Estimate the Period and Cost of Projects by Estimating the Conflict Index - Concentrated on the Apartment Reconstruction Project -  

Lee, Ro-Na (동아대학교 건축공학과)
Lee, Hak-Ki (동아대학교 건축공학과)
Publication Information
Korean Journal of Construction Engineering and Management / v.13, no.1, 2012 , pp. 87-94 More about this Journal
Abstract
The apartment reconstruction projects have the proper functions such as residential environment improvement and the new housing allocation system; however, intention of the projects are distorted by the combination of factors, like failure of relocation of the original occupants and income redistribution, speculation in real estate, sharp rise in housing price, disputation between various interested parties, inadequate system and etc and it makes the projects unable to go well. Disputations and litigations are due to spread of the small conflict. As a result of the problems, it could not going smoothly and that lead to increase or stop the period and cost. This study is to estimate the period and cost using the conflict index so as to prevent and solve the problem which is among the conflict in the reverse functions. The conflict index has estimated focus on the conflict impact and the period and cost has been estimated using an variable independent including the conflict index. Also, estimated the conflict index and estimate of the period and cost are able to succeed with a minimum of disputation and money.
Keywords
Reconstruction project; Conflict index; Estimate the period of projects; Estimate the cost of projects;
Citations & Related Records
연도 인용수 순위
  • Reference
1 대통령자문 지속가능발전위원회 (2005), "공공갈등관리의 이론과 기법(上)". 논형
2 김영목 (2008), "중회귀분석법을 이용한 고속도로 공사비 추정 모형 개발", 박사학위논문, 부경대학교 대학원, P89
3 이도길 외2인, (2010) 재개발사업기간에 영향을 미치는 요인에 관한 연구, 도시행정학외 논문집, 제23집 제3호, P245
4 이상구 (2007), "주택재개발 사업요소기간에 영향을 미치는 요인 분석 및 기간리스크에 관한 연구", 석사 학위논문, 서울산업대학교 대학원
5 홍순주 (2008), "주택 재건축 사업의 갈등 해소 방안". 박사학위논문, 강원대학교 대학원