Reestimation of Hydrologic Design Data in Donghwa Area  

Kwon, Soon-Kuk (서울대학교 농업생명과학대학)
Lee, Jae-Hyoung (전북대학교 공과대학)
Jung, Jae-Sung (순천대학교 공과대학)
Chon, Il-Kweon (호남대학교 공과대학)
Kim, Min-Hwan (서울대학교 대학원)
Lee, Kyung-Do (서울대학교 대학원)
Publication Information
Journal of The Korean Society of Agricultural Engineers / v.46, no.6, 2004 , pp. 3-10 More about this Journal
Abstract
The fundamental study of hydrologic redesign of Donghwa area located in a sccond tributary of Seomjin river was performed. The amounts of hydrologic design were estimated using the available cumulated hydrology data provided by Korea Agricultural and Rural Infrastructure Corporation (KARICO). The management status of The water resources in Donghwa area was also widely surveyed. The probability rainfalls, probable maximum precipitation (PMP) and probability floods were estimated and subsequently their changes analyzed. The amount of 200 year frequency rainfall with l day duration was 351.1 mm, 2.5 % increased from the original design value, and The PMP was 780.2 mm. The concentration time was reestimated as 2.5 hours from existing 2.4 hours. Soil Conservation Service(SCS) method was used to estimate effective rainfall- The runoff curve number was changed from 90 to 78, therefore the maximum potential retention was 71.6 mm, 154 % increased from the original value. The Hood estimates using SCS unit hydrograph showed 8 % increase from original value 623 $m^3$/s to 674 $m^3$/s and The probable maximum Hood was 1,637 $m^3$/s. Although the Row rate at the dam site was increased, the Hood risk at the downstream river was decreased by the Hood control of the Donghwa dam.
Keywords
Design rainfall; Unit hydrograph; Design flood; Hydrologic design;
Citations & Related Records
연도 인용수 순위
  • Reference
1 HEC. 1998. River analysis system HEC-RAS. US Army Corps of Engineers. ch. 6-7
2 HEC, 2000. Hydrologic modeling system HEC-HMS. US Army Corps of Engineers. ch. 10-11
3 KARICO. 1987. Plan report of the agricultural water development project for Donghwa area. Korea Agricultural and Rural Infrastructure Corporation, Uiwang, Gyunggi, 15-42, 233-262. (in Korean)
4 KARICO. 2002. Fundamental data in hydrology for Sungiu and Donghwa areas. Korea Agricultural and Rural Infrastructure Corporation, Uiwang, Gyunggi, 3-8. (in Korean)
5 KARICO. 2002. Flood control capacity analysis of irrigation dam (reservoir) for extraordinary storm and plans for improving the capacity. Korea Agricultural and Rural Infrastructure Corporation. Uiwang, Gyunggi, 41-45. (in Korean)
6 Kwun, S. K. 2000. Applied hydrology. Hyang moonsa. 48-59. (in Korean)
7 Mays. L. W. 2001. Water resources engineering. John Wiley & Sons. 649-704
8 MOCT. 2000. Construction of Korean probability rainfall diagram. Ministry of Construction and Transportation. 77-154, 206, 235-236. (in Korean)