• Title/Summary/Keyword: Evaluation Schedule

Search Result 268, Processing Time 0.026 seconds

The Study of Optimal Performance Improvement Method for Aircraft of Various Variants within the Same Type (다양한 형상의 동일 기종 항공기에 대한 성능개량 최적 구현 방안 연구)

  • Kim, Youngil;Ahn, Seungbeom;Choi, Myeongseok
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.25 no.3
    • /
    • pp.311-320
    • /
    • 2022
  • In this paper, we studied the optimal method of improving performance for aircraft having various variants within the same type. The study defined configuration of an entire fleet of aircraft being subject to a performance improvement program. And selected the most complicated aircraft configuration among them as a Standard Aircraft for modification by according to the proposed Aircraft Selection Process for developing an optimal Aircraft Performance Improvement Process. Based on the selected the Standard Aircraft, drew a system integration design result and carried out Evaluation Test and obtained Airworthiness Certification. Created the database with the design data of the Standard Aircraft, Evaluation Test, and Airworthiness Certification results, and applied it to variants of aircraft to complete the performance improvement program with optimized schedules and costs. By applying the proposed method to IFF performance improvement program, drew optimal system integration design and completed the program with minimized schedule.

Effective Analysis Framework for Construction Post Evaluation (건설공사 사후평가 수행결과의 효과적인 분석방법)

  • Kim, Tae Yeong;Park, Hee-Sung
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.36 no.6
    • /
    • pp.1145-1152
    • /
    • 2016
  • A construction post evaluation is introduced to provide information that can be used for similar construction projects in the future through the evaluation of the efficiency of a public construction project and the verification of the appropriateness of the project results. However, it is not widely used due to a lack of awareness of the method. For this reason, the aim of this study is to provide a basic frame that can be utilized as a reference for a similar project in the future based on the construction post evaluation. More specifically, a more effective analysis method for the construction post evaluation is proposed and then an exemplary analysis is performed based on the method. The paper analyzes 293 cases stored in construction CALS. Construction cost growth rates of railway projects are tend to be greater than other project types like highway, expressway, and harbour. Then, construction schedule grwoth rates of expressway are greater than others. This is expected to provide useful information for a future project, and serve as a basic frame. Moreover, it is also meaningful that a project can be analyzed from different perspectives through the construction post evaluation.

An Exploratory Study on the Relationship with Previous Project Risk Evaluation and Project Performance (사전 프로젝트 리스크 평가와 프로젝트 성과와의 관계에 관한 탐색적 연구)

  • Hosnag, Kim;Kyungsik Yang
    • Journal of Service Research and Studies
    • /
    • v.12 no.3
    • /
    • pp.70-92
    • /
    • 2022
  • Project risk assessment is the most important activity performed at the beginning of a project because it can judge the performance of the project in advance. In this study, We were evaluated risk with traditional risk factors such as technology and schedule, etc, and Indirect risks factors such as financial, strategic, and special risks. and then, we analyzed what kind of relationship these risk evaluation factors have on business performance and customer satisfaction. As a result of the research, it was found that the risk evaluation items had a relationship with performance and customer satisfaction. However, It is possible that the performance may differ depending on how risks are managed after risk assessment. Therefore, follow-up studies should be conducted, including information on risk management practices. This study is meaningful that presenting practical risk evaluation items and at the same time identifying the relationship with performance. We plan to further the study in future studies including the evaluation of risk management process.

Improvement Plan of Post Construction Evaluation: Focus on Construction Performance (건설공사 사후평가 개선방안: 사업수행성과 중심으로)

  • Park, Heesung;Kim, Tae Yeong
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.44 no.3
    • /
    • pp.375-383
    • /
    • 2024
  • The size of the construction industry is increasing, and its impact on the entire national industry is also significant. However, construction cost increases, construction period delays, safety accidents, and quality problems occur during the construction process. This paper analyzed the construction cost, construction period, and change order performance for civil infrastructures for which post evaluation was performed. The analysis was conducted by dividing civil engineering facilities by type, construction nature, construction cost, contract nature, and delivery method. Planned and actual construction cost and period were compared during the planning, design, and construction process of civil engineering facilities. There is a possibility of input errors in project performance data, this paper proposes to the post-evaluation center should perform post-evaluation. Also, post-evaluation implementation guidelines for change orders should be revised. Additionally, further analysis of each facility was proposed through continuous data collection.

Development and Evaluation of Model-based Predictive Control Algorithm for Effluent $NH_4-N$ in $A^2/O$ Process ($A^2/O$ 공정의 유출수 $NH_4-N$에 대한 모델기반 예측 제어 알고리즘 개발 및 평가)

  • Woo, Dae-Joon;Kim, Hyo-Soo;Kim, Ye-Jin;Cha, Jae-Hwan;Choi, Soo-Jung;Kim, Min-Soo;Kim, Chang-Won
    • Journal of Korean Society of Environmental Engineers
    • /
    • v.33 no.1
    • /
    • pp.25-31
    • /
    • 2011
  • In this study, model-based $NH_4-N$ predictive control algorithm by using influent pattern was developed and evaluated for effective control application in $A^2/O$ process. A pilot-scale $A^2/O$process at S wastewater treatment plant in B city was selected. The behaviors of organic, nitrogen and phosphorous in the biological reactors were described by using the modified ASM3+Bio-P model. A one-dimensional double exponential function model was selected for modeling of the secondary settlers. The effluent $NH_4-N$ concentration on the next day was predicted according to model-based simulation by using influent pattern. After the objective effluent quality and simulation result were compared, the optimal operational condition which able to meet the objective effluent quality was deduced through repetitive simulation. Next the effluent $NH_4-N$ control schedule was generated by using the optimal operational condition and this control schedule on the next day was applied in pilot-scale $A^2/O$ process. DO concentration in aerobic reactor in predictive control algorithm was selected as the manipulated variable. Without control case and with control case were compared to confirm the control applicability and the study of the applied $NH_4-N$control schedule in summer and winter was performed to confirm the seasonal effect. In this result, the effluent $NH_4-N$concentration without control case was exceeded the objective effluent quality. However the effluent $NH_4-N$ concentration with control case was not exceeded the objective effluent quality both summer and winter season. As compared in case of without predictive control algorithm, in case of application of predictive control algorithm, the RPM of air blower was increased about 9.1%, however the effluent $NH_4-N$ concentration was decreased about 45.2%. Therefore it was concluded that the developed predictive control algorithm to the effluent $NH_4-N$ in this study was properly applied in a full-scale wastewater treatment process and was more efficient in aspect to stable effluent.

Alternative Evaluation Model for Tower Crane Operation Plan in Modular Construction - Focusing on Modular Unit Installation and Finishing works - (모듈러 건축 타워크레인 운용 계획의 대안 평가 모델 - 유닛 설치 및 마감공사를 중심으로 -)

  • Kim, Joo Ho;Park, Moonseo;Lee, Hyun-Soo;Hyun, Hosang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.2
    • /
    • pp.50-60
    • /
    • 2018
  • Recently, modular construction method has been widely applied to projects with repetitive processes including dormitory, the residential facility, and the hotel construction due to reduced labor input and shortened construction schedule. Generally, about 40% of total on-site construction cost excluding unit installation cost, is put on exterior finishing work, and thus management of finishing work is deemed important in maintaining the targeted schedule and cost. Since limited equipment is shared so that subsequent activities are not affected while carrying out on-site installation and finishing work, lifting plan becomes more important for modular projects with greater portion of finishing work load. In this regard, tower crane operation plan may take the form of a single cycle or multiple cycles in which equipment efficiency can be affected. However, difficulties exist in evaluating alternatives to tower crane operation plans supporting unit installation and finishing work. Therefore, this study aims to evaluate the alternative of tower crane operation method according to the cyclic period setting in modular building site to determine the effect on T/C uptime and process by parameterizing lifting time for unit and exterior finishing material, lift cycle for unit and exterior finishing material and time required for finishing work. Accordingly, this study develops a simulation model that can increase the tower crane efficiency by controlling the work speed. An academic contribution of this study is to suggest a resource leveling method applying the concept of lifting cycle, and further is expected to be managerially used as a basis for an alternative evaluation of equipment plan.

Urological Evaluation of Tethered Cord Syndrome

  • Park, Kwanjin
    • Journal of Korean Neurosurgical Society
    • /
    • v.63 no.3
    • /
    • pp.358-365
    • /
    • 2020
  • To describe how to perform urological evaluation in children with tethered cord syndrome (TCS). Although a common manifestation of TCS is the development of neurogenic bladder in developing children, neurosurgeons often face difficulty in detecting urological problems in patients with TCS. From a urological perspective, diagnosis of TCS in developing children is further complicated due to the differentiation between neurogenic bladder dysfunctions and transient bladder dysfunctions owing to developmental problems. Due to the paucity of evidence regarding evaluation prior to and after untethering, I have shown the purpose and tools for evaluation in my own practice. This may be tailored to the types of neurogenic bladder, developmental status, and risks for deterioration. While the urodynamic study (UDS) is the gold standard test for understanding bladder function, it is not a panacea in revealing the nature of bladder dysfunction. In addition, clinicians should consider the influence of developmental processes on bladder function. Before untethering, UDS should reveal synergic urethral movement, which indicates an intact sacral reflex and lack of TCS. Postoperatively, the measurement of post-void residual urine volume is a key factor for the evaluation of spontaneous voiders. In case of elevation, fecal impaction, which is common in spinal dysraphism, should be addressed. In patients with clean intermittent catheterization, the frequency-volume chart should be monitored to assess the storage function of the bladder. Toilet training is an important sign of maturation, and its achievement should be monitored. Signs of bladder deterioration should be acknowledged, and follow-up schedule should be tailored to prevent upper urinary tract damage and also to determine an adequate timing for intervention. Neurosurgeons should be aware of urological problems related to TCS as well as urologists. Cooperation and regular discussion between the two disciplines could enhance the quality of patient care. Accumulation of experience will improve follow-up strategies.

Dependence Potential of Propofol: Behavioral Pharmacology in Rodents

  • Cha, Hye-Jin;Cha, Ji-Hun;Cho, Hea-Young;Chung, Eun-Yong;Kwon, Kyoung-Jin;Lee, Jun-Yeon;Jeong, Ho-Sang;Kim, Hye-Soo;Chung, Hye-Joo;Kim, Eun-Jung
    • Biomolecules & Therapeutics
    • /
    • v.20 no.2
    • /
    • pp.234-238
    • /
    • 2012
  • Propofol is an anesthetic commonly used to provide sedation or to induce and maintain an anesthetic stated. However, there are reports which indicate propofol may cause psychological dependence or be abused. In the present study, we used various behavioral tests including climbing test, jumping test, conditioned place preference, and self-administration test to assess the dependence potential and abuse liability of propofol compared to a positive control (methamphetamine) or a negative control (saline or intralipid). Among the tests, the conditioned place preference test was conducted with a biased method, and the selfadministration test was performed under a fixed ratio (FR) 1 schedule, 1 h per session. No difference was found in the climbing test and jumping test, but propofol (30 mg/kg, i.p.) increased the rewarding effect in the conditioned place preference test, and it showed a positive reinforcing effect compared to the vehicle. These results indicate that propofol tends to show psychological dependence rather than physical dependence, and it seems not to be related with dopaminergic system.

Development of Web-based Logistics Information System Using Usability Evaluation (Usability 평가기법을 활용한 웹 기반 물류정보시스템 개발)

  • Jang, Kyoung-Yeol;Byun, Sang-Kyu;Yoo, Woo-Sik
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.29 no.4
    • /
    • pp.8-17
    • /
    • 2006
  • Presented in this paper was to evaluate and improve the usability of a web-based logistics information system. The system was developed for the domestic company to track and monitor its own transportation vehicles and for the customers to check the current location of their packages by using Global Positioning System (GPS) and Short Massage Service (SMS). Since the initial system was developed under a tight schedule set by the company, the system designers and programmers did not focus on the usability of the system but on the functionality. Consequently, some usability problems of the system were discovered during the heuristic usability evaluation. This study was required to solve these usability issues. Usability problems of the initial system were identified and analyzed, and the user's requirements for the system were re-evaluated to meet the company's expectation. Several alternative designs were developed by fitted guidelines and then a updated system was developed. The updated system had an empirical usability test to find how much the initial system was improved from the heuristic evaluation. Two kinds of data were gathered during the tests: objective (completion time and number of errors) and subjects' preference. Data showed the updated system is better than the initial system in terms of usability. Presented in this paper includes introduction of the Usability evaluation, usability engineering process applied in this research, alternative design of GUI, usability test and results.

EFFECTS OF EARLY FUNCTIONAL LOADING ON BONE FORMATION AROUND TITANIUM PLASMA SPRAYED IMZ IMPLANTS IN DOGS (성견에서 Titanium Plasma Sprayed IMZ 임플란트에 가해진 조기 기능하중의 골유착 및 골형성에 미치는 영향)

  • Jeon, Young-Sik;Han, Dong-Hoo
    • The Journal of Korean Academy of Prosthodontics
    • /
    • v.33 no.3
    • /
    • pp.550-568
    • /
    • 1995
  • The purpose of this study was to observe the effects of early functional on bone formation around titanium plsama sprayed IMZ implants. 15 IMZ implants were inserted on the mandibular premolar areaa in 5 mondgrel dogs. The inplants were divided into 4 groups according to it’s loading schedule : Temporary abutments were connected for functional loading 6weeks, 9weeks, and 12weeks after implants installation in group I, II, and III, respectively. Abutments were not connected in the control group. After polyfluorochrome sequential labeling, all animals were sacrificed and bone sections includig implants and the 1st. molar were removed and processed for histologic evaluation. From light and fluorescence microscopic evaluation as well as histomorphometric and EPMA analysis, following results were obtained : 1. Light microscopically, the osteoid tissues were observed much in the compact bone of unloaded group, and cancellous bone formation observed more in early loaded group. 2. Calcification and remodeling of bone took place faster in loaded group, especially in 6 weeks group. 3. Moderate to severe marginal bone resorption was observed in 6 weeks group, mainly on buccal crest. 4. There was no difference in the percentages of bone-to-metal contact among the experimental groups. 5. In quantitative analysis using EPMA, there was no difference in the content of calcium and phosphorus among the experimental groups, regardless of distance.

  • PDF