Organizations in some industries are still hesitant to adopt the Enterprise Resource Planning (ERP) system due to its high risk of failures. This study examined how industry classification affects the successful implementation of the ERP system. To achieve this goal, we reinvestigated the existing ERP Success Model that was developed by Chung with the data from various industry sectors, since Chung validated the model only in the engineering and construction industries. In order to test to see if the Chung model can be applicable outside the engineering and construction industries, the relationships between the ERP success indicators and the critical success factors in the Chung model and those in the sample data collected from ten different industry sectors were compared and investigated. The ten industry sectors were selected based on the Global Industry Classification Standard (GICS). We found that the impact of success factors on the success of implementing an ERP system varied across industry sectors. This means that the success of ERP system implementation can be industry-specific. Thus, industry classification should be considered as another factor to help IT decision makers or top-management avoid ERP system failures when they plan to implement a new ERP system.
Journal of the Korean Operations Research and Management Science Society
/
v.26
no.4
/
pp.1-21
/
2001
The purpose of this stuffy is to derive critical success factors for ERP system implementation by integrating managerial, technical. human resource and organizational culture factors welch have been proposed as influencing factors for the performance of ERP system implementation in previous studios. Especially, this stuffy divides ERP system implementation process into preparation stave, implement stage and settle-down and stabilization stave, and then derives critical success factors in each stage. The data for empirical analysis of the research model are collected from 64 companies and the respondents for questionnaire consist of ERP system implementation project managers and user department managers in companies which have already operated it after ERP system installation. The main results of this study are as follows. First, it derives 27 success factors through comprehensive review of various factors which may affect ERP system implementation performance, and categorizes them into one of three stapes preparation stave, implement stage, and settle-down and stabilization stage. Second, the relationship between many success factors at each stave (preparation stave, implement stage, and settle-down and stabilization stave) and performance variables is tested. As a result, the significant correlations between many success factors at each stage and ERP system implementation performance are found, and the difference among success factors in the degree of influencing the system performance is significantly shown. finally, the relationship between process-oriented performance variables and result-oriented performance ones is tested. As a result, it is found that there is significant correlation between process-oriented performance variables except for one variable-project resource management appropriateness - and result-oriented performance ones. The theoretical contribution of this study is to derive a comprehensive model of critical success factors for implementing ERP system project from the system deve1opment life cycle perspective, and empirically test it through field survey with a wide range of data collection. And, the practical implication of this study is to present the desirable guidelines for performing ERP system implementation project successfully.
Enterprise Resource Planning (ERP) system is one of key information technology to shape doing business. ERP adoption characteristics like IS planning and change management before ERP implementation are rising in importance, because of gaining competitive advantage. The purpose of this study is to analyze the impact of the characteristics of ERP adoption on ERP implementation success. From previous researches on ERP adoption and implementation, two characteristics of ERP adoption such as IS planning and change management, and 2 dependent variables such as process innovation and business performance, are identified. From data collection processes, 122 samples are collected. The results of hypothesis testing show that organizations with IS plan have higher implementation performance than organizations without IS plan. Also, organizations with the process of change management have higher implementation performance than organizations without the process of change management. Also, The interaction effect between IS planning and change management shows bigger impact in ERP implementation success.
The purpose of this paper is to examine the differences in the critical success factors for ERP adoption suggested by the system managers and the ERP consultants. The survey results indicated the following findings. First, there was no significant difference in the relative importance of the critical success factors between the system managers and the ERP consultants. Both groups agree that 'top manager's concern and support' is the most critical factor and that 'user involvement' is the second. However, the system managers tend to think 'training and education of end users' and 'cooperations among the project participants' more important than the consultants do. Second, both groups agree that the most important ERP contribution should be 'improvements in the business processes.' They also agree that the least important aspect is 'ERP's contribution to the individual's productivity.' In overall, the ordered lists of ERP evaluation criteria according to their importances were of no significant difference between the groups. Third the two groups showed differences when they were asked to evaluate the importance of the critical success factors for each of the ERP evaluation criterion. In general, the system managers tend to put more emphasis on 'training and education of end users' and 'adaptation of end users to the changed processes,' whereas the consultants tend to emphasize more on 'top managers' interest and supports' and 'project manager's capabilities and performance.' The differences in the critical success factors presented by the two groups indicated that more efforts need to be devoted to understanding other participant's interests and concerns in an ERP project team. Better coordinations based on the mutual understandings could improve the chance of achieving a success in adopting ERP packages.
Journal of Korean Society of Industrial and Systems Engineering
/
v.25
no.3
/
pp.64-77
/
2002
In every sectors of industry, the Business Process Reengineering(BPR) has been applied for taking competitive advantage under rapidly changing environment. A company adopting the BPR has begun to consider the introduction of Enterprise Resource Planning ERP systems. ERP systems can integrates many core activities of business, such as manufacturing management, human resource management, financial management, supply chain management by applying the best practices to facilitate a rapid decision-making, cost reductions, and organizational control. Unfortunately, however, many tentative risk factors are existed through each phase of the introduction of ERP systems. As a result, it can bring an enormous benefits to a company or it can be a disastrous for organization. Therefore, two critical questions regarding the introduction of ERP systems should be analyzed before actual introduction has happened. They are "how can ERP systems be introduced successfully\ulcorner" and "what are the critical success factors for each phase of introduction of ERP systems\ulcorner". Through this research, We studied and analyzed the characteristics of critical success factors requiring at each phase of the introduction of ERP systems by applying the questionnaire survey method. Finally, we suggest the list of barriers and critical success factors for each phase of introduction of ERP systems.tion of ERP systems.
Journal of the Korea Society of Computer and Information
/
v.10
no.4
s.36
/
pp.315-336
/
2005
The purpose of this study is to derive critical success factors for ERP system implementation by integrating managerial, technical, human resource and organizational culture factors which have been proposed as influencing factors for the performance of ERP system implementation in previous studies. The main results of this study are as follows. First, it derives 33 success factors through comprehensive review of various factors which may affect ERP system implementation performance, and categorizes them into one of three stages : preparation stage, implement stage, and settle-down and stabilization stage. Second, this study tests whether there are different correlations or not between the success factors of each ERP system implementation stage and ERP system implementation performance depending upon the strategies of ERP system implementation. As a result, it is shown that some of success factors have significantly different correlations with performance variables in accordance with BPR implementation timing.
This study proposes strategical, practical guide to build up ERP system through several case studies to large company and comparative analysis of success and fail factors. Key words in paper .is in summary of previous BPR and ERP studies, try to clarify relationship between BPR and ERP, derivative seeking of practical key success factors through several real cases studies to build up ERP system which is in-house development or customization of commercial package.
Proceedings of the Safety Management and Science Conference
/
2006.11a
/
pp.279-286
/
2006
Since 1990's, many enterprises have implemented ERP System. Especially, they want to become an advanced company use ERP implementation. Already, ERP system come to high level which is stabilized and support independent business process of many industry sectors. Although most companies had previous good plans, but those are not satisfied. Because of failed to change management and had many problem about Project team operation. Therefore, important success factors for ERP project are change management and organization activation for Project team. The purpose of this study is suggest to improve method about team activation through analysis the Project team member's individual personality as a factor that makes the success of Project team. This paper studied success factors of project team and plan for organization activation. The results of this study can be used for a successful implementation of the ERP system as make of Project team consider of individual personality and administer a Project team.
International Journal of Computer Science & Network Security
/
v.22
no.7
/
pp.397-403
/
2022
Enterprise resource planning (ERP) is widely adopted among enterprises and organizations. In recent years, researchers have become increasingly interested in factors related to ERP implementation success. In this paper, top management members, IT professionals, and end-users were interviewed in the study. The study used Hofstede's main cultural dimensions as a theoretical framework to identify cultural characteristics and their influence on ERP implementation within public organizations in Saudi Arabia. The study followed a qualitative methodology approach to carry on the study to investigate the national culture characteristics in Saudi Arabia that may influence ERP implementation success. The study found some culturally related factors that could influence success in ERP implantation projects in Saudi Arabia..
This study derives the critical success factors through discussion of expert group in operation stage of ERP system that is suggested by the prior study. Relative importance of the derived critical success factors are analyzed using Analytic Hierarchy Process(AHP). In the first layer of the hierarchy, organizational/ human resource factors are appeared to be the most important factors. In the second layer of the hierarchy, CEO support is evaluated as the most important success factor considering the weight of the 1st layer of the hierarchy followed by process optimization, change management, support of the operation department, and maintenance of process innovation organization. This study suggests that, in order to maximize the introducing effect, continuous support and attention of management is not the only requirement. Proper change management to handle the internal environment change caused by the introduction of the ERP system, support of operation department dedicated to ERP system, and separate department for continuous innovation of process are also required.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.