• Title/Summary/Keyword: Existing Dam

Search Result 266, Processing Time 0.026 seconds

Safety Management Improving Way of Small Agricultural Reservoir (소규모 농업용 저수지의 안전관리 개선 방향)

  • Shin, Eun-Chul;Lee, Jong-Keun
    • Journal of the Korean Geosynthetics Society
    • /
    • v.11 no.3
    • /
    • pp.53-58
    • /
    • 2012
  • There are about 17,531 agricultural small dams and reservoirs in Korea. Ninety five percent of the small dams were constructed by earthfill and they were suffered severe damages or expected to repairs or rehabilitation. Therefore dams are evaluated and are identified their problems. Small Dams should be repaired before too late. Small dam safety evaluation is required to guarantee the proper functions of the existing agricultural dams and reservoirs in time and to minimize the damage.

Securement of Upland Irrigation Water in Small Dams through Periodical Management of Storage Level (기간별 저수 관리를 통한 소규모 댐의 밭 관개용수 확보)

  • Kim, Sun-Joo;Lee, Joo-Yong;Kim, Phil-Shik
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.47 no.2
    • /
    • pp.3-12
    • /
    • 2005
  • The objective of this study is securement of upland irrigation water using storage level management of small dams. However, it is not new development of water resources but securement of water using storage level management of existing dam. This study has enhanced the water utilization coefficient of dam, after extra available water had been calculated by application of periodical management storage level and this water is used to other water like the upland irrigation water demand. As the result of application, it can secure extra available water except the water requirement. Minimum extra available water except flood is about $20,000,000\;m^3$ and crop irrigation water demand of 10yr frequency is about $2,033,000\;m^3$ in Seongju. The utilization of crop irrigation water can be possible. And extra available water is about $3,102,000\;m^3$ in 2000, $1,959,000\;m^3$ in 2001 except flood period and crop irrigation water demand of 10yr frequency is about $2,272,000\;m^3$ in Donghwa. It is judged that extra available water cannot be used to crop irrigation water during the dry season in Dongwha. Consequently, when management storage level is determined and more efficient use of water is gotten like this study, water utilization coefficient will be enhanced.

Search for Available Water Sources and Water Resources Management of Ulsan Area (울산지역의 대체 상수원 개발 및 용수대책)

  • Kim, Seong Deuk;Lee, Byoung Ho;Cho, Hong Je;Park, Hung Suck;Kim, Young Hye
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.8 no.3
    • /
    • pp.34-40
    • /
    • 1994
  • Industrial Complex in Ulsan is one of the most important areas in the nation. It includes ship building, automobile production, petroleum industry, non-metalic industry, and related industries. However, water for drinking and industry use has been and will be short seriously. Thus available drinking water sources were searched. By rebuilding the two existing dams 20m higher than the present levels, $500,000m^3/day$(for 200days) of water sources may be produced. Additional volume of $13,000m^3/day$(for 200days) can be obtained by a number of small dam construction in the vincity area. Underground water of about $50,000m^3/day$ may also be available. The total of $680,000m^3/day$ could be produced in Ulsan area, which is enough for the population of 1,200,000 in Ulsan area even after year 2011. This newly searched volume of water may be free from pollution. Raising the dam levels may also prevent Ulsan city from chronic flooding problems. Additional advantage is that as much as the newly developed water resources can be supplied to the industrial complexes.

  • PDF

Drinking Water Usage with Riverbed water and Groundwater

  • Kim, Il-Bae;Lee, Soo-Sik;Choi, Yun-Yeong;Suh, Jung-Ho;Lee, Hak-Sung
    • Proceedings of the Korean Environmental Sciences Society Conference
    • /
    • 2003.11a
    • /
    • pp.151-154
    • /
    • 2003
  • With estmating drinking water demands of Ulsan city, the amount would be increased from 523,000ton/day in 2006 to 635,000 ton/day in 2016. Also, the dependence of Nakdong River on the Ulsan city as a source of drinking water will be very high up to 54.4% of total drinking water demands. Small-scale drinking water dam is no economical because of excessive construction cost and long construction period. However, development of riverbed and ground water of existing rivers is more economical than that of small-scale drinking water dam. In this study, to utilized Dongchun River as a drinking water resource, Modflow model was used to predict the amount of riverbed and ground water of Dongchun River basin. As a result, available amount of riverbed water was assumed in 6,000 ton/day by worst case (when perfect dry stream) and in case of ground water, it was assumed in 17,800 ton/day.

  • PDF

Study on the direct approach to reinitialization in using level set method for simulating incompressible two-phase flows (비압축성 2 상유동의 모사를 위한 level set 방법에서의 reinitialization 직접 접근법에 관한 연구)

  • Cho, Myung-H.;Choi, Hyoung-G.;Yoo, Jung-Y.
    • 한국전산유체공학회:학술대회논문집
    • /
    • 2008.03b
    • /
    • pp.568-571
    • /
    • 2008
  • The computation of moving interface by the level set method typically requires reinitializations of level set function. An inaccurate estimation of level set function ${\phi}$ results in incorrect free-surface capturing and thus errors such as mass gain/loss. Therefore, accurate and robust reinitialization process is essential to the free-surface flows. In the present paper, we pursue further development of the reinitialization process, which evaluates directly level set function ${\phi}$ using a normal vector in the interface without solving the re-distancing equation of hyperbolic type. The Taylor-Galerkin approximation and P1P1splitting FEM are adopted to discretize advection equation of the level set function and the Navier-Stokes equation, respectively. Advection equation of free surface and re-initialization process are validated with benchmark problems, i.e., a broken dam flow and time-reversed single vortex flow. The simulation results are in good agreement with the existing results.

  • PDF

Reestimation of Hydrologic Design Data in Donghwa Area (동화지구 절계 수문량 재추정)

  • Kwon, Soon-Kuk;Lee, Jae-Hyoung;Jung, Jae-Sung;Chon, Il-Kweon;Kim, Min-Hwan;Lee, Kyung-Do
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.46 no.6
    • /
    • pp.3-10
    • /
    • 2004
  • The fundamental study of hydrologic redesign of Donghwa area located in a sccond tributary of Seomjin river was performed. The amounts of hydrologic design were estimated using the available cumulated hydrology data provided by Korea Agricultural and Rural Infrastructure Corporation (KARICO). The management status of The water resources in Donghwa area was also widely surveyed. The probability rainfalls, probable maximum precipitation (PMP) and probability floods were estimated and subsequently their changes analyzed. The amount of 200 year frequency rainfall with l day duration was 351.1 mm, 2.5 % increased from the original design value, and The PMP was 780.2 mm. The concentration time was reestimated as 2.5 hours from existing 2.4 hours. Soil Conservation Service(SCS) method was used to estimate effective rainfall- The runoff curve number was changed from 90 to 78, therefore the maximum potential retention was 71.6 mm, 154 % increased from the original value. The Hood estimates using SCS unit hydrograph showed 8 % increase from original value 623 $m^3$/s to 674 $m^3$/s and The probable maximum Hood was 1,637 $m^3$/s. Although the Row rate at the dam site was increased, the Hood risk at the downstream river was decreased by the Hood control of the Donghwa dam.

A Numerical Study on Characteristics of Flood Wave Passing through Urban Areas (1) : Development and Verification of a Numerical Model (도시지역을 관통하는 홍수파의 특성에 관한 수치적 연구 (1) : 수치모형의 개발 및 검증)

  • Jeong, Woo-Chang;Lee, Jin-Woo;Cho, Yong-Sik
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • v.9 no.6
    • /
    • pp.89-97
    • /
    • 2009
  • In this study, a two-dimensional unstructured finite volume model based on the shallow-water equations and well-balanced HLLC scheme is developed. The model is verified by applying to various one- and two-dimensional problems related to the analyses of dam-break wave. The predicted numerical results agree very well with available analytical solutions and laboratory measurements. The model provides slightly more accurate results compared with the existing models.

Study on the Solution of Reinitialization Equation for Level Set Method in the Simulation of Incompressible Two-Phase Flows (비압축성 2 상유동의 모사를 위한 Level Set 방법의 Reinitialization 방정식의 해법에 관한 연구)

  • Cho, Myung-Hwan;Choi, Hyoung-Gwon;Yoo, Jung-Yul
    • Transactions of the Korean Society of Mechanical Engineers B
    • /
    • v.32 no.10
    • /
    • pp.754-760
    • /
    • 2008
  • Computation of moving interface by the level set method typically requires the reinitialization of level set function. An inaccurate estimation of level set function $\phi$ results in incorrect free-surface capturing and thus errors such as mass gain/loss. Therefore, an accurate and robust reinitialization process is essential to the simulation of free-surface flows. In the present paper, we pursue further development of the reinitialization process, which evaluates level set function directly using a normal vector on the interface without solving there-distancing equation of hyperbolic type. The Taylor-Galerkin approximation and P1P1 splitting/SUPG (Streamline Upwind Petrov-Galerkin) FEM are adopted to discretize advection equation of the level set function and the incompressible Navier-Stokes equation, respectively. Advection equation and re-initialization process of free surface capturing are validated with benchmark problems, i.e., a broken dam flow and timereversed single vortex flow. The simulation results are in good agreement with the existing results.

Study on Daeryuk Baekje: Focusing on Literature Research

  • Panjin KIM;Myoung-Kil YOUN
    • Journal of Koreanology Reviews
    • /
    • v.2 no.2
    • /
    • pp.27-34
    • /
    • 2023
  • Purpose: The purpose of this study is to discuss on Daeryuk Baekje (the Continental Baekje), as new researches are beginning to emerge on the existing theory that Baekje exits only in the Korean Peninsula. Research design, data and methodology: We intend to systematically reveal this new theory by carefully examining the early founding process of Baekje, the process of determining its capital city and the ancient documents related to it. Objective analysis and research were conducted through literature research including not only domestic research data but, also research data from overseas. Results: Baekje existed on the Continent and on the Peninsula in the early days of Baekje establishment, before the Kingdom was established, so-called Hanseong Baekje. Conclusion: Biryu and Onjo settled down near Yoseo and Jinpyeong when they first moved to the south from Goguryeo. Biryu led hundred families to Michuhol and established Baekje. Onjo established Sipje at the Wirye Castle with ten of his servants. After Biryu's death the people of Baekje pledge allegiance to Onjo. The Sipje changed its country's name to Baekje. This illustrates that the country was operated with a capital in two regions, in the Continent and the Korean Peninsula. The country was ruled under two royal castles with 22 provincial governments (Dam-ro). Each area was ruled by the royal families and the competent prince among them succeeded to the next throne. It is a unique governing system and illustrates that Baekje existed in the Continent.

Analysis of Economic Effectiveness for Flood Control of Dam (댐의 홍수조절에 의한 경제적 효과분석)

  • Choi, Seung-An;Yi, Choong-Sung;Shim, Myung-Pil;Kim, Hung-Soo
    • Journal of Korea Water Resources Association
    • /
    • v.40 no.5
    • /
    • pp.383-396
    • /
    • 2007
  • The studies on efficiency of flood control reservoir has been introduced into four categories including direct flood control contribution by reservoir, flow-duration change and environmental-ecological change in downstream of dam and flood damage estimation of flood plain. In spite of all the previous approaches, the quantification of the effect of reservoir on the flood control in planning stage is quite complex due to lack of a standard for quantifying feasibility of project. In this study, we develop a methodology that can clearly and accurately quantify the flood damage reduction together with the existing flood level reduction at downstream. The proposed approach uses three appraisal standards of flood control: 'potential safety', 'relative risk' and 'absolute risk' according to the risk by stage. The developed methodology was applied to the Namhan river basin with the storm event of July, 2006. The result shows the damage reduction of 4,189 billion won was estimated. The economic benefits for the flood control effect by dam will greatly contribute to the public understanding of the importance and the effect of the flood control by dam.