• 제목/요약/키워드: FMEA기법

검색결과 65건 처리시간 0.027초

Blue Print와 신뢰성 기법을 혼합한 고객만족도 향상에 관한 연구: 교육서비스 사례 (Customer Satisfaction Improvement by Combining the Blue Print and Reliability Technique: Education Service Case Study)

  • 백천주;구일섭;임익성;권홍규
    • 한국신뢰성학회지:신뢰성응용연구
    • /
    • 제12권1호
    • /
    • pp.13-24
    • /
    • 2012
  • This paper applied the Blue Print and FMEA (Failure Mode and Effect Analysis) to education service in order to raise the education service satisfaction. First, the Blue Print is deployed to come up with strategies to overcome the fail possibility point and waiting point. Next, in order to analyze the fail factors and alternative strategies, the Blue Print of education service is applied to FMEA. The results are as follows; first, the ommission from information document by web-mail or e-mail, Second, thing that selected in spite of company uneducated, thing that omitted despite the company is target, and the unsatisfaction of attendee about training contents. Third, the delay of counsel at the telephone reply, erroneous list of course name and attendee at HRD (Human Resource Development), omission of check whether attends or not. Except for unsatisfaction of attendee, all appears at the process that service delivered. And the unsatisfaction of attendee is about education contents. Both is the factor which have influence on the education service quality. The strategies to remove the failure mode are training and manual development on service and work, a thorough management and check of information system like as ERP (Enterprise Resoure Planning), HRD, education institution list DB (Data Base), on-line application system, a development of education program to offer best education that reflect the user needs and continuously changing environment.

소프트웨어 안전성 평가를 위한 소프트웨어 고장 유형과 영향 분석에 관한 연구 (A Study on the Software Fault Modes and Effect Analysis for Software Safety Evaluation)

  • 김명희;박만곤
    • 한국멀티미디어학회논문지
    • /
    • 제15권1호
    • /
    • pp.115-130
    • /
    • 2012
  • 오늘날 대다수의 안전필수 시스템들(Safety-Critical Systems)에는 컴퓨터, 전기 및 전자 부품이나 장치들에 소프트웨어를 칩에 내장하거나 제어용 소프트웨어 시스템이 탑재되어 구축되고 있다. 이에 따라, 컴퓨터 소프트웨어를 내장하였거나 탑재한 시스템들의 안전성을 평가하기 위한 여러 가지의 결함 분석 기법들이 제안되어져 오고 있다. 이러한 소프트웨어 결함 분석 기법들은 전통적으로는 하나의 안전필수 시스템을 분석하는데 단지 하나의 방법으로만 분석해 왔으나, 시스템의 종류와 특성이 다양해지면서 그 시스템에 가장 알맞은 결함 분석 기법이 동원되어야 함은 필수적이다. 본 연구에서는, 안전필수 시스템에서 소프트웨어의 크기가 비교적 작고, 안전성과 관련한 시스템 제어 반응 시간이 특별히 민감하지 않는 소프트웨어의 안전성을 평가하는 방법으로 결함트리 분석(FTA)과 소프트웨어 고장 유형 및 영향 분석(FMEA)을 결합한 시스템 결함 분석 방법을 제안하고 유비쿼터스 헬스케어 시스템을 이용하여 사례연구를 수행하고자 한다.

기술현황분석 - 하이브리드 굴삭기 동력전달계 주요부품의 신뢰성 평가기술 개발

  • 박종원;정동수;김형의
    • 기계와재료
    • /
    • 제23권3호
    • /
    • pp.190-198
    • /
    • 2011
  • 하이브리드 굴삭기는 에너지 재생 및 연비향상을 위하여 기존의 유압부품들 중 일부를 전기부품으로 대체하여 시스템을 구성하고 있다. 따라서, 하이브리드 굴삭기의 신뢰성을 평가하고 보장하기 위해서는 기계적인 부하와 전기적인 부하가 복합적으로 영향을 미쳐 발생되는 고장모드를 고려하여 신뢰성평가기법을 개발하여야 한다. 특히 하이브리드 굴삭기는 가혹한 실외 환경조건에서 운용되므로 새롭게 개발되는 부품들에 대하여 설계 결함을 조기에 발견하기 위한 복합 내환경 시험과 초가속 수명시험이 수행되어야만 한다. 본 연구에서는 FMEA, FMECA, FTA 및 HALT 등의 다양한 신뢰성 기법을 사용하여 하이브리드 굴삭기의 신뢰성평가기법을 개발하였고, 개발대상 하이브리드 굴삭기의 주요 동력전달 파트인 선회구동 시스템에 대한 신뢰성평가장비를 개발하고 구축하였다. 본 연구에서 개발된 하이브리드 굴삭기 신뢰성평가기법은 하이브리드 자동차의 부품들에 대한 신뢰성평가에도 유용하게 사용될 수 있을 것으로 기대된다.

  • PDF

기계설계 과정의 신뢰성 향상을 위한 혼합 기법 응용: 사례연구 (Application of the Combined Techniques for Reliability Improvement on Machine Design Process: Case Study)

  • 최장진;임익성;구일섭;박성준;김태성
    • 한국신뢰성학회지:신뢰성응용연구
    • /
    • 제14권1호
    • /
    • pp.71-80
    • /
    • 2014
  • In the mechanical design process various types of errors are bound to occur. In order to prevent such mechanical malfunctions and decrease number of instances of errors, various technique are utilized. The purpose of this research is to demonstrate the effectiveness of the combined service Blueprint and FMEA (Failure Mode and Effect Analysis) by applying such method to machine process. The results are as follows: First, modification can be obtained by discovering the failure mode hidden within the inner side of the blueprint. Second, issues within the company are found when conducting the machine design process that is not visible from the outside. Therefore, potential errors can be effectively resolved by preventing failure mode in advance and eventually high quality of the product could be obtained as well as its reliability.

민간 CM사업 시공이전단계 CM성과 저해요인 분석 (Barriers of CM Performance during Pre-Construction Stages in Private CM Projects)

  • 한재훈;김한수
    • 한국건설관리학회논문집
    • /
    • 제18권4호
    • /
    • pp.17-26
    • /
    • 2017
  • CM시장의 지속적인 발전은 CM성과에 대한 발주자의 수용을 전제로 하고 있으며, 이는 CM성과 향상을 위한 CM기업의 역량과 노력을 요구한다. 이를 위해서는 CM성과 향상을 저해하는 요인을 이해하고 이를 극복하기 위한 노력이 전제되어야 한다. 본 연구의 목적은 FMEA(Failure Mode and Effect Analysis)기법을 활용하여 민간 CM사업의 시공이전단계를 중심으로 CM성과 저해요인을 발굴하여 주요 특징을 분석하고 시사점을 제시하는데 있다. 본 연구를 통해 도출된 주요 결과는 CM성과 저해요인 해소를 통한 CM성과 향상을 위해서는 발주자와 CM사업자의 개별적인 노력과 협력적인 노력이 함께 경주되어야 한다는 것을 시사하고 있다.

원자력 발전소 주제어실 인터페이스 설계를 위한 인적오류 분석 기법의 보완 (A Modification of Human Error Analysis Technique for Designing Man-Machine Interface in Nuclear Power Plants)

  • 이용희;장통일;임현교
    • 대한인간공학회지
    • /
    • 제22권1호
    • /
    • pp.31-42
    • /
    • 2003
  • This study describes a modification of the technique for human error analysis in nuclear power plants (NPPs) which adopts advanced Man-Machine Interface (MMI) features based on computerized working environment, such as LCOs. Flat Panels. Large Wall Board, and computerized procedures. Firstly, the state of the art on human error analysis methods and efforts were briefly reviewed. Human error analysis method applied to NPP design has been THERP and ASEP mainly utilizing Swain's HRA handbook, which has not been facilitated enough to put the varied characteristics of MMI into HRA process. The basic concepts on human errors and the system safety approach were revisited, and adopted the process of FMEA with the new definition of Error Segment (ESJ. A modified human error analysis process was suggested. Then, the suggested method was applied to the failure of manual pump actuation through LCD touch screen in loss of feed water event in order to verify the applicability of the proposed method in practices. The example showed that the method become more facilitated to consider the concerns of the introduction of advanced MMI devices, and to integrate human error analysis process not only into HRA/PRA but also into the MMI and interface design. Finally, the possible extensions and further efforts required to obtain the applicability of the suggested method were discussed.

전자의료기기용 소프트웨어의 신뢰성 평가 방법 (Reliability Evaluation Method of Software for Electronic Medical Devices)

  • 박순옥;양해술
    • 한국산학기술학회논문지
    • /
    • 제8권4호
    • /
    • pp.758-767
    • /
    • 2007
  • 오늘날 의료기기는 내장된 소프트웨어에 의해 제어되는 전자 의료기기의 형태로 급격하게 발전하고 있다. 따라서 전자 의료기기의 품질은 내장된 의료용 소프트웨어의 품질에 의해 크게 좌우될 수밖에 없다. 특히, 의료기기가 인간의 생명과 밀접하게 연관되어 있다는 점을 고려할 때, 프로그램 가능한 전자 의료기기의 품질 측면에서도 신뢰성 측면을 특히 고려한 평가 방법이 연구되어야 할 것으로 생각된다. 본 논문에서는 소프트웨어 제품평가에 관련된 국제표준인 ISO/IEC 9126과 ISO/IEC 12119를 기반으로 하여 국내의 프로그램 가능한 전자 의료기기의 특성을 고려하여 신뢰성에 대한 평가를 위한 방법을 구축하고 아울러 신뢰성 평가 방법인 FMEA 기법을 적용할 수 있는 체계를 구축하였다.

  • PDF

6$\sigma$ 시그마 설계에 관한 고찰

  • 박성현
    • 한국기술혁신학회:학술대회논문집
    • /
    • 한국기술혁신학회 2000년도 춘계학술대회
    • /
    • pp.260-277
    • /
    • 2000
  • 최근 미국의 모토롤라(주)에서 시작된 6 시그마(Six Sigma) 경영이 우리나라의 기업들에게 큰 관심의 대상이 되고 있다. 이 논문은 6 시그마 중에서 설계 및 개발분야에 사용되는 6$\sigma$ 설계(Design for Six Sigma: DFSS)에 관하여 고찰하여 보는 논문이다. 6 시그마에 관한 많은 이론이 나와 있으나 아직 DFSS에 관해서는 매우 미약한 편이다. 이 논문에서는 먼저 DFSS의 정의, DFSS 프로세스의 단계, DFSS의 로드맵 등을 먼저 다루고, 다음으로 DFSS에서 사용되는 각종의 과학적 관리기법들(품질기능전개, Scorecard, FMEA, TRIZ, 다구찌설계 등)에 대하여 간단히 기술하기로 한다. 마지막으로 DFSS의 실무적용방법을 제안한다.

  • PDF

게이트 도장 품질 개선을 위한 6시그마 프로젝트 (A Six Sigma Project for Improving Gate Painting Quality)

  • 홍성훈;최익준
    • 한국경영과학회:학술대회논문집
    • /
    • 대한산업공학회/한국경영과학회 2004년도 춘계공동학술대회 논문집
    • /
    • pp.500-504
    • /
    • 2004
  • 본 논문에서는 한 중소기업을 상대로 진행된 게이트 도장 품질 개선을 위한 6시그마 프로젝트 과정을 소개한다. 프로젝트는 6시그마 개선활동의 로드맵인 DMAIC 절차를 따라 진행하였다. 먼저 Define 단계에서는 고객요구사항 파악을 위해 VOC 기법을 활용하여 CTQ를 선정하였다. Measure 단계에서는 프로세스 맵, 특성요인도, XY 매트릭스, FMEA등을 이용하여 주요 인자들을 규명하였다. Analyze 단계에서는 상관분석, ANOVA, 그래프 분석 등 각종 통계적 기법을 활용해 핵심입력변수인 'Vital Few's'를 규명한 후, Improve 단계에서 DOE를 통한 최적조건을 도출하였다. 또한 Control 단계에서는 최적조건을 유지하기 위한 관리계획 및 실수방지, 표준화 기법을 도입하였다. 이러한 개선 활동을 통해 개선 전 2.957 시그마 수준의 품질을 3.66 시그마 수준까지 높일 수 있었으며, 6천 3백만원의 비용절감을 할 수 있었다. 또한 본 논문에서는 중소기업에서의 프로젝트 진행의 문제점을 제시하였고, 그 해결방안에 대해서도 논하고자 한다.

  • PDF

E.P.B(Earth Pressure Balance) Shield TBM 공사의 공기지연 사례연구 (A Case Study of Delay Analysis for E.P.B Shield TBM Method in Construction Site)

  • 곽준환;박형근
    • 대한토목학회논문집
    • /
    • 제29권6D호
    • /
    • pp.737-743
    • /
    • 2009
  • 터널 공사에 있어서 Shield TBM 장비의 활용이 증가함에 따라 Shield 공법의 효율성 증대를 위한 다양한 연구 또한 수행되어졌다. Shield TBM에 대한 연구들은 대부분 굴착 대상이 되는 지반의 특성을 고려하여 Shield TBM 장비 선정, 굴진속도 계산, 모델식 개발 등에 초점을 맞추고 있으며, 굴착의 주체가 되는 Shield TBM 장비와 장비에 의해 발생하는 트러블로 인한 공기지연에 대한 연구는 수행되어지지 않았다. 따라서 본 연구에서는, Shield 터널 공사 중 Shield 장비의 초기굴진을 대상으로 하여, 굴진 시 발생하는 트러블에 의해 야기되는 공기지연 시간 및 원인을 FMEA기법을 이용하여 분석하였고, 공기지연 방지를 위한 관리 방한의 제시를 목적으로 각각의 트러블 항목들에 대한 우선순위를 결정하는 연구를 수행하였다. 그 결과 이전까지의 연구들에서 지반적 요소들에 비해 상대적으로 소홀히 다루어진 Shield TBM의 기계적 요소들의 트러블이 공기지연을 일으키는 주요 원인이라는 것을 알 수 있었다. 각각의 공기지연 발생 요소 중 공기지연 위험도가 큰 몇몇 항목을 대상으로 트러블 관리방안을 제시함으로써, 본 굴진 및 향후 유사 조건의 프로젝트 수행 시 보다 효율적으로 공사를 수행할 수 있을 것으로 기대된다.