• 제목/요약/키워드: Electricity market

검색결과 611건 처리시간 0.023초

경쟁적 전력시장에서 복합화력발전의 입찰전략에 대한 연구 (A Study on the Bidding Strategies of Combined Cycle Plants in a Competitive Electricity Market)

  • 김상훈;이광호
    • 전기학회논문지
    • /
    • 제58권4호
    • /
    • pp.694-699
    • /
    • 2009
  • Combined cycle plants which feature distinct advantages for power generation such as fast response, high efficiency, environmental friendliness, fuel flexiblity represent the majority of new generating plant installations across the globe. Combined cycle plants have different operating modes where the operating parameters can differ greatly depending which mode is operating at the time. This paper addresses the bidding strategy model of combined cycle plants in a competitive electricity market by using a characteristic of multiple operating modes of combined cycle plants. Simulation results of case studies show that an operating mode among multiple ones is selected strategically in generation bidding for more profit of generation company.

PHEV 시장 형성 시 전력망에 미치는 영향 및 최적 충전 제어 전략에 관한 연구 (Study on the Power-Grid Impact and Optimal Charging Control Strategy with PHEV Market Penetration)

  • 노철우;김민수
    • 대한기계학회논문집B
    • /
    • 제33권4호
    • /
    • pp.278-287
    • /
    • 2009
  • Plug-in hybrid electric vehicle (PHEV) with capability of being recharged from the power-grid will reduce oil consumption. Also, the PHEV will affect the utility operations by adding additional electricity demand for charging. In this research, the power-grid impact by demand of PHEV charging is presented and the optimal charging control strategy for utility operators is proposed with simulated data. The penetration of PHEV is assumed to be 50% in the circumstances of Korean passenger car market and Korean power-grid market limitedly. To obtain smooth load shape and utilize the surplus electricity in power-grid at midnight and dawn, the peak of charging demand should be controlled to be located before 4:00 a.m., and the time slot which can supply the electricity power to PHEV should be allowed between 1:00 a.m.$\sim$7:00 a.m.

도매전력시장에서의 발전기 투자 수익 평가 모형 (Profit Evaluation Model for a Generator Investment in the Wholesale Electricity Market)

  • 정정원
    • 전기학회논문지
    • /
    • 제56권7호
    • /
    • pp.1205-1210
    • /
    • 2007
  • Several mechanisms are introduced for the procurement of capacity adequacy. In the competitive electricity market, however, it is a GENCO that makes generation investment decision. A GENCO will invest a new generator when it can get more profit than cost. There requires a model to evaluate profit with respect to a new generation investment. In the view of long-term investment, evaluation of a profit of a generator in the electricity market is quite different from that of short-term operation. In this paper, a new profit-evaluation model is proposed for the long-term generation investment. It can treat the probabilistic characteristics of generators, ie, forced-outage-rates, which affect profit of generators.

규제완화된 전력시장 하에서의 송전계통 신뢰도 평가방법의 개발 (Development of a Method for Reliability Evaluation of Transmission System under the Deregulated Electricity Market)

  • 차준민;김홍식;최재석;오광해
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2000년도 하계학술대회 논문집 A
    • /
    • pp.397-399
    • /
    • 2000
  • This paper presents a method for assessing reliability indices of transmission system. Because successful operation of electric power under the deregulated electricity market depends on transmission system reliability management, quantity evaluation of transmission system reliability is very important. The key point idea is based on that the reliability level of transmission system is equal to reliability level difference of between composite power system(HLII) and generation system(HLI). It is sure that risk indices of reliability of composite power system are larger than those of generation system. It is the reason that composite power system includes uncertainties and capacity limit of transmission lines. The characteristics and effectiveness of this methodology are illustrated by the case study using MRBTS.

  • PDF

전력수급기본계획의 적정 설비예비율 산정 개선방안 (A Study on the Assessment of Reasonable Reserve Margin in Basic Plan of Electricity Supply and Demand)

  • 김창수;이창호
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2006년도 제37회 하계학술대회 논문집 A
    • /
    • pp.418-419
    • /
    • 2006
  • After electricity power industry restructuring, "Long term power development plan", setting up by government, is replaced by "Basic plan of electricity supply and demand". In this basic plan, one of the most important factors is assessment of appropriate capacity margin. The benefit of GENCO is decided by the market price, and the price is largely affected by the level of reserve margin. As a consequence, appropriate reserve margin is determined by market power. However, Cost Based Pool(CBP) is a limited competitive market, and government policy for supply and demand is very important factor or reserve margin determination. This paper points out issues about existing reserve margin assessment method which is used in basic plan and suggests improved assessment method. In the case study, capacity margin is calculated by proposed assessment method and result shows the advantages of suggested method.

  • PDF

Assessing Alternative Renewable Energy Policies in Korea's Electricity Market

  • KIM, HYUNSEOK
    • KDI Journal of Economic Policy
    • /
    • 제41권4호
    • /
    • pp.67-99
    • /
    • 2019
  • This paper, focusing on the renewable portfolio standard (RPS), evaluates alternative renewable energy policies. We propose a tractable equilibrium model which provides a structural representation of Korea's electricity market, including its energy settlement system and renewable energy certificate (REC) transactions. Arbitrage conditions are used to define the core value of REC prices to identify relevant competitive equilibrium conditions. The model considers R&D investments and learning effects that may affect the development of renewable energy technologies. The model is parameterized to represent the baseline scenario under the currently scheduled RPS reinforcement for a 20% share of renewable generation, and then simulated for alternative scenarios. The result shows that the reinforcement of the RPS leads to higher welfare compared to weakening it as well as repealing it, though there remains room to enhance welfare. It turns out that subsidies are welfare-inferior to the RPS due to financial burdens and that reducing nuclear power generation from the baseline yields lower welfare by worsening environmental externalities.

BCD 기반 분산처리 기법을 이용한 연계전력시장 최적화 (Block Coordinate Descent (BCD)-based Decentralized Method for Joint Dispatch of Regional Electricity Markets)

  • 문국현;주성관
    • 전기학회논문지
    • /
    • 제58권1호
    • /
    • pp.23-27
    • /
    • 2009
  • The joint dispatch of regional electricity markets can improve the overall economic efficiency of interconnected markets by increasing the combined social welfare of the interconnected markets. This paper presents a new decentralized optimization technique based on Augmented Lagrangian Relaxation (ALR) to perform the joint dispatch of interconnected electricity markets. The Block Coordinate Descent (BCD) technique is applied to decompose the inseparable quadratic term of the augmented Lagrangian equation into individual market optimization problems. The Interior Point/Cutting Plane (IP/CP) method is used to update the Lagrangian multiplier in the decomposed market optimization problem. The numerical example is presented to validate the effectiveness of the proposed decentralized method.

경쟁시장내의 수요자원입찰을 고려한 모선별 한계가격의 구성요소산정 기법 (Calculation for Components of Locational Marginal Price considering Demand-Side Bidding in a Competitive Electricity Market)

  • 김현홍;김진호;박종배;신중린
    • 전기학회논문지
    • /
    • 제57권7호
    • /
    • pp.1157-1166
    • /
    • 2008
  • This paper presents a new approach for the evaluation of location marginal prices (LMPs) considering demand-side bidding (DSB) in a competitive electricity market. The stabilization of the electric power supply and demand balance is one of the major important activities in electric power industry. In this paper, we present an analytical method for calculation of LMPs considering DSB, which has opportunity to compete with generating units, as England & Wales Pool's DSB scheme[1]. Also, we propose a new approach that LMP considering DSB is divided into three components. The proposed approach can be used for the evaluation of demand-side bidding into the electricity market and the assessment of the influence of DSB on total production costs and LMPs as well as three components.

OPF를 이용한 경쟁적 전력시장에서의 송전가격 수익보정어 관한 연구 (Revenue Reconciled Transmission Pricing Using Optimal Power Flow in a Competitive Electricity Market)

  • 정상헌;정구형;김발호
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2003년도 하계학술대회 논문집 A
    • /
    • pp.624-626
    • /
    • 2003
  • Transmission pricing is one of important issues related to competitive electricity markets since rational pricing scheme ensures a fair competition between this market participants. Transmission pricing scheme is classified briefly into marginal cost pricing and embedded cost pricing. In economic efficiency, marginal cost pricing is more adequate for competitive electricity market. However, this pricing scheme requires revenue reconciliation since it cannot ensure full recovery of Transco's revenue requirements. This paper presents a new revenue reconciliation to maximize social welfare. For this analysis, this paper provides the results applied by various revenue reconciliation methodologies.

  • PDF

Solving Mixed Strategy Nash-Cournot Equilibria under Generation and Transmission Constraints in Electricity Market

  • Lee, Kwang-Ho
    • Journal of Electrical Engineering and Technology
    • /
    • 제8권4호
    • /
    • pp.675-685
    • /
    • 2013
  • Generation capacities and transmission line constraints in a competitive electricity market make it troublesome to compute Nash Equilibrium (NE) for analyzing participants' strategic generation quantities. The NE can cause a mixed strategy NE rather than a pure strategy NE resulting in a more complicated computation of NE, especially in a multiplayer game. A two-level hierarchical optimization problem is used to model competition among multiple participants. There are difficulties in using a mathematical programming approach to solve a mixed strategy NE. This paper presents heuristics applied to the mathematical programming method for dealing with the constraints on generation capacities and transmission line flows. A new formulation based on the heuristics is provided with a set of linear and nonlinear equations, and an algorithm is suggested for using the heuristics and the newly-formulated equations.