manufactured Part) program sites for CALS implementation in the U.S. military. The FCIM system's acquisition and supply processes are represented by IDEFO function models and FCIM information systems are briefly decribed in this paper. The models presented here can be used at a reference for the development of CALS acquisition and supply systems. In addition. the distinction between input and control information on the IDEFO model it suggested from the practical modeling viewpoint.

  • PDF

A Study on the Improvement Method of Construction Management for PHC Pile in an Apartment House (공동주택 PHC 파일 공사관리 개선방안에 관한 연구)

  • Yoo Jae-Wook;Kim Tae-Hui;Kim Sun-Kuk;Han Choong-Hee
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.244-247
    • /
    • 2002
  • The pile foundations have been chosen more frequently as the comprehensive development of the country progressed, especially where the ground conditions are not suitable for the construction and the dimension and the length of the piles utilized becomes larger and longer. The purpose of this study suggests the improvement method of construction management for PHC pile in an apartment house. To do This, We analyzed about current process and provided improved Process with IDEF method. And, The objectives of this research is to propose the means to solve the current problems and management factors from the results of the investigation.

  • PDF

A Model on the Feasibility Analysis for the Apartment Reconstruction (재건축사업의 타당성분석 절차의 모델링)

  • Jung Jung-Man;Kim Soo-Yong
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.460-464
    • /
    • 2003
  • A reconstrucion project is very complex and requires technical knowledges and experiences, however due to not having any related knowledge consortium usually does not have any related knowledge. So in this study, we have suggested a systematic procedure to execute a reconstruction project focused on the profitability analysis. a model is developed to identify and calculate all relevant cost and revenue to the project using the IDEF0 methodology.

  • PDF

Developing an Assortment Planning Process Model for Clothing Retail Buyers: An Exploratory Research

  • Kang, Keang-Young;Kincade, Doris H.
    • Fashion & Textile Research Journal
    • /
    • v.6 no.6
    • /
    • pp.815-824
    • /
    • 2004
  • In academic and/or practitioner literature, the assortment planning for fashion sensitive products is rarely systematically studied, and organized in an objective format. The purpose of this study was to develop a suggested assortment planning model for women's clothing retail buyers by integrating a conceptual assortment planning model and a practical-use assortment planning model, which are also developed in this study. In developing the conceptual model, this research categorized and organized the pieces of assortment planning activities illustrated in available literature. In developing the practical-use model, ten women's dress buyers from department stores and specialty stores were interviewed. The contents of the interview dictation were classified and summarized by concepts and variables. The summary was validated by the interviewees and recontextualized for the practical-use model. Five experts compared the conceptual and practical-use models, adjusted the discrepancies, and integrated into the suggested model. In addition, a questionnaire asking review of all functional activities of the suggested model was sent to interviewees to ascertain its validity. As the result, assortment planning process was determined at abstract level as the following: (a) recognize problem, (b) search for information, (c) evaluate qualitative value of product, (d) evaluate quantitative value of product, (e) plan product selection, and (f) plan sales.

Design and Application of the Warfighting Experiment Process Using the Intelligent Maturity Model in Software Intensive Systems (지능형 성숙도 모델을 이용한 소프트웨어 집약 시스템의 전투실험 프로세스 설계 및 적용)

  • Kang, Dong-Su;Yoon, Hee-Byung
    • Journal of the Korean Institute of Intelligent Systems
    • /
    • v.17 no.5
    • /
    • pp.668-673
    • /
    • 2007
  • We propose the design of the warfighting experiment process for software intensive systems using the intelligent maturity model and suggest the application results of the target searching capability in smart UAV. For this, we design the intelligent maturity model to evaluate the intelligent degree of the software intensive systems considering the domain and intelligent level. Then we classify the IS0/1EC-12207 process and CMMI process as LITO domain for designing the warfighting experiment process, map the classifed process to the five factors of the warfighting experiment and derive the process as warfighting experiment element and phase. Based on the derived process, we design the warfighting experiment process using the IDEF0. Finally we apply the proposed process to the target search capability and suggest the results which are required to develop and acquire the smart UAV.