A Study on the Assessment of Reasonable Reserve Margin in Basic Plan of Electricity Supply and Demand

전력수급기본계획의 적정 설비예비율 산정 개선방안

  • Kim, C.S. (Korea Electrotechnology Research Institute) ;
  • Rhee, C.H. (Korea Electrotechnology Research Institute)
  • Published : 2006.07.12

Abstract

After electricity power industry restructuring, "Long term power development plan", setting up by government, is replaced by "Basic plan of electricity supply and demand". In this basic plan, one of the most important factors is assessment of appropriate capacity margin. The benefit of GENCO is decided by the market price, and the price is largely affected by the level of reserve margin. As a consequence, appropriate reserve margin is determined by market power. However, Cost Based Pool(CBP) is a limited competitive market, and government policy for supply and demand is very important factor or reserve margin determination. This paper points out issues about existing reserve margin assessment method which is used in basic plan and suggests improved assessment method. In the case study, capacity margin is calculated by proposed assessment method and result shows the advantages of suggested method.

Keywords