• Title/Summary/Keyword: Delay Tool

Search Result 254, Processing Time 0.027 seconds

The Study on development of a SAW SO$_2$ gas sensor (표면탄성파를 이용한 아황산 가스센서 개발에 관한 연구)

  • Lee, Young-Jin;Kim, Hak-Bong;Roh, Yong-Rae;Cho, Hyun-Min;Baik, Sung;,
    • The Journal of the Acoustical Society of Korea
    • /
    • v.16 no.2
    • /
    • pp.89-94
    • /
    • 1997
  • A new type SO$_2$ gas sensor with a particular inorganic thin film on SAW devices was developed. The sensor consisted of twin SAW oscillators of the center frequency of 54 MHz fabricated on the LiTaO$_3$ piezoelectric single crystal. One delay line of the sensor was coated with a CdS thin film that selectively adsorbed and desorbed SO$_2$, while the other was uncoated for use as a stable reference. Deposition of the CdS thin film was carried out by the spray pyrolysis method using an ultrasonic nozzle. The sensor could measure the concentration in air less than 0.25 parts per million of SO$_2$. Stability of the sensor turned out to be as good as less than 20ppm, recovery time after each measurement was as short as 5 minutes. Repeatability of the measurement was confirmed through so many reiterated experiments. Hence, the SAW sensor developed through this work showed promising performance as a microsensing tool of SO$_2$. Further work required to improve the performance of the sensor includes enhancement of the reactivity of the CdS thin film with SO$_2$ through appropriate dopant addition, an increase of the center frequency of the SAW device.

  • PDF

Probabilistic Earlier GMP Calculation Method for Apartment Using CM at Risk (CM at Risk를 적용한 공동주택의 확률론적 초기 GMP 산정방안)

  • Hyun, Chang-Taek;Go, Gun-Ho;Jin, Zhengxun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.18 no.3
    • /
    • pp.295-303
    • /
    • 2018
  • In the DBB delivery system, the design stage and the construction stage are separated. Because of this, design changes frequently occur, and problems such as construction cost overrun, schedule delay, and quality deterioration happen as well. Recently, in the construction industry CM at Risk(CM@R) delivery system, which can systematically solve the above-mentioned problems of DBB delivery system, meet various demands of clients, and overcome the limited cost and period. In the CM@R delivery system, the contractor negotiates for a maximum guaranteed price(GMP) with the client at the design stage, and the CM performer carries out the construction within the GMP. However, uncertainties are inherent in the GMP calculation because the calculation is based on unfinished drawings and documents. In this study, a Probabilistic Earlier GMP Calculation Method by combining a probabilistic tool of Monte Carlo simulation with a case based reasoning is proposed so that the uncertainty in GMP calculation is reflected. After the earlier GMP is calculated, a process to calculate the $2^{nd}$ GMP at the time of around 80 % of detailed deign and to negotiate with the client to fix the final GMP is proposed. The Probabilistic Earlier GMP Calculation Method is verified through the case study. In this study, researchers set the range of GMP through the proposed probabilistic GMP calculation and tried to reduce the risk through negotiation between the client and the CM performer. The proposed method and process would contribute to the successful introduction of CM@R in Korea.

A Context Free Grammar based Algorithm for Generating Playable Transcoding Paths of the Multimedia Presentation with Different End-to-End QoS (종단간 상이한 QoS를 갖는 멀티미디어 연출 재생을 위한 CFG 기반의 변환 경로 생성 알고리즘)

  • Chon, Sung-Mi;Lim, Young-Hwan
    • The KIPS Transactions:PartC
    • /
    • v.9C no.5
    • /
    • pp.699-708
    • /
    • 2002
  • Since various terminals and different networks get involved in playing of a multimedia presentation, the case that the presentation QoS at a destination should be different from the QoS of multimedia data at a source occurs frequently. For playing the multimedia presentation, the multimedia data at a source should be transcoded into the multimedia data satisfying the QoS required at the terminal. The problem of generating the transcoding path is that, for a given multimedia presentation, different transcoding paths depending the terminal and networks should be generated. That is, a fixed transcoding path cannot be applied to a multimedia presentation. Instead, whenever the terminal and network to play the presentation get determined, a proper transcoding path should be regenerated automatically. In this paper, the algorithm for generating the transcoding path and the method for checking the playability of the generated path are proposed. The generating algorithm adopted the technique of Context Free Grammar in describing the set of transcoding resources and a user's transcoding rules in order to utilize the well-known compiler techniques. For the playability check, a method of computing the transcoding time and the delay time between data units are proposed. Finally all the proposed methods were implemented in the stream engine, called Transcore and the presentation-authoring tool, called VIP, we had developed. And the test results with a sample scenario were presented at the last.

Program-level Maintenance Scheduling Support Model for Multiple University Facilities (프로그램레벨 다수 대학시설물 유지보수 일정계획 지원 모델)

  • Chae, Hong-Yun;Cho, Dong-Hyun;Park, Sang-Hun;Bae, Chang-Joon;Koo, Kyo-Jin
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.12
    • /
    • pp.303-312
    • /
    • 2018
  • The university facility is made up of multiple buildings and has many maintenance items. In addition, administrative constraints need to be handled within a limited period. Most maintenance work is small scale and multi-work construction, such as waterproofing, needs to be organized. The facility manager makes annual unit price contract with a maintenance company and carries out the maintenance work. On the other hand, delay and rework is occurring because existing maintenance work performed without scheduling based on the manpower input. This study proposed a scheduling model that can support the facility manager to manage maintenance works of multiple university facilities at the program level. The model consists of three stages in order. In object analysis, details of the maintenance items were analyzed and the quantity is calculated based on the quantity takeoff sheet. In resource analysis, the craftsmen and construction period of detailed works are derived for the effective input of craftsmen. In scheduling, the priority of each work and the optimal manpower input are derived. The optimal schedule is selected according to the goodness of fit. The applicability and effectiveness of the prototype was evaluated through a case study and interviews with case participants. The model was found to be an effective tool to support the scheduling of maintenance works for the facility manager.

A Study on Economic Evaluation Modeling of MVDC Distribution System for Hosting Capacity of PV System (태양광전원 수용을 위한 MVDC 배전망의 경제성평가 모델링에 관한 연구)

  • Lee, Hu-Dong;Kim, Ki-Young;Kim, Mi-Sung;Rho, Dae-Seok
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.22 no.3
    • /
    • pp.1-12
    • /
    • 2021
  • Technologies for an MVDC(medium voltage direct current) distribution system are being considered as an effective alternative to overcome the interconnection delay issues of PV systems. However, the implementation of a DC distribution system might lead to economic problems because of the development of DC devices. Therefore, this paper deals with the scale of a PV plant based on its capacity and proposes hosting-capacity models for PV systems to establish a network to evaluate the feasibility of an MVDC distribution system. The proposed models can be classified as AC and DC distribution systems by the power-supply method. PV systems with hundreds of MW, dozens of MW, and a few MW can be categorized as large-scale, medium-scale, and small-scale models, respectively. This paper also performed modeling for an economic evaluation of MVDC distribution system by considering both the cost of AC and DC network construction, converter replacement, operation, etc. The profit was composed of the SMP and REC rate of a PV plant. A simulation for economic evaluation was done for the MVDC distribution system using the present worth and equal-principal costs repayment method. The results confirmed that the proposed model is a useful tool to evaluate economic issues of a DC distribution system.

The Operation Analysis of Signalized Intersections Using ICU Method (ICU 방법을 활용한 신호교차로 운영분석)

  • Kim, Young Chan;Jeon, Jae Hyeon;Jeong, Young Je;Kim, Eun Jeoung
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.29 no.1D
    • /
    • pp.41-48
    • /
    • 2009
  • The capacity analysis of signalized intersection usually includes a HCM method used at home and abroad and a ICU method this study presents. The HCM method focuses on operation analysis measuring an intersection's delay in terms of given traffic volume, signal operation, and intersection structure data. This method includes planning and design analysis, but these analyses are complex due to being possible through repetitive operation analysis. However the ICU method is a powerful tool for planning and design analysis, because these are possible through brief traffic volume and geometry structure data and consider minimum green time. In this study, the authors studied the ICU method and compared the HCM and ICU by analyzing traffic volume scenarios. Also to consider effectiveness for application of the ICU method, the authors applied the ICU to capacity analysis of intersections on urban arterial for setting major intersection and effect analysis for changing crosswalk type, the number of lane, lane use and operation form of left turn. The result of the analyses shows that the ICU method can measure correct capacity of intersection consist of a broad road in urban area, and is effective for planning and design analysis. This study is expected that traffic experts can grasp correct intersection's capacity and carry out a proper planning or improvement by applying the ICU method to planning and design analysis.

Usefulness of video-EEG monitoring in paroxysmal nonepileptic events of children and adolescents (소아와 청소년의 돌발적 비간질 발작의 진단에 있어 비디오-뇌파 모니터링의 유용성)

  • Lee, Jee Yeon;Lee, Hee Sun;Choi, Wook Sun;Eun, So Hee;Lee, Ki Hyung;Enu, Baik Lin;Lee, Joo Won
    • Clinical and Experimental Pediatrics
    • /
    • v.51 no.1
    • /
    • pp.62-66
    • /
    • 2008
  • Purpose : In addition to epileptic seizures (ES), a variety of physiologic, organic and psychogenic disorders can manifest as paroxysmal behavioral events. Paroxysmal nonepileptic events (PNEs) are quite encountered in infants, young children, and adolescents. In a substantial proportion of cases, a careful history and examination will elucidate their nature. However, in other cases, it is necessary to differentiate PNEs from ES by video-electroencephalographic (EEG) monitoring. We report our experiences with PNEs in a group of children and adolescents who underwent video-EEG monitoring. Methods : From September, 2004 to June, 2006, one hundred thirty patients were monitored in the Pediatric Epilepsy Monitoring Units of Korea University Guro and Ansan hospitals. Their hospital charts were reviewed and video records of these events were analyzed. We observed all patients after video-EEG monitoring for more than 3 months. Results : Typical spells occurred during monitoring in 33 patients, not associated with a seizure pattern on EEG recordings. Two patients were diagnosed as frontal lobe epilepsy on basis of typical semiology and clinical characteristics, so 31 patients were documented to have PNEs finally. The mean age of patients was $7.2{\pm}5.8\;years$. The male to female ratio was 15 (48.4%) to 16 (51.6%). Among 31 patients, fifteen patients had associated disorders such as epilepsy, developmental delay, cerebral palsy, gastric ulcer, attention deficit hyperactivity disorder or depressive disorder. Somatoform disorder and factitious disorder was frequently seen in children more than 5 years old (P<0.05). Psychogenic disorder was more frequent in female (n=6) than in male (n=2) but there was no statistical significance (P>0.05). Conclusion : Our study suggests that video-EEG monitoring is an important diagnostic tool in the evaluation of paroxysmal behavioral events. With correct diagnosis of the PNEs, several unnecessary treatment could be avoided.

Recent Trends in Blooming Dates of Spring Flowers and the Observed Disturbance in 2014 (최근의 봄꽃 개화 추이와 2014년 개화시기의 혼란)

  • Lee, Ho-Seung;Kim, Jin-Hee;Yun, Jin I.
    • Korean Journal of Agricultural and Forest Meteorology
    • /
    • v.16 no.4
    • /
    • pp.396-402
    • /
    • 2014
  • The spring season in Korea features a dynamic landscape with a variety of flowers such as magnolias, azaleas, forsythias, cherry blossoms and royal azaleas flowering sequentially one after another. However, the narrowing of south-north differences in flowering dates and those among the flower species was observed in 2014, taking a toll on economic and shared communal values of seasonal landscape. This study was carried out to determine whether the 2014 incidence is an outlier or a mega trend in spring phenology. Data on flowering dates of forsythias and cherry blossoms, two typical spring flower species, as observed for the recent 60 years in 6 weather stations of Korea Meteorological Administration (KMA) indicate that the difference spanning the flowering date of forsythias, the flower blooming earlier in spring, and that of cherry blossoms that flower later than forsythias was 30 days at the longest and 14 days on an average in the climatological normal year for the period 1951-1980, comparing with the period 1981-2010 when the difference narrowed to 21 days at the longest and 11 days on an average. The year 2014 in particular saw the gap further narrowing down to 7 days, making it possible to see forsythias and cherry blossoms blooming at the same time in the same location. 'Cherry blossom front' took 20 days in traveling from Busan, the earliest flowering station, to Incheon, the latest flowering station, in the case of the 1951-1980 normal year, while 16 days for the 1981-2010 and 6 days for 2014 were observed. The delay in flowering date of forsythias for each time period was 20, 17, and 12 days, respectively. It is presumed that the recent climate change pattern in the Korean Peninsula as indicated by rapid temperature hikes in late spring contrastive to slow temperature rise in early spring immediately after dormancy release brought forward the flowering date of cherry blossoms which comes later than forsythias which flowers early in spring. Thermal time based heating requirements for flowering of 2 species were estimated by analyzing the 60 year data at the 6 locations and used to predict flowering date in 2014. The root mean square error for the prediction was within 2 days from the observed flowering dates in both species at all 6 locations, showing a feasibility of thermal time as a prognostic tool.

Patient Setup Aid with Wireless CCTV System in Radiation Therapy (무선 CCTV 시스템을 이용한 환자 고정 보조기술의 개발)

  • Park, Yang-Kyun;Ha, Sung-Whan;Ye, Sung-Joon;Cho, Woong;Park, Jong-Min;Park, Suk-Won;Huh, Soon-Nyung
    • Radiation Oncology Journal
    • /
    • v.24 no.4
    • /
    • pp.300-308
    • /
    • 2006
  • $\underline{Purpose}$: To develop a wireless CCTV system in semi-beam's eye view (BEV) to monitor daily patient setup in radiation therapy. $\underline{Materials\;and\;Methods}$: In order to get patient images in semi-BEV, CCTV cameras are installed in a custom-made acrylic applicator below the treatment head of a linear accelerator. The images from the cameras are transmitted via radio frequency signal (${\sim}2.4\;GHz$ and 10 mW RF output). An expected problem with this system is radio frequency interference, which is solved utilizing RF shielding with Cu foils and median filtering software. The images are analyzed by our custom-made software. In the software, three anatomical landmarks in the patient surface are indicated by a user, then automatically the 3 dimensional structures are obtained and registered by utilizing a localization procedure consisting mainly of stereo matching algorithm and Gauss-Newton optimization. This algorithm is applied to phantom images to investigate the setup accuracy. Respiratory gating system is also researched with real-time image processing. A line-laser marker projected on a patient's surface is extracted by binary image processing and the breath pattern is calculated and displayed in real-time. $\underline{Results}$: More than 80% of the camera noises from the linear accelerator are eliminated by wrapping the camera with copper foils. The accuracy of the localization procedure is found to be on the order of $1.5{\pm}0.7\;mm$ with a point phantom and sub-millimeters and degrees with a custom-made head/neck phantom. With line-laser marker, real-time respiratory monitoring is possible in the delay time of ${\sim}0.17\;sec$. $\underline{Conclusion}$: The wireless CCTV camera system is the novel tool which can monitor daily patient setups. The feasibility of respiratory gating system with the wireless CCTV is hopeful.

Evaluation of Uricult Trio Test as a Rapid Screening of UTI in Children with Fever (소아 요로감염 진단에 있어 신속배양검사(Uricult Trio)의 유용성에 관한 연구)

  • Lee, Jin;Kim, Eun Jin;Lee, Taek Jin;Chang, Jin Keun;Cha, Sung-Ho
    • Pediatric Infection and Vaccine
    • /
    • v.17 no.2
    • /
    • pp.74-82
    • /
    • 2010
  • Purpose : The Dipslide culture test is a rapid method for diagnosis of urinary tract infection (UTI). The aim of this study is to determine the diagnostic availability of a urine Dipslide test for evaluation of UTI in febrile children. Methods : Urine specimens from 151 febrile infants were inoculated by a routine blood agar urine culture method and the Dipslide test at the same time. Following incubation for 16-24 hours, the results of the Dipslide test were read at the next visit. Both results of Dipslide and those of routine culture were compared. Results : The mean age of subjects was 15${\pm}$10.6 months. There were 150 infants (99.3%) who had fever with a mean duration of 2.6${\pm}$2.6 days. Thirty two infants (21.2%) were diagnosed as having UTI. Sensitivity and specificity of Uricult Trio CLED medium were 59.4% and 84.8%, respectively. Sensitivity and specificity of Uricult Trio E. coli medium were 60.0% and 96.2%, respectively. The Pearson correlation coefficient between results of Uricult Trio CLED medium and urine culture was 0.438 (P=0.01). Correlation between results of Uricult Trio E. coli medium and urine culture was 0.617 (P=0.01). Conclusion : The Dipslide test requires only 16-24 hours with high specificity in terms of UTI caused by E. coli without the problems associated with specimen delay. This test seems to be helpful for exclusion of UTI in febrile infants and it may reduce unnecessary hospitalization and antibiotic use. However, further studies are required before the product can be recommended as a routine diagnostic tool.