• 제목/요약/키워드: Construction estimate

검색결과 1,596건 처리시간 0.025초

소형건축물 수직골조 대상 3D 프린팅 액티비티 분석 (An Analysis of 3D Printing Activities for Vertical Structure of Small Building)

  • 박형진;주기범;서명배
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2018년도 춘계 학술논문 발표대회
    • /
    • pp.308-309
    • /
    • 2018
  • Construction automation is needed to improve construction productivity. 3D printing is a key technology of the 4th industrial revolution, and when applied to the construction field, the ripple effect is very large. In this paper, we propose a 3D printing method that can predict the 3D printing process and estimate the construction duration for each process. Through literature review and expert consultation, eight 3D printing activities for structure work were derived. Construction duration and cost estimation for each activity will be needed in the future research.

  • PDF

공동주택 소형평형 공사비 트렌트 분석 (A Trend Analysis of Small Type House Construction Cost in Multi-Family Housing)

  • 박원영;차용운;박태일
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2021년도 봄 학술논문 발표대회
    • /
    • pp.261-262
    • /
    • 2021
  • Increasing construction costs are required due to increasing the supply of small type houses with changes in multi-family housing trends. However, a sharp rise in the construction cost of small type houses can raise the sale price, threatening the stability of national housing. Therefore, this study aims to estimate the change in the construction cost of small type houses from the basic construction cost of the sale price ceiling system and suggest an improvement plan.

  • PDF

ENVIRONMENTAL ECONOMICS FOR CONSTRUCTION

  • Suk hyun Kwon;Nam Ho Cho;Kyoung Hee Lee;Kyoung Ju Kim
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.280-285
    • /
    • 2011
  • This study aims to propose an assessment model on environmental economics which will provide useful information in making a decision for the implementation of pro-environmental and economical construction projects. To meet the objective, this study suggests a procedure to estimate environmental cost of construction projects. The model combines environmental load assessment and environmental value assessment. The environmental cost of pollutant generated from the construction project was estimated utilizing the Contingent Valuation Method (CVM) which is a value assessment method borrowed from economic science. The devised model is expected to provide a useful methodology that will scientifically support the planning and management of sustainable construction not only in the environmental aspect but also in the economical aspect.

  • PDF

건설공사 공사비 예측 및 관리기술 발전방향 : 호주 사례를 중심으로 (Direction for Improving Cost Estimation and Management of Construction Projects : Comparing to Australian System)

  • 지세현;박문서;이현수;윤유상
    • 한국건설관리학회논문집
    • /
    • 제9권2호
    • /
    • pp.170-181
    • /
    • 2008
  • 건설 프로젝트는 생산과정 이전에 설계도면을 바탕으로 예상되는 비용이 산정되며, 기획단계는 소요예산을 책정하고 설계단계는 예산에 합당한 효율적 대안을 찾으며, 정확한 입찰금액을 예측하기 위해 수차례 이루어진다. 특히, 물량산출 이전까지 예측되는 공사비의 정확도와 신뢰도는 매우 중요하다. 그러나, 국내의 경우 면적당 단가 방식 공사비 예측을 벗어나지 못할 뿐 아니라, 단계별 예측방법, 프로세스, 데이터 분석 및 관리기술 등이 표준화되어 체계적이고 종합적으로 관리되지 못하고 있다. 이에 국내 공사비 예측기술 및 관리기술 발전을 위하여 첫째, 표준화된 공사비 데이터베이스 구축과 국가차원의 종합적 관리가 필요하며, 구축 방법으로 다차원 공사비 데이터베이스 개념모델 CUBE를 제시하였다. 둘째 단계별 공사비 예측의 목적에 맞는 코스트 모델 적용이 필요하며, 코스트 모델의 방법론을 기획단계와 설계단계로 구분하여 제시하였다. 셋째, 이러한 두 가지 코스트 모델을 적용한 코스트 플래닝 프로세스를 제시하였고, 넷째, 공사비 예측 및 관리 전문인력 양성의 필요성을 제시하였다.

A Study on DEM-based Automatic Calculation of Earthwork Volume for BIM Application

  • Cho, Sun Il;Lim, Jae Hyoung;Lim, Soo Bong;Yun, Hee Cheon
    • 한국측량학회지
    • /
    • 제38권2호
    • /
    • pp.131-140
    • /
    • 2020
  • Recently the importance of BIM (Building Information Modeling) that enables 3D location-based design and construction work is being highlighted around the world. In Korea, the road map has been established to settle the design based on BIM using drone survey results by 2025. As the first step, BIM would be applied to road construction projects worth more than 50 billion Korean Won from 2020. On the other hand, drone survey regulation has been enacted and the data for drone survey cost were also included on Standard of construction estimate in 2020. However, more careful improvement is required to reflect drone survey results in BIM design and construction. Currently, Engineering instructions and Standard of construction estimate specifies that earthwork volume must be calculated by cross section method only. So it is required to add the method of DEM (Digital Elevation Model) based volume calculation on these regulations to realize BIM application. In order for that, this study verified the method of DEM based earthwork volume calculation. To get an accurate DEM for accurate volume computation, drone survey was carried out according to the drone survey regulation and then could get an accurate DEM data which have errors less than 3cm in X, Y and 6.8cm in H. As each DEM cell has 3D coordinate component, the volume of each cell can be calculated by obtaining the height of area of the cell then total volume is calculated by multiplying total number of cells by volume of each cell for the construction area. Verification for the new calculation method compare with existing method was carried out. The difference between DEM based volume by drone survey and cross section based volume by traditional survey was less than 1.33% and it can be seen that new DEM method will be able to be applied to BIM design and construction instead of cross section method.

제주도 내 회전교차로의 초기공사비 예측모델 개발 (Construction Cost Estimate Modeling of Roundabout at Preliminary Design Stage in Jeju)

  • 안진홍;이동욱
    • 대한토목학회논문집
    • /
    • 제34권4호
    • /
    • pp.1299-1306
    • /
    • 2014
  • 최근 들어 교통사고 예방 및 교통지체 해소는 물론 도로이용자 교통편의를 제공하는 목적으로 회전교차로 설치공사가 많이 발주되고 있다. 그러나 회전교차로 공사에 대한 개략적인 공사비를 예측하는 기준이나 단가가 정립되어 있지 않을 뿐만 아니라, 회전교차로 공사 초기 단계에서의 공사비 예측에 관한 체계적인 연구가 미흡한 실정이다. 본 연구에서는 현재 제주도내에 설치된 회전교차로를 중심으로 공사현장의 여건을 고려한 공사 초기단계에서 회전교차로공사 개략공사비 산정 모델을 제시하고자 하였다. 본 연구에서는 제주도내 25개 회전교차로공사의 설계자료를 바탕으로 회귀분석을 통해 개략공사비 회귀방정식을 도출하였으며, 매우 예측의 정확도가 높은 것으로 분석되었다. 도출된 회귀방정식에 대해서 검증한 결과 회귀방정식을 통한 추정금액과 설계금액과의 오차율이 2.3%, 3.7%, 5.8%의 차이를 보임으로써 매우 예측의 정확도가 높은 것으로 분석되었다.

회귀분석을 이용한 고속도로 건설공사 예비비의 산정 (Estimation of Contingency for Highway Construction Project Using Regression Analysis)

  • 윤유중;우성권
    • 대한토목학회논문집
    • /
    • 제26권4D호
    • /
    • pp.617-626
    • /
    • 2006
  • 예비비의 산정은 건설공사에서 필연적으로 발생할 수뿐이 없는 예측불가능한 상황으로 인한 공사비의 증가와 공기의 연장에 대처하기 위해서이다. 예비비의 본 취지는 불확실한 요소로 인한 예기치 못한 공사비 증가에 대비하기 위한 수동적인 면에서의 전략도 있지만, 불확실한 요소의 분석을 통해 사전에 공사저해 요소를 제거하고자 하는 능동적인 면에서의 전략도 가지고 있다. 따라서 중장기적인 관점에서 예비비제도가 우리나라에 올바르게 정착되기 위해서는 공사종류별, 특성별 불확실한 요소로 인한 설계변경 사례에 대한 자료의 축적 및 면밀한 분석으로 적정한 예비비를 반영할 수 있어야 할 것이다. 이에 본 연구에서는 고속도로 공사라는 특정 공사에서 설계변경사례를 분석하여 공사비에 영향을 미치는 요소를 판별하고 회귀분석을 이용하여 예비비율을 산정하는 절차를 제시하고자 한다.

갈등지수 산정에 의한 사업기간 및 비용 예측 - 공동주택 재건축사업을 중심으로 - (Estimate the Period and Cost of Projects by Estimating the Conflict Index - Concentrated on the Apartment Reconstruction Project -)

  • 이로나;이학기
    • 한국건설관리학회논문집
    • /
    • 제13권1호
    • /
    • pp.87-94
    • /
    • 2012
  • 공동주택 재건축사업은 주거환경개선 및 신규 주택공급이라는 도시 계획적 순기능을 가지고 있지만, 원주민의 재정착 실패 및 소득 재분배 실패, 부동산투기, 주택가격의 급상승, 사업주체간의 갈등, 제도 미비 등 복합적인 요인에 의하여 사업 의도가 왜곡되고 재건축사업의 추진이 원활히 진행되지 못하고 있는 실정이다. 재건축사업 주체간의 갈등은 사소한 갈등이 확산되어 분쟁과 소송으로 이어지며, 그 결과 재건축사업이 원활히 추진되지 못하게 되어 사업기간과 비용을 증가시키거나 중단되는 경우가 발생하게 된다. 본 논문은 재건축사업의 역기능 중 사업주체간의 갈등을 예방하고 해결하기 위한 노력으로 재건축사업 추진과정을 중심으로 갈등지수를 산정하고 갈등지수를 이용하여 재건축사업의 기간과 비용을 예측하고자 한다. 갈등지수는 재건축사업의 주체간의 갈등요인을 중심으로 신정하며, 갈등지수를 포함한 여러 가지 독립변수를 이용하여 재건축사업의 기간과 비용을 예측한다. 또한 갈등지수의 산정과 사업기간 및 비용 예측을 통하여 사업주체간의 분쟁과 경제적 손실을 최소화 하고 성공적인 재건축사업의 추진에 기여할 수 있다.

온실가스 규제에 대비한 건설장비 이산화탄소 배출량정보 활용방법론 개발 (Methodology Developments based on CO2 Emission Information from Construction Equipment for Greenhouse Gas Regulations)

  • 고지은;이진우;채윤병;한승우
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2018년도 춘계 학술논문 발표대회
    • /
    • pp.35-36
    • /
    • 2018
  • According to the nation's greenhouse gas emission statistics, greenhouse gas emissions have been stiffly increasing. Accordingly, the importance of CO2 reduction is more getting focused over the world. This trend makes the construction equipment be considered as a major target of reduction due to the large volume of emission. This study suggests the feasible methodology for estimating CO2 emission from construction equipment and for being easily applied on the job sites. The methodology is based on the collection from the segmented CO2 emission information of construction equipment. This study allows site personnels to estimate the total amount of CO2 and to take appropriate actions for reasching the environmental regulations.

  • PDF

표준품셈 관부설 및 접합공사 품 개정 요인 분석 (Analysis on the Factor of Revision of Pipe Laying Down Material and Connection Work Material)

  • 오재훈;안방율
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2018년도 춘계 학술논문 발표대회
    • /
    • pp.302-303
    • /
    • 2018
  • This study analyzed the major revision factors and revision contents for 'Construction-Standard-Production-Rate for Construction Works in 2018. Part 16. Pipe Laying Down and Connection" which was revised by the construction expense estimation standard's middle and long-term plans. The main reasons for the revision was analyzed to be unclear construction scope, limitations in applicable pipe material based on the facility type, labor force mainly composed of ordinary workers, limitations of labor force, and incomplete appropriation standard for the tool rent fee and equipment expenses. Through revision of factors, common items were newly established, organization was revised, the labor force was mainly composed of the technicians, and basis for appropriation of equipment expenses was arranged. In addition, through periodic revision, the appropriation standard for bend and special pipes was set. Consequently, more practical construction cost estimate standard is arranged through revision.

  • PDF