Construction automation is needed to improve construction productivity. 3D printing is a key technology of the 4th industrial revolution, and when applied to the construction field, the ripple effect is very large. In this paper, we propose a 3D printing method that can predict the 3D printing process and estimate the construction duration for each process. Through literature review and expert consultation, eight 3D printing activities for structure work were derived. Construction duration and cost estimation for each activity will be needed in the future research.
Increasing construction costs are required due to increasing the supply of small type houses with changes in multi-family housing trends. However, a sharp rise in the construction cost of small type houses can raise the sale price, threatening the stability of national housing. Therefore, this study aims to estimate the change in the construction cost of small type houses from the basic construction cost of the sale price ceiling system and suggest an improvement plan.
Suk hyun Kwon;Nam Ho Cho;Kyoung Hee Lee;Kyoung Ju Kim
국제학술발표논문집
/
The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
/
pp.280-285
/
2011
This study aims to propose an assessment model on environmental economics which will provide useful information in making a decision for the implementation of pro-environmental and economical construction projects. To meet the objective, this study suggests a procedure to estimate environmental cost of construction projects. The model combines environmental load assessment and environmental value assessment. The environmental cost of pollutant generated from the construction project was estimated utilizing the Contingent Valuation Method (CVM) which is a value assessment method borrowed from economic science. The devised model is expected to provide a useful methodology that will scientifically support the planning and management of sustainable construction not only in the environmental aspect but also in the economical aspect.
건설 프로젝트는 생산과정 이전에 설계도면을 바탕으로 예상되는 비용이 산정되며, 기획단계는 소요예산을 책정하고 설계단계는 예산에 합당한 효율적 대안을 찾으며, 정확한 입찰금액을 예측하기 위해 수차례 이루어진다. 특히, 물량산출 이전까지 예측되는 공사비의 정확도와 신뢰도는 매우 중요하다. 그러나, 국내의 경우 면적당 단가 방식 공사비 예측을 벗어나지 못할 뿐 아니라, 단계별 예측방법, 프로세스, 데이터 분석 및 관리기술 등이 표준화되어 체계적이고 종합적으로 관리되지 못하고 있다. 이에 국내 공사비 예측기술 및 관리기술 발전을 위하여 첫째, 표준화된 공사비 데이터베이스 구축과 국가차원의 종합적 관리가 필요하며, 구축 방법으로 다차원 공사비 데이터베이스 개념모델 CUBE를 제시하였다. 둘째 단계별 공사비 예측의 목적에 맞는 코스트 모델 적용이 필요하며, 코스트 모델의 방법론을 기획단계와 설계단계로 구분하여 제시하였다. 셋째, 이러한 두 가지 코스트 모델을 적용한 코스트 플래닝 프로세스를 제시하였고, 넷째, 공사비 예측 및 관리 전문인력 양성의 필요성을 제시하였다.
Cho, Sun Il;Lim, Jae Hyoung;Lim, Soo Bong;Yun, Hee Cheon
한국측량학회지
/
제38권2호
/
pp.131-140
/
2020
Recently the importance of BIM (Building Information Modeling) that enables 3D location-based design and construction work is being highlighted around the world. In Korea, the road map has been established to settle the design based on BIM using drone survey results by 2025. As the first step, BIM would be applied to road construction projects worth more than 50 billion Korean Won from 2020. On the other hand, drone survey regulation has been enacted and the data for drone survey cost were also included on Standard of construction estimate in 2020. However, more careful improvement is required to reflect drone survey results in BIM design and construction. Currently, Engineering instructions and Standard of construction estimate specifies that earthwork volume must be calculated by cross section method only. So it is required to add the method of DEM (Digital Elevation Model) based volume calculation on these regulations to realize BIM application. In order for that, this study verified the method of DEM based earthwork volume calculation. To get an accurate DEM for accurate volume computation, drone survey was carried out according to the drone survey regulation and then could get an accurate DEM data which have errors less than 3cm in X, Y and 6.8cm in H. As each DEM cell has 3D coordinate component, the volume of each cell can be calculated by obtaining the height of area of the cell then total volume is calculated by multiplying total number of cells by volume of each cell for the construction area. Verification for the new calculation method compare with existing method was carried out. The difference between DEM based volume by drone survey and cross section based volume by traditional survey was less than 1.33% and it can be seen that new DEM method will be able to be applied to BIM design and construction instead of cross section method.
최근 들어 교통사고 예방 및 교통지체 해소는 물론 도로이용자 교통편의를 제공하는 목적으로 회전교차로 설치공사가 많이 발주되고 있다. 그러나 회전교차로 공사에 대한 개략적인 공사비를 예측하는 기준이나 단가가 정립되어 있지 않을 뿐만 아니라, 회전교차로 공사 초기 단계에서의 공사비 예측에 관한 체계적인 연구가 미흡한 실정이다. 본 연구에서는 현재 제주도내에 설치된 회전교차로를 중심으로 공사현장의 여건을 고려한 공사 초기단계에서 회전교차로공사 개략공사비 산정 모델을 제시하고자 하였다. 본 연구에서는 제주도내 25개 회전교차로공사의 설계자료를 바탕으로 회귀분석을 통해 개략공사비 회귀방정식을 도출하였으며, 매우 예측의 정확도가 높은 것으로 분석되었다. 도출된 회귀방정식에 대해서 검증한 결과 회귀방정식을 통한 추정금액과 설계금액과의 오차율이 2.3%, 3.7%, 5.8%의 차이를 보임으로써 매우 예측의 정확도가 높은 것으로 분석되었다.
예비비의 산정은 건설공사에서 필연적으로 발생할 수뿐이 없는 예측불가능한 상황으로 인한 공사비의 증가와 공기의 연장에 대처하기 위해서이다. 예비비의 본 취지는 불확실한 요소로 인한 예기치 못한 공사비 증가에 대비하기 위한 수동적인 면에서의 전략도 있지만, 불확실한 요소의 분석을 통해 사전에 공사저해 요소를 제거하고자 하는 능동적인 면에서의 전략도 가지고 있다. 따라서 중장기적인 관점에서 예비비제도가 우리나라에 올바르게 정착되기 위해서는 공사종류별, 특성별 불확실한 요소로 인한 설계변경 사례에 대한 자료의 축적 및 면밀한 분석으로 적정한 예비비를 반영할 수 있어야 할 것이다. 이에 본 연구에서는 고속도로 공사라는 특정 공사에서 설계변경사례를 분석하여 공사비에 영향을 미치는 요소를 판별하고 회귀분석을 이용하여 예비비율을 산정하는 절차를 제시하고자 한다.
공동주택 재건축사업은 주거환경개선 및 신규 주택공급이라는 도시 계획적 순기능을 가지고 있지만, 원주민의 재정착 실패 및 소득 재분배 실패, 부동산투기, 주택가격의 급상승, 사업주체간의 갈등, 제도 미비 등 복합적인 요인에 의하여 사업 의도가 왜곡되고 재건축사업의 추진이 원활히 진행되지 못하고 있는 실정이다. 재건축사업 주체간의 갈등은 사소한 갈등이 확산되어 분쟁과 소송으로 이어지며, 그 결과 재건축사업이 원활히 추진되지 못하게 되어 사업기간과 비용을 증가시키거나 중단되는 경우가 발생하게 된다. 본 논문은 재건축사업의 역기능 중 사업주체간의 갈등을 예방하고 해결하기 위한 노력으로 재건축사업 추진과정을 중심으로 갈등지수를 산정하고 갈등지수를 이용하여 재건축사업의 기간과 비용을 예측하고자 한다. 갈등지수는 재건축사업의 주체간의 갈등요인을 중심으로 신정하며, 갈등지수를 포함한 여러 가지 독립변수를 이용하여 재건축사업의 기간과 비용을 예측한다. 또한 갈등지수의 산정과 사업기간 및 비용 예측을 통하여 사업주체간의 분쟁과 경제적 손실을 최소화 하고 성공적인 재건축사업의 추진에 기여할 수 있다.
According to the nation's greenhouse gas emission statistics, greenhouse gas emissions have been stiffly increasing. Accordingly, the importance of CO2 reduction is more getting focused over the world. This trend makes the construction equipment be considered as a major target of reduction due to the large volume of emission. This study suggests the feasible methodology for estimating CO2 emission from construction equipment and for being easily applied on the job sites. The methodology is based on the collection from the segmented CO2 emission information of construction equipment. This study allows site personnels to estimate the total amount of CO2 and to take appropriate actions for reasching the environmental regulations.
This study analyzed the major revision factors and revision contents for 'Construction-Standard-Production-Rate for Construction Works in 2018. Part 16. Pipe Laying Down and Connection" which was revised by the construction expense estimation standard's middle and long-term plans. The main reasons for the revision was analyzed to be unclear construction scope, limitations in applicable pipe material based on the facility type, labor force mainly composed of ordinary workers, limitations of labor force, and incomplete appropriation standard for the tool rent fee and equipment expenses. Through revision of factors, common items were newly established, organization was revised, the labor force was mainly composed of the technicians, and basis for appropriation of equipment expenses was arranged. In addition, through periodic revision, the appropriation standard for bend and special pipes was set. Consequently, more practical construction cost estimate standard is arranged through revision.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.